In short

As of 9 November 2026, DC Market Insights tracks 26 data centers operated by CloudHQ in 11 countries, of which 3 are operational. Stated operational capacity is 112 MW, with a further 252 MW under construction and 3,967 MW planned. The pipeline is 37.7 times the capacity already operating.

26Facilities tracked
11Countries
112 MWOperational (3 sites)
252 MWUnder construction (3 sites)
3,967 MWPlanned (20 sites)

MW = IT capacity where the source states it, otherwise total capacity. 20 of 26 facilities have a stated capacity; the others are counted as sites only.

CloudHQ LC1A (LC Campus) · CloudHQ · Ashburn (approximate location)CloudHQ LC2 (LC Campus) · CloudHQ · Ashburn (approximate location)CloudHQ Querétaro campus · CloudHQ · Querétaro (approximate location)BKK Campus · CloudHQ · Bangkok (exact location)FRA Campus Offenbach · CloudHQ · Offenbach am Main (exact location)CloudHQ Frankfurt-Höchst campus · CloudHQ · Frankfurt am Main (exact location)CloudHQ LC3 (LC Campus) · CloudHQ · Ashburn (exact location)CloudHQ LC4 (LC Campus) · CloudHQ · Ashburn (exact location)CloudHQ MCC5 (MCC Campus) · CloudHQ · Manassas (exact location)CloudHQ MCC7 (MCC Campus) · CloudHQ · Manassas (exact location)CloudHQ MDC Campus · CloudHQ · Manassas (exact location)CloudHQ MSP Campus · CloudHQ · Chaska (exact location)GRU Campus · CloudHQ · Paulínia (exact location)GIG Campus · CloudHQ · São João de Meriti (exact location)CloudHQ ORD Campus · CloudHQ · Mount Prospect (exact location)CloudHQ SAT Campus · CloudHQ · San Antonio (exact location)KIX Campus (Cosmosquare) · CloudHQ · Osaka (exact location)SJC Campus (SJC1) · CloudHQ · Santa Clara (exact location)CLP Campus · CloudHQ · Culpeper (exact location)LHR Campus · CloudHQ · Didcot (exact location)AMS Campus · CloudHQ · Haarlemmermeer (exact location)MXP Campus · CloudHQ · Milan (exact location)FRA7 Campus Offenbach · CloudHQ · Offenbach am Main (exact location)CDG Campus · CloudHQ · Lisses (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

CloudHQ data centers: key facts

About CloudHQ

CloudHQ is a Washington, D.C.-based developer and operator of hyperscale data center campuses that it builds and leases to large cloud and technology companies. Its website states 23 global campuses, 5.2+ GW of global data center inventory, 9.2 million+ SF of data center space delivered and 1,380+ MW of critical IT load contracted (October 2026), with campuses in the United States, Europe, Latin America and Asia.

Headquarters
Washington, D.C., United States
Founded
2016
Ownership
Private; part of the Fateh Family Office (FFO), founded by Hossein Fateh
Parent company
Fateh Family Office (FFO)
Tracked footprint
26 facilities in 11 countries
Website
cloudhq.com

Data center business

  • CloudHQ was founded in 2016 by Hossein Fateh. It is part of the Fateh Family Office (FFO) and is affiliated with CloudCapital, WindHQ and Dalian Development. Its global headquarters is at 1212 New York Avenue, Washington, D.C., with EMEA headquarters in London and APAC headquarters in Singapore.
  • CloudHQ states 23 global campuses, 5.2+ GW of global data center inventory, 9.2 million+ SF of data center space delivered and 1,380+ MW of critical IT load contracted, with expansion potential of 6,000+ MW for its current portfolio.
  • Northern Virginia is its home market. The LC campus in Ashburn, off Loudoun County Parkway, lists 1,256 MW of total critical IT load across fourteen planned data centers, with LC3 and LC4 under construction. In Manassas, the MCC campus provides over 375 MW across seven data centers and the MDC campus up to 300 MW from two on-site substations, linked by CloudHQ's Manassas Fiber Highway. A 215 MW campus is planned in Culpeper.
  • Other US campuses: SAT in San Antonio, Texas, up to 600 MW in five planned data centers on the former University of Texas Health Science Center site; ORD in Mount Prospect, Illinois, on the former United Airlines headquarters, 252 MW; MSP in Chaska, Minnesota, up to 200 MW; and SJC1 in Santa Clara, California, 42 MW.
  • Europe: FRA Campus Offenbach (two 56 MW buildings, 112 MW, entered service 2023), the FRA Höchst campus with a 300 MW on-site utility connection, FRA7 Offenbach (90 MW, planned), LHR in Didcot (101 MW, expandable to 300 MW), AMS in Schiphol-Rijk (84 MW), CDG in Lisses south of Paris (two 74.4 MW buildings) and MXP west of Milan (four 48 MW buildings, 240 MW secured from the grid operator).
  • Latin America: GRU in Paulínia, Campinas region (288 MW in two phases of three 48 MW data centers; the first data center project authorized to connect to Brazil's National Grid), GIG in São João de Meriti near Rio de Janeiro (36 MW) and QRO in Querétaro, Mexico, designed for six 48 MW buildings fed by a 400 kV onsite substation.
  • Asia: KIX at Cosmosquare, Nanko Kita, Osaka City, a 96 MW campus in three phases (KIX1-KIX3), and BKK, a 108 MW critical IT load site outside Bangkok powered by an on-site substation.

