iXAfrica Data Centers

Data centers operated by iXAfrica that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 2 data centers operated by iXAfrica in 1 country, of which 1 are operational. Stated operational capacity is 4.5 MW, with a further — under construction and 53 MW planned. The pipeline is 11.8 times the capacity already operating.

2Facilities tracked
1Countries
4.5 MWOperational (1 site)
—Under construction (0 sites)
53 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 2 facilities have a stated capacity; the others are counted as sites only.

iXAfrica NBOX1.1 · iXAfrica · Nairobi (approximate location)iXAfrica NBOX2 Tilisi · iXAfrica · Nairobi (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

iXAfrica data centers: key facts

  • Capacity under construction or planned (53 MW) is 11.8 times the operational base of 4.5 MW.
  • Its largest operational site is iXAfrica NBOX1.1 in Nairobi, Kenya at 4.5 MW.
  • The largest project in the pipeline is iXAfrica NBOX2 Tilisi (53 MW, planned).
Capacity by status, MW
Operational4.5 MW
Planned53 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

iXAfrica development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 53 MW planned in total.

ProjectLocationStatusTypeCapacity
iXAfrica NBOX2 TilisiiXAfrica Nairobi, Kenya Planned Hyperscale 53 MW

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
iXAfrica NBOX2 TilisiHyperscale Nairobi, Kenya Planned 53 MW IT — Operator / official
iXAfrica NBOX1.1Hyperscale Nairobi, Kenya Operational 4.5 MW IT — Operator / official

Market position

How iXAfrica compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Kenya, iXAfrica ranks #1 of 6 tracked operators by capacity, with 88% of the country’s tracked MW.
  • Kenya has 10 tracked data centers from 6 operators: 12 MW operational and 53 MW under construction or planned.
  • Nairobi also hosts 5 other tracked data center(s), run by Africa Data Centres, Digital Realty, PAIX Data Centres and Safaricom.

Data center operators in Kenya

Tracked facilities106 operators
Operational capacity12 MW53 MW in the pipeline
iXAfrica rank by capacity#1of 6 operators · 88%
OperatorFacilitiesOperational MWPipeline MW
Africa Data Centres17.5 MW—
Digital Realty4——
Konza Technopolis Development Authority1——
PAIX Data Centres1——
Safaricom1——

All data centers in Kenya

Other data centers in Nairobi

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does iXAfrica operate?

DC Market Insights tracks 2 iXAfrica data center(s) in 1 country as of November 2026: 1 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Kenya?

Besides iXAfrica, the largest operators we track in Kenya by capacity are Africa Data Centres, Digital Realty, Konza Technopolis Development Authority, PAIX Data Centres and Safaricom. The Kenya page lists all 6 operators.

Which other data centers are in Nairobi?

Other tracked data centers in Nairobi include Africa Data Centres NBO1 Nairobi (Africa Data Centres), Digital Realty NBO1 (Digital Realty), Digital Realty NBO2 (Digital Realty) and PAIX NBO-1 (PAIX Data Centres).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst