Proprietary data

Africa Data Centres Data Centers

Data centers operated by Africa Data Centres that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 4 data centers operated by Africa Data Centres in 2 countries, of which 4 are operational. Stated operational capacity is 48 MW.

4Facilities tracked
2Countries
48 MWOperational (4 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 3 of 4 facilities have a stated capacity; the others are counted as sites only.

Africa Data Centres JHB1 Midrand · Africa Data Centres · Midrand (approximate location)Africa Data Centres JHB2 Samrand · Africa Data Centres · Centurion (approximate location)Africa Data Centres CPT1 Cape Town · Africa Data Centres · Cape Town (approximate location)Africa Data Centres NBO1 Nairobi · Africa Data Centres · Nairobi (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Africa Data Centres data centers: key facts

  • Its largest operational site is Africa Data Centres JHB2 Samrand in Centurion, South Africa at 35 MW.
  • South Africa accounts for 84% of tracked capacity (3 facilities).
  • 3 of 4 facilities have a capacity stated by their source; the totals above count only those.
Capacity by country, MW
Kenya7.5 MW

OperationalUnder construction or planned

Facilities

4 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Africa Data Centres JHB2 SamrandColocation Centurion, South Africa Operational 35 MW IT — Operator / official
Africa Data Centres NBO1 NairobiColocation Nairobi, Kenya Operational 7.5 MW — Operator / official
Africa Data Centres CPT1 Cape TownColocation Cape Town, South Africa Operational 5.5 MW — Operator / official
Africa Data Centres JHB1 MidrandColocation Midrand, South Africa Operational — — Operator / official

Market position

How Africa Data Centres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In South Africa, Africa Data Centres ranks #4 of 7 tracked operators by capacity, with 11% of the country’s tracked MW.
  • South Africa has 28 tracked data centers from 7 operators: 202 MW operational and 180 MW under construction or planned.
  • In Kenya, Africa Data Centres ranks #2 of 6 tracked operators by capacity, with 12% of the country’s tracked MW.
  • Centurion also hosts 1 other tracked data center(s), run by MTN.
  • Our Deal Tracker lists 1 deal(s) naming Africa Data Centres, the latest on 7 September 2026.

Data center operators in South Africa

Tracked facilities287 operators
Operational capacity202 MW180 MW in the pipeline
Africa Data Centres rank by capacity#4of 7 operators · 11%
OperatorFacilitiesOperational MWPipeline MW
Teraco9119 MW40 MW
Vantage Data Centers2—140 MW
Open Access Data Centres1142 MW—
MTN1——
Equinix1——
Vodacom1——

All data centers in South Africa

Data center operators in Kenya

Tracked facilities106 operators
Operational capacity12 MW53 MW in the pipeline
Africa Data Centres rank by capacity#2of 6 operators · 12%
OperatorFacilitiesOperational MWPipeline MW
iXAfrica24.5 MW53 MW
Digital Realty4——
Safaricom1——
Konza Technopolis Development Authority1——
PAIX Data Centres1——

All data centers in Kenya

Other data centers in Centurion

  • MTN SA Centurion Data Centre (Ground Floor Phase 1) · MTN · Operational

Deals naming Africa Data Centres

  • Vodafone Business; Cassava Technologies; Elsewedy Electric → Africa Data Centres Egypt (ADC Egypt) JV / partnership $1.00B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Africa Data Centres operate?

DC Market Insights tracks 4 Africa Data Centres data center(s) in 2 countries as of November 2026: 4 operational, 0 under construction and 0 planned.

Which other companies operate data centers in South Africa?

Besides Africa Data Centres, the largest operators we track in South Africa by capacity are Teraco, Vantage Data Centers, Open Access Data Centres, MTN and Equinix. The South Africa page lists all 7 operators.

Which other data centers are in Centurion?

Other tracked data centers in Centurion include MTN SA Centurion Data Centre (Ground Floor Phase 1) (MTN).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst