Proprietary data

Data Centers in Saudi Arabia

Every data center in Saudi Arabia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 8 data centers in Saudi Arabia run by 7 operators: 4 operational, 3 under construction and 1 planned. Stated operational capacity is 24 MW, with a further 384 MW under construction and 200 MW planned. Gulf Data Hub holds the largest share of tracked operational capacity (100%).

8Facilities tracked
7Operators
24 MWOperational (4 sites)
384 MWUnder construction (3 sites)
200 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 8 facilities have a stated capacity; the others are counted as sites only.

Gulf Data Hub KAUST · Gulf Data Hub · Thuwal (approximate location)Gulf Data Hub Dammam 1 · Gulf Data Hub · Dammam (approximate location)Khazna Dammam · Khazna Data Centers · Dammam (approximate location)Ezditek RUH01 · Ezditek · Riyadh (approximate location)HUMAIN Riyadh Supercluster · HUMAIN · Riyadh (approximate location)Mobily Dammam Data Centre · Mobily · Dammam (approximate location)center3 Khurais Riyadh · center3 · Riyadh (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Saudi Arabia data center market: key facts

  • Capacity under construction or planned (584 MW) is 24.3 times the operational base of 24 MW.
  • The three largest operators by operational capacity, Gulf Data Hub, DataVolt and Khazna Data Centers, hold 100% of tracked operational MW.
  • DataVolt has the largest development pipeline in Saudi Arabia: 360 MW under construction or planned.
  • The largest operational facility we track is Gulf Data Hub Dammam 1 (Gulf Data Hub, Dammam) at 16 MW.
  • The largest project in the pipeline is DataVolt Oxagon AI Campus Phase 1 (360 MW, under construction).
  • NEOM is the largest cluster: 1 of 8 facilities and 59% of tracked capacity.
  • By type, the tracker lists 5 colocation and 3 hyperscale facilities.
  • 5 of 8 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational24 MW
Under construction384 MW
Planned200 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Saudi Arabia by tracked capacity, MW
DataVolt360 MW
Ezditek24 MW

OperationalUnder construction or planned

Capacity by market in Saudi Arabia, MW
NEOM360 MW
Dammam216 MW
Riyadh24 MW
Jeddah8 MW

OperationalUnder construction or planned

Facilities by type
Colocation5
Hyperscale3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Saudi Arabia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Gulf Data Hub224 MW—100%
DataVolt1—360 MW—
Mobily1———
HUMAIN1———
Ezditek1—24 MW—
center31———
Khazna Data Centers1—200 MW—

Largest data center projects in Saudi Arabia

Under construction and planned facilities with a stated capacity, largest first. 384 MW under construction and 200 MW planned in total.

ProjectLocationStatusTypeCapacity
DataVolt Oxagon AI Campus Phase 1DataVolt Oxagon Under construction Hyperscale 360 MW
Khazna DammamKhazna Data Centers Dammam Planned Hyperscale 200 MW
Ezditek RUH01Ezditek Riyadh Under construction Colocation 24 MW

How Saudi Arabia compares in Middle East & Africa

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Arab Emirates185148 MW1,100 MW
Saudi Arabia8724 MW584 MW
South Africa287202 MW180 MW
Israel13333 MW52.5 MW
Kenya10612 MW53 MW
Oman43—45 MW
Nigeria12637.5 MW—
Egypt76—25 MW
Bahrain112.7 MW—
DR Congo222 MW—
Morocco1813——
Jordan109——

Data center deals in Saudi Arabia

Our Deal Tracker lists 12 deals in Saudi Arabia since January 2026, with $5.92B in disclosed value.

  • Saudi Aramco → HUMAIN (49%) M&A $2.64B
  • Zain KSA; DataVolt → Data centre facilities across Saudi Arabia JV / partnership
  • HUMAIN; DataVolt → 100MW of a 360MW AI-ready data centre at Oxagon JV / partnership · 100 MW
  • Axelerated Solutions (AXS); BIM Capital → Fund to develop, own and operate two Tier III AI-ready data centres (10MW each, expandable to 20MW) Financing · 20 MW
  • HUMAIN → HUMAIN AI data center project, Riyadh Power deal
  • NHC Innovation → Data centres at Khuzam Digital Valley Land / campus $880.0M · 65 MW

All Saudi Arabia deals in the Deal Tracker

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DataVolt Oxagon AI Campus Phase 1DataVolt
History
  1. Announced
  2. Under construction
Oxagon Under construction 360 MW — Operator / official
Khazna DammamKhazna Data Centers
History
  1. Announced
  2. Planned
Dammam Planned 200 MW — Operator / official
Ezditek RUH01Ezditek Riyadh Under construction 24 MW — Operator / official
Gulf Data Hub Dammam 1Gulf Data Hub Dammam Operational 16 MW IT — Operator / official
Gulf Data Hub KAUSTGulf Data Hub Thuwal Operational 8 MW — Operator / official
center3 Khurais Riyadhcenter3 Riyadh Operational — — Trade press
HUMAIN Riyadh SuperclusterHUMAIN Riyadh Under construction — — Operator / official
Mobily Dammam Data CentreMobily Dammam Operational — — Operator / official

Get the data

Every data center in Saudi Arabia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,386 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Saudi Arabia

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Saudi Arabia

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Saudi Arabia?

DC Market Insights tracks 8 data centers in Saudi Arabia as of November 2026: 4 operational, 3 under construction and 1 planned, run by 7 operators. The count grows as we verify more sites.

What is the data center capacity of Saudi Arabia?

Tracked operational capacity in Saudi Arabia is 24 MW, with 384 MW under construction and 200 MW planned. These totals use the capacity each source states (IT load where given) and cover 5 of 8 tracked facilities.

Which companies operate the most data center capacity in Saudi Arabia?

By tracked operational capacity, the largest operators in Saudi Arabia are Gulf Data Hub (24 MW).

Where are the data centers in Saudi Arabia located?

The largest clusters by tracked capacity are NEOM (1 facilities), Dammam (3 facilities) and Riyadh (3 facilities). The map above shows every site.

Which new data centers are being built in Saudi Arabia?

We track 384 MW under construction and 200 MW planned. The largest projects are DataVolt Oxagon AI Campus Phase 1 (360 MW), Khazna Dammam (200 MW) and Ezditek RUH01 (24 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Saudi Arabia have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Saudi Arabia capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy