Proprietary data
Khazna Data Centers Data Centers
Data centers operated by Khazna Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 26 November 2026, DC Market Insights tracks 14 data centers operated by Khazna Data Centers in 5 countries, of which 4 are operational. Stated operational capacity is 31.8 MW, with a further 100 MW under construction and 825 MW planned. The pipeline is 29.1 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 6 of 14 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Khazna Data Centers data centers: key facts
About Khazna Data Centers
Khazna Data Centers is a UAE-based hyperscale wholesale data center developer and operator, majority-owned by G42 with MGX and Silver Lake as minority shareholders. Its website states 30 live data centers, 6 ongoing data center projects and 673 megawatts of capacity across the portfolio (November 2026). It is expanding into Saudi Arabia, Italy, Egypt and Turkiye, and plans to add more than 1 GW of capacity by 2030.
- Headquarters
- Abu Dhabi, United Arab Emirates
- Ownership
- Majority G42; minority MGX and Silver Lake (since March 2025, e& exited)
- Parent company
- G42
- Tracked footprint
- 14 facilities in 5 countries
- Website
- khaznadatacenters.com
Data center business
- Khazna plans to add more than 1 GW of operational capacity by 2030, of which more than 400 MW in international markets including Saudi Arabia and Italy. It is also delivering the infrastructure layer for Stargate UAE in the 5 GW UAE-U.S. AI Campus in Abu Dhabi.
- In September 2025 Khazna secured a USD 2.62 billion financing facility from Abu Dhabi Commercial Bank and First Abu Dhabi Bank, with a tenor of up to 10 years, to fund UAE and international growth. The release said Khazna holds a 73% market share in the UAE.
- AUH4 in Mafraq and AUH8 in Masdar City, Abu Dhabi, broke ground in April 2025 with a combined 60 MW of capacity, due for completion in December 2026 and August 2026 respectively.
- The website lists 30 live data centers across the UAE, 6 ongoing data center projects built to LEED standards, and 673 megawatts of capacity across the portfolio. A December 2025 release described the 30 live sites as a portfolio of almost 650 MW.
- Khazna was formed as a joint venture when Etisalat Group and G42 agreed to combine twelve data centers under the Khazna Data Centers name, with G42 holding 60% and Etisalat 40%. In March 2025 MGX and Silver Lake joined as minority shareholders alongside majority shareholder G42, and e& exited its investment while remaining a business partner.
- AUH6 in Masdar City, Abu Dhabi, provides 31.8 MW of IT power capacity for AI-related hosting. A ground-mounted 7 MWp solar PV plant developed with Emerge supplies electricity to the site.
- QAJ01 in Ajman is a 100 MW AI-optimized data center with 20 data halls of 5 MW each and liquid cooling. Uptime Institute awarded it Tier III Certification of Design Documents. Its initial phase was due for completion in December 2026.
- With Eni, Khazna signed Heads of Terms for a joint venture to develop an AI data center campus with 500 MW of total IT capacity in Ferrera Erbognone, Lombardy, powered by a new Eni combined cycle gas plant designed to capture CO2. It is the first step of a programme of up to 1 GW of IT capacity in Italy.
Recent updates
- Published its first ESG Report: in 2025, 27% of the electricity for its mechanical cooling load was covered by carbon-free electricity; targets are 50% by 2030 and 100% by 2035.
- Signed an MoU with Siemens at the UAE-Germany Business Forum in Munich to explore digital twins and 800 VDC power architectures for AI data centers.
- DXB8 in Dubai became the first data center to receive the SCS Global Services Zero Waste Certification, with 99.55% waste diversion over a 12-month audit.
- Uptime Institute awarded the 100 MW QAJ01 Ajman facility Tier III Certification of Design Documents.
- Became the first Middle East and Africa operator to achieve IDCA Grade 1 certification for its portfolio and service delivery.
- Launched Khazna NexOps, an in-house operations organization of more than 230 specialists supporting more than 30 data centers.
- Named Mohammed Bin Hassan Country Head for Saudi Arabia after acquiring 225,000 sqm of land in Dammam, where it will develop up to 200 MW of AI-ready capacity.
Company details checked against company and official sources, 26 Nov 2026.
- Capacity under construction or planned (925 MW) is 29.1 times the operational base of 31.8 MW.
- Its largest operational site is AUH6 in Abu Dhabi, United Arab Emirates at 31.8 MW.
- The largest project in the pipeline is Milan AI Data Center Campus (Ferrera Erbognone) by Khazna Data Centers (500 MW, planned).
- Italy accounts for 52% of tracked capacity (1 facilities).
- By type, the tracker lists 13 hyperscale and 1 colocation facilities.
- 6 of 14 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Khazna Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 100 MW under construction and 825 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Milan AI Data Center Campus (Ferrera Erbognone)Khazna Data Centers | Ferrera Erbognone, Italy | Planned | Hyperscale | 500 MW |
| Khazna DammamKhazna Data Centers | Dammam, Saudi Arabia | Planned | Hyperscale | 200 MW |
| QAJ01Khazna Data Centers | Ajman, United Arab Emirates | Under construction | Hyperscale | 100 MW |
| Khazna Ankara AI Data CenterKhazna Data Centers | Ankara, Türkiye | Planned | Hyperscale | 100 MW |
| Khazna Egypt Maadi Technology ParkKhazna Data Centers | Cairo, Egypt | Planned | Hyperscale | 25 MW |
Facilities
14 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Milan AI Data Center Campus (Ferrera Erbognone)Hyperscale
History
|
Ferrera Erbognone, Italy | Planned | 500 MW IT | — | Operator / official |
Khazna DammamHyperscale
History
|
Dammam, Saudi Arabia | Planned | 200 MW | — | Operator / official |
Khazna Ankara AI Data CenterHyperscale
History
|
Ankara, Türkiye | Planned | 100 MW | — | Operator / official |
QAJ01Hyperscale
History
|
Ajman, United Arab Emirates | Under construction | 100 MW IT | — | Operator / official |
AUH6Hyperscale
History
|
Abu Dhabi, United Arab Emirates | Operational | 31.8 MW IT | 2024 | Operator / official |
| Khazna Egypt Maadi Technology ParkHyperscale | Cairo, Egypt | Planned | 25 MW IT | — | Operator / official |
AUH4Hyperscale
History
|
Abu Dhabi, United Arab Emirates | Under construction | — | — | Operator / official |
| AUH8Hyperscale | Abu Dhabi, United Arab Emirates | Under construction | — | — | Operator / official |
| DXB2Hyperscale | Dubai, United Arab Emirates | Under construction | — | — | Operator / official |
| DXB3Hyperscale | Dubai, United Arab Emirates | Under construction | — | — | Operator / official |
| DXB8Hyperscale | Dubai, United Arab Emirates | Operational | — | — | Operator / official |
Khazna Kalba Data CenterColocation
History
|
Kalba, United Arab Emirates | Planned | — | — | Operator / official |
| Khazna Masdar City Data CenterHyperscale | Abu Dhabi, United Arab Emirates | Operational | — | — | Operator / official |
| Khazna Meydan Data CenterHyperscale | Dubai, United Arab Emirates | Operational | — | — | Operator / official |
Market position
How Khazna Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United Arab Emirates, Khazna Data Centers ranks #2 of 5 tracked operators by capacity, with 11% of the country’s tracked MW.
- United Arab Emirates has 18 tracked data centers from 5 operators: 148 MW operational and 1,100 MW under construction or planned.
- Industrial electricity in United Arab Emirates costs 120 USD/MWh (2026, latest official figure).
- In Egypt, Khazna Data Centers ranks #1 of 6 tracked operators by capacity, with 100% of the country’s tracked MW.
- In Italy, Khazna Data Centers ranks #1 of 11 tracked operators by capacity, with 35% of the country’s tracked MW.
- Abu Dhabi also hosts 3 other tracked data center(s), run by G42, Gulf Data Hub and Equinix.
Data center operators in United Arab Emirates
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| G42 | 1 | — | 1,000 MW |
| Moro Hub | 1 | 100 MW | — |
| Gulf Data Hub | 2 | 16 MW | — |
| Equinix | 4 | — | — |
All data centers in United Arab Emirates Power and policy in United Arab Emirates
Data center operators in Egypt
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Telecom Egypt | 2 | — | — |
| Commercial International Bank | 1 | — | — |
| Administrative Capital for Urban Development | 1 | — | — |
| Vodafone International Services | 1 | — | — |
| Arab African International Bank | 1 | — | — |
Data center operators in Italy
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Data4 | 2 | 170 MW | 100 MW |
| CloudHQ | 1 | — | 240 MW |
| NTT DATA | 1 | — | 128 MW |
| Vantage Data Centers | 2 | — | 96 MW |
| CyrusOne | 2 | — | 81 MW |
| Aruba | 4 | 75 MW | — |
| Compass Datacenters | 1 | — | 48 MW |
| Equinix | 4 | — | — |
All data centers in Italy Power and policy in Italy
Other data centers in Abu Dhabi
- Stargate UAE · G42 · Planned · 1,000 MW
- ICAD 1 · Gulf Data Hub · Operational · 16 MW
- Abu Dhabi AD1 · Equinix · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Khazna Data Centers operate?
DC Market Insights tracks 14 Khazna Data Centers data center(s) in 5 countries as of November 2026: 4 operational, 5 under construction and 5 planned.
Where is Khazna Data Centers headquartered?
Khazna Data Centers is headquartered in Abu Dhabi, United Arab Emirates. Ownership: Majority G42; minority MGX and Silver Lake (since March 2025, e& exited).
Which other companies operate data centers in United Arab Emirates?
Besides Khazna Data Centers, the largest operators we track in United Arab Emirates by capacity are G42, Moro Hub, Gulf Data Hub and Equinix. The United Arab Emirates page lists all 5 operators.
What rules apply to data centers in United Arab Emirates?
Our Power & Policy Tracker lists 5 government actions on data centers and power in United Arab Emirates, including 0 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Abu Dhabi?
Other tracked data centers in Abu Dhabi include Stargate UAE (G42), ICAD 1 (Gulf Data Hub) and Abu Dhabi AD1 (Equinix).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.