YEXIO (HOCHTIEF) Data Centers
Data centers operated by YEXIO (HOCHTIEF) that we have verified: location, status and capacity, each checked against its source.
In short
As of 21 November 2026, DC Market Insights tracks 4 data centers operated by YEXIO (HOCHTIEF) in 1 country, of which 2 are operational. Stated operational capacity is 2 MW, with a further 4 MW under construction and — planned. The pipeline is 2.0 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 3 of 4 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
YEXIO (HOCHTIEF) data centers: key facts
About YEXIO (HOCHTIEF)
YEXIO is the edge data center brand of HOCHTIEF Data Center Partner GmbH (Essen), a spin-off of HOCHTIEF PPP Solutions. Two YEXIO sites in Germany are in operation (Heiligenhaus since September 2025, Bad Lippspringe since November 2026, about 2 MW each) and further sites in North Rhine-Westphalia and Bavaria are under construction, including Dorfen and Herne at 2 MW IT each, expandable to 4 MW. Together with Palladio Partners, HOCHTIEF plans 25 edge data centers in Europe, 15 of them in Germany (company release, November 2026).
- Headquarters
- Essen, Germany
- Ownership
- Sites held by project companies financed by Palladio Partners and HOCHTIEF PPP Solutions
- Parent company
- HOCHTIEF PPP Solutions GmbH (HOCHTIEF AG)
- Tracked footprint
- 4 facilities in 1 country
- Website
- hochtief-datacenterpartner.de
Data center business
- The standard YEXIO building is built with 2 MW of IT power and can be doubled to 4 MW on the same plot if demand rises (stated for Bad Lippspringe, Dorfen and Herne).
- Palladio Partners is the first strategic investor, for 15 data centers in the DACH region. The consortium plans to invest a triple-digit million euro sum in the YEXIO network; Palladio supports Dorfen and 24 more planned data centers in Europe, 15 of them in Germany.
- The YEXIO design uses mass-timber construction instead of reinforced concrete (about 600 tonnes less CO2 per building), direct water cooling with a closed loop, green facades and 100% renewable electricity. Waste heat is fed into local heat networks: in Heiligenhaus it heats the municipal swimming pool, and in Dorfen and Bad Lippspringe it is planned for the municipal district heating network.
- The main user of the YEXIO sites is Yorizon, a cloud joint venture of HOCHTIEF and server maker Thomas-Krenn.AG launched in September 2024, which offers IaaS and PaaS green-IT cloud services to software firms, medium and large companies and the public sector. HOCHTIEF operates the YEXIO sites together with Thomas-Krenn.AG.
- Each site is built by HOCHTIEF Data Center Partner GmbH for a project company (for example YEXIO Bad Lippspringe GmbH & Co. KG and YEXIO Dorfen GmbH & Co. KG) in which Palladio Partners and HOCHTIEF PPP Solutions invest. HOCHTIEF is responsible for planning, construction, operation and asset management.
- HOCHTIEF Data Center Partner GmbH is registered in Essen (Amtsgericht Essen HRB 34074) and describes itself as a spin-off of HOCHTIEF PPP Solutions that combines construction, life-cycle management and digital infrastructure. Its data centers are marketed under the YEXIO brand as edge data centers for public, private and hybrid cloud, located close to users outside the large internet hubs.
- HOCHTIEF says further YEXIO data centers are being built at locations in Germany, Austria, Switzerland and the United Kingdom.
Recent updates
- 6 Nov 2026: The second YEXIO data center, in Bad Lippspringe (district of Paderborn), entered operation with an initial 2 MW, opened by North Rhine-Westphalia minister-president Hendrik Wüst. Further sites in NRW and Bavaria are under construction, 25 edge data centers are planned in Europe, and about two thirds of existing YEXIO capacity is already sold.
- 20 May 2026: Groundbreaking for the YEXIO data center in the FunkenbergQuartier in Herne, the fourth site, with 2 MW of IT capacity (expandable to 4 MW); completion is planned for autumn 2027.
- 27 Feb 2026: Groundbreaking in Dorfen (district of Erding, Bavaria) on a 7,500 m2 plot in the Südwest business park; 2 MW IT initially, up to 4 MW, start of operation planned for Q3 2027, waste heat for the Stadtwerke Dorfen district heating network.
- 11 Sep 2025: The first YEXIO data center entered operation on a site of about 9,000 m2 in the Heiligenhaus Innovation Park; five locations including Heiligenhaus were under way or secured at that time. YEXIO Heiligenhaus holds the Blauer Engel eco-label for data centers.
- 25 Jun 2025: HOCHTIEF founded HOCHTIEF Data Center Partner Limited, led by Warren Taylor, to bring the YEXIO model to the UK and Ireland; the same day HOCHTIEF and Palladio Partners signed the land purchase for the Dorfen site.
Company details checked against company and official sources, 21 Nov 2026.
- Capacity under construction or planned (4 MW) is 2.0 times the operational base of 2 MW.
- Its largest operational site is YEXIO Rechenzentrum Bad Lippspringe in Bad Lippspringe, Germany at 2 MW.
- The largest project in the pipeline is YEXIO Data Center FunkenbergQuartier (2 MW, under construction).
- 3 of 4 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
YEXIO (HOCHTIEF) development pipeline
Under construction and planned facilities with a stated capacity, largest first. 4 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity | Year |
|---|---|---|---|---|---|
| YEXIO Data Center FunkenbergQuartierYEXIO (HOCHTIEF) | Herne, Germany | Under construction | Edge | 2 MW | 2027 |
| YEXIO Rechenzentrum DorfenYEXIO (HOCHTIEF) | Dorfen, Germany | Under construction | Edge | 2 MW | 2027 |
Facilities
4 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
YEXIO Data Center FunkenbergQuartierEdge
History
|
Herne, Germany | Under construction | 2 MW IT | 2027 | Operator / official |
YEXIO Rechenzentrum Bad LippspringeEdge
History
|
Bad Lippspringe, Germany | Operational | 2 MW IT | 2026 | Operator / official |
YEXIO Rechenzentrum DorfenEdge
History
|
Dorfen, Germany | Under construction | 2 MW IT | 2027 | Operator / official |
YEXIO Rechenzentrum HeiligenhausEdge
History
|
Heiligenhaus, Germany | Operational | — | 2025 | Operator / official |
Market position
How YEXIO (HOCHTIEF) compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Germany, YEXIO (HOCHTIEF) ranks #33 of 56 tracked operators by capacity, with 0.1% of the country’s tracked MW.
- Germany has 188 tracked data centers from 56 operators: 933 MW operational and 4,386 MW under construction or planned.
- Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does YEXIO (HOCHTIEF) operate?
DC Market Insights tracks 4 YEXIO (HOCHTIEF) data center(s) in 1 country as of November 2026: 2 operational, 2 under construction and 0 planned.
Where is YEXIO (HOCHTIEF) headquartered?
YEXIO (HOCHTIEF) is headquartered in Essen, Germany. Ownership: Sites held by project companies financed by Palladio Partners and HOCHTIEF PPP Solutions.
Which other companies operate data centers in Germany?
Besides YEXIO (HOCHTIEF), the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 56 operators.
What rules apply to data centers in Germany?
Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.