Recent updates

  • A motion filed in the Lower Austria state parliament says CloudHQ's data center in Leopoldsdorf (Bruck an der Leitha district) will be built from 2027, reaching about 200 MW of electrical connection in three buildings at full build-out, with 70 MW in the first stage. Landtag von Niederösterreich – Antrag Ltg.-1059/XX-2026
  • CloudHQ published its FRA7 Offenbach data center: a 90 MW three-story building less than 1,500 m from FRA1-2, planned to begin development in 2027 and enter service in 2029, built to LEED Gold, with about 1,950 SM of solar panels and 50 MW of waste heat for EVO.
  • CloudHQ added its BKK campus in Thailand: a planned 108 MW critical IT load data center outside Bangkok, next to other hyperscale campuses and powered by an on-site substation.
  • CloudHQ updated its CLP campus in Culpeper, Virginia: 215 MW of total IT load with ready-for-service in 2027, in three data centers powered by an onsite substation near an Equinix Business Exchange.
  • CloudHQ updated its QRO campus in Querétaro, near QRO airport: planned as the biggest data center campus in Mexico, with six buildings of 48 MW IT load powered via 400 kV transmission and ready-for-service within 2027.

Company details checked against company and official sources, 20 Oct 2026.

  • Capacity under construction or planned (4,219 MW) is 37.7 times the operational base of 112 MW.
  • Its largest operational site is FRA Campus Offenbach in Offenbach am Main, Germany at 112 MW.
  • The largest project in the pipeline is CloudHQ Querétaro campus (900 MW, planned).
  • United States accounts for 37% of tracked capacity (12 facilities).
  • 20 of 26 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational112 MW
Under construction252 MW
Planned3,967 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Mexico900 MW
Germany519 MW
Brazil324 MW
Italy240 MW
Austria200 MW
France150 MW
Thailand108 MW
Japan96.4 MW

OperationalUnder construction or planned

CloudHQ development pipeline

Under construction and planned facilities with a stated capacity, largest first. 252 MW under construction and 3,967 MW planned in total.

ProjectLocationStatusTypeCapacity
CloudHQ Querétaro campusCloudHQ Querétaro, Mexico Planned Hyperscale 900 MW
CloudHQ SAT CampusCloudHQ San Antonio, United States Planned Hyperscale 600 MW
CloudHQ MDC CampusCloudHQ Manassas, United States Planned Hyperscale 300 MW
GRU CampusCloudHQ Paulínia, Brazil Planned Hyperscale 288 MW
CloudHQ ORD CampusCloudHQ Mount Prospect, United States Under construction Hyperscale 252 MW
MXP CampusCloudHQ Milan, Italy Planned Hyperscale 240 MW
CloudHQ Frankfurt-Höchst campusCloudHQ Frankfurt am Main, Germany Planned Hyperscale 224 MW
CLP CampusCloudHQ Culpeper, United States Planned Hyperscale 215 MW
CloudHQ Leopoldsdorf campusCloudHQ Leopoldsdorf, Austria Planned Hyperscale 200 MW
CloudHQ MSP CampusCloudHQ Chaska, United States Planned Hyperscale 200 MW
CDG CampusCloudHQ Lisses, France Planned Hyperscale 150 MW
BKK CampusCloudHQ Bangkok, Thailand Planned Hyperscale 108 MW

Facilities

26 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
CloudHQ Querétaro campusHyperscale Querétaro, Mexico Planned 900 MW IT — Trade press
CloudHQ SAT CampusHyperscale San Antonio, United States Planned 600 MW IT — Operator / official
CloudHQ MDC CampusHyperscale Manassas, United States Planned 300 MW IT — Operator / official
GRU CampusHyperscale Paulínia, Brazil Planned 288 MW IT — Operator / official
CloudHQ ORD CampusHyperscale Mount Prospect, United States Under construction 252 MW IT — Operator / official
MXP CampusHyperscale Milan, Italy Planned 240 MW IT — Operator / official
CloudHQ Frankfurt-Höchst campusHyperscale Frankfurt am Main, Germany Planned 224 MW IT — Operator / official
CLP CampusHyperscale Culpeper, United States Planned 215 MW IT — Operator / official
CloudHQ Leopoldsdorf campusHyperscale Cooling: Chilled water, dry coolers Leopoldsdorf, Austria Planned 200 MW total — Operator / official
CloudHQ MSP CampusHyperscale Chaska, United States Planned 200 MW IT — Operator / official
CDG CampusHyperscale Lisses, France Planned 150 MW IT — Operator / official
FRA Campus OffenbachHyperscale Offenbach am Main, Germany Operational 112 MW IT 2023 Operator / official
BKK CampusHyperscale Bangkok, Thailand Planned 108 MW IT — Operator / official
LHR CampusHyperscale Didcot, United Kingdom Planned 101 MW IT — Operator / official
KIX Campus (Cosmosquare)Hyperscale Osaka, Japan Planned 96.4 MW IT — Operator / official
CloudHQ Offenbach KettelerstrasseHyperscale Offenbach am Main, Germany Planned 93 MW — Trade press
FRA7 Campus OffenbachHyperscale Offenbach am Main, Germany Planned 90 MW IT — Operator / official
AMS CampusHyperscale Haarlemmermeer, Netherlands Planned 84 MW IT — Operator / official
SJC Campus (SJC1)Hyperscale Santa Clara, United States Planned 42 MW IT — Operator / official
GIG CampusHyperscale São João de Meriti, Brazil Planned 36 MW IT — Operator / official
CloudHQ LC1A (LC Campus)Hyperscale Ashburn, United States Operational — — Trade press
CloudHQ LC2 (LC Campus)Hyperscale Ashburn, United States Operational — — Trade press
CloudHQ LC3 (LC Campus)Hyperscale Ashburn, United States Under construction — — Operator / official
CloudHQ LC4 (LC Campus)Hyperscale Ashburn, United States Under construction — — Operator / official
CloudHQ MCC5 (MCC Campus)Hyperscale Manassas, United States Planned — — Operator / official
CloudHQ MCC7 (MCC Campus)Hyperscale Manassas, United States Planned — — Operator / official

Market position

How CloudHQ compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, CloudHQ ranks #13 of 171 tracked operators by capacity, with 2.1% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Germany, CloudHQ ranks #2 of 56 tracked operators by capacity, with 9.8% of the country’s tracked MW.
  • In Brazil, CloudHQ ranks #3 of 56 tracked operators by capacity, with 10% of the country’s tracked MW.
  • Ashburn also hosts 10 other tracked data center(s), run by Vantage Data Centers, PowerHouse Data Centers, Cologix and QTS.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
CloudHQ rank by capacity#13of 171 operators · 2.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
CloudHQ rank by capacity#2of 56 operators · 9.8%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW
Virtus Data Centres2—262 MW

All data centers in Germany Power and policy in Germany

Data center operators in Brazil

Tracked facilities16456 operators
Operational capacity493 MW2,645 MW in the pipeline
CloudHQ rank by capacity#3of 56 operators · 10%
Renewable share of generation86.8%2025
OperatorFacilitiesOperational MWPipeline MW
Elea Data Centers12—1,508 MW
Ascenty31259 MW216 MW
Scala Data Centers25113 MW181 MW
V.tal620 MW200 MW
Omnia1—200 MW
ODATA572 MW—
Cirion Technologies427 MW—
HostDime21.5 MW15 MW

All data centers in Brazil Power and policy in Brazil

Other data centers in Ashburn

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does CloudHQ operate?

DC Market Insights tracks 26 CloudHQ data center(s) in 11 countries as of November 2026: 3 operational, 3 under construction and 20 planned.

Where is CloudHQ headquartered?

CloudHQ is headquartered in Washington, D.C., United States. Ownership: Private; part of the Fateh Family Office (FFO), founded by Hossein Fateh.

Which other companies operate data centers in United States?

Besides CloudHQ, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Ashburn?

Other tracked data centers in Ashburn include Vantage Ashburn III (VA3) campus (Vantage Data Centers), PowerHouse Pacific (PowerHouse Data Centers), Cologix Ashburn Beaumeade land (38 acres) (Cologix) and QTS Ashburn 3 (QTS).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst