AdaniConneX Data Centers
Data centers operated by AdaniConneX that we have verified: location, status and capacity, each checked against its source.
In short
As of 10 October 2026, DC Market Insights tracks 6 data centers operated by AdaniConneX in 1 country, of which 4 are operational. Stated operational capacity is 1,033 MW, with a further 1,000 MW under construction and 1,000 MW planned. The pipeline is 1.9 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 6 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
AdaniConneX data centers: key facts
About AdaniConneX
AdaniConneX provides build-to-suit, colocation, connectivity and managed services data centres in India. Its site list on its own website covers Chennai, Hyderabad, Navi Mumbai, Noida, Pune and Visakhapatnam, and it states 1+ GW of capacity deployed and under deployment in India.
- Ownership
- JV of Adani Group and EdgeConneX
- Tracked footprint
- 6 facilities in 1 country
- Website
- adaniconnex.com
Data center business
- Site list on the company's data centers page: Chennai 1 (33 MW IT load), Hyderabad (600 MW IT load), Navi Mumbai (1000 MW IT load), Noida (150 MW IT load), Pune (250 MW IT load) and Visakhapatnam (1 GW IT load).
- The company states a target of 3 GW of data center capacity by 2031.
- Chennai 1 is at SIPCOT, Siruseri, Tamil Nadu; Phase 1 of 17 MW is live within a 33 MW campus.
- Services offered: build-to-suit, colocation, connectivity and managed services.
Recent updates
- Adani Enterprises and Jabil announced a target strategic alliance to build an AI data center infrastructure platform in India (release dated 15 June 2026).
- Adani Enterprises, through AdaniConneX, and Google announced a partnership to build a data centre campus in Visakhapatnam, with approximately USD 15 billion of investment over 2026-2030.
- Pune site shows Phase 1 live in October 2025 (250 MW IT load site capacity).
- AdaniConneX and Extreme IX set up a networking point of presence at the Chennai 1 data center, with plans to add PoPs at other AdaniConneX data centers across India.
- Noida site shows Phase 1 live in January 2025 (150 MW IT load site capacity).
Company details checked against company and official sources, 10 Oct 2026.
- Capacity under construction or planned (2,000 MW) is 1.9 times the operational base of 1,033 MW.
- Its largest operational site is AdaniConneX Hyderabad in Hyderabad, India at 600 MW.
- The largest project in the pipeline is AdaniConneX Navi Mumbai (1,000 MW, planned).
- By type, the tracker lists 5 hyperscale and 1 colocation facilities.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
AdaniConneX development pipeline
Under construction and planned facilities with a stated capacity, largest first. 1,000 MW under construction and 1,000 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| AdaniConneX Navi MumbaiAdaniConneX | Navi Mumbai, India | Planned | Hyperscale | 1,000 MW |
| AdaniConneX VisakhapatnamAdaniConneX | Visakhapatnam, India | Under construction | Hyperscale | 1,000 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| AdaniConneX Navi MumbaiHyperscale | Navi Mumbai, India | Planned | 1,000 MW IT | — | Operator / official |
AdaniConneX VisakhapatnamHyperscale
History
|
Visakhapatnam, India | Under construction | 1,000 MW IT | — | Operator / official |
| AdaniConneX HyderabadHyperscale | Hyderabad, India | Operational | 600 MW IT | 2024 | Operator / official |
| AdaniConneX PuneHyperscale | Pune, India | Operational | 250 MW IT | 2025 | Operator / official |
| AdaniConneX NoidaHyperscale | Noida, India | Operational | 150 MW IT | 2025 | Operator / official |
AdaniConneX Chennai 1Colocation
History
|
Chennai, India | Operational | 33 MW IT | 2022 | Operator / official |
Market position
How AdaniConneX compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In India, AdaniConneX ranks #1 of 31 tracked operators by capacity, with 30% of the country’s tracked MW.
- India has 199 tracked data centers from 31 operators: 2,276 MW operational and 7,840 MW under construction or planned.
- Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
- Hyderabad also hosts 10 other tracked data center(s), run by HyperVault, CtrlS, Sify and Nxtra (Airtel).
- Our Deal Tracker lists 2 deal(s) naming AdaniConneX, the latest on 5 November 2026.
Data center operators in India
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| CtrlS | 24 | 276 MW | 1,695 MW |
| HyperVault | 2 | — | 1,000 MW |
| STT GDC India | 34 | 217 MW | 393 MW |
| Sify | 16 | 188 MW | 290 MW |
| Amazon Web Services | 2 | — | 473 MW |
| Princeton Digital Group | 5 | 48 MW | 382 MW |
| Nxtra (Airtel) | 5 | 38 MW | 315 MW |
| Lumina CloudInfra | 2 | — | 276 MW |
All data centers in India Power and policy in India
Other data centers in Hyderabad
- HyperVault Hyderabad AI Data Center Campus · HyperVault · Planned · 1,000 MW
- Hyderabad Future City Campus · CtrlS · Planned · 750 MW
- Hyderabad Chandan Valley Campus · CtrlS · Planned · 700 MW
- Sify Hyderabad 02 (Fab City) · Sify · Planned · 250 MW
- Nxtra Hyderabad (HYD 1), Kokapet · Nxtra (Airtel) · