As of 25 November 2026, DC Market Insights tracks 10 data centers in Kenya run by 6 operators: 9 operational, 0 under construction and 1 planned. Stated operational capacity is 12 MW, with a further — under construction and 53 MW planned. Africa Data Centres holds the largest share of tracked operational capacity (63%).

10Facilities tracked
6Operators
12 MWOperational (9 sites)
—Under construction (0 sites)
53 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 10 facilities have a stated capacity; the others are counted as sites only.

Africa Data Centres NBO1 Nairobi · Africa Data Centres · Nairobi (approximate location)Digital Realty NBO1 · Digital Realty · Nairobi (approximate location)Digital Realty NBO2 · Digital Realty · Nairobi (approximate location)Digital Realty MBA1 · Digital Realty · Mombasa (approximate location)Digital Realty MBA2 · Digital Realty · Mombasa (approximate location)iXAfrica NBOX1.1 · iXAfrica · Nairobi (approximate location)iXAfrica NBOX2 Tilisi · iXAfrica · Nairobi (approximate location)PAIX NBO-1 · PAIX Data Centres · Nairobi (approximate location)Safaricom Red Hill Data Center (Phases 1 and 2) · Safaricom · Nairobi (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Kenya data center market: key facts

  • Capacity under construction or planned (53 MW) is 4.4 times the operational base of 12 MW.
  • The three largest operators by operational capacity, Africa Data Centres, iXAfrica and Digital Realty, hold 100% of tracked operational MW.
  • iXAfrica has the largest development pipeline in Kenya: 53 MW under construction or planned.
  • The largest operational facility we track is Africa Data Centres NBO1 Nairobi (Africa Data Centres, Nairobi) at 7.5 MW.
  • The largest project in the pipeline is iXAfrica NBOX2 Tilisi (53 MW, planned).
  • Nairobi is the largest cluster: 8 of 10 facilities and 100% of tracked capacity.
  • By type, the tracker lists 6 colocation, 2 hyperscale and 1 enterprise facilities.
  • 3 of 10 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational12 MW
Planned53 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Kenya by tracked capacity, MW
iXAfrica57.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation6
Hyperscale2
Enterprise1
Other1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Kenya

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Digital Realty4———
iXAfrica24.5 MW53 MW38%
Africa Data Centres17.5 MW—63%
Safaricom1———
Konza Technopolis Development Authority1———
PAIX Data Centres1———

Largest data center projects in Kenya

Under construction and planned facilities with a stated capacity, largest first. — under construction and 53 MW planned in total.

ProjectLocationStatusTypeCapacity
iXAfrica NBOX2 TilisiiXAfrica Nairobi Planned Hyperscale 53 MW

How Kenya compares in Middle East & Africa

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Arab Emirates185148 MW1,100 MW
Saudi Arabia8724 MW584 MW
South Africa287202 MW180 MW
Israel13333 MW52.5 MW
Kenya10612 MW53 MW
Oman43—45 MW
Nigeria12637.5 MW—
Egypt76—25 MW
Bahrain112.7 MW—
DR Congo222 MW—
Morocco1813——
Jordan109——

Data center deals in Kenya

Our Deal Tracker lists 1 deals in Kenya since January 2026.

All Kenya deals in the Deal Tracker

Facilities

10 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
iXAfrica NBOX2 TilisiiXAfrica Nairobi Planned 53 MW IT — Operator / official
Africa Data Centres NBO1 NairobiAfrica Data Centres Nairobi Operational 7.5 MW — Operator / official
iXAfrica NBOX1.1iXAfrica Nairobi Operational 4.5 MW IT — Operator / official
Digital Realty MBA1Digital Realty Mombasa Operational — — Operator / official
Digital Realty MBA2Digital Realty Mombasa Operational — — Operator / official
Digital Realty NBO1Digital Realty Nairobi Operational — — Operator / official
Digital Realty NBO2Digital Realty Nairobi Operational — — Operator / official
Konza National Data Center (Phase 1)Konza Technopolis Development Authority Konza Technopolis Operational — — Operator / official
PAIX NBO-1PAIX Data Centres Nairobi Operational — — Operator / official
Safaricom Red Hill Data Center (Phases 1 and 2)Safaricom Nairobi Operational — — Operator / official

Get the data

Every data center in Kenya, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,250 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Kenya

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Kenya

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Kenya?

DC Market Insights tracks 10 data centers in Kenya as of November 2026: 9 operational, 0 under construction and 1 planned, run by 6 operators. The count grows as we verify more sites.

What is the data center capacity of Kenya?

Tracked operational capacity in Kenya is 12 MW, with — under construction and 53 MW planned. These totals use the capacity each source states (IT load where given) and cover 3 of 10 tracked facilities.

Which companies operate the most data center capacity in Kenya?

By tracked operational capacity, the largest operators in Kenya are Africa Data Centres (7.5 MW) and iXAfrica (4.5 MW).

Where are the data centers in Kenya located?

The largest clusters by tracked capacity are Nairobi (8 facilities) and Mombasa (2 facilities). The map above shows every site.

Which new data centers are being built in Kenya?

We track — under construction and 53 MW planned. The largest projects are iXAfrica NBOX2 Tilisi (53 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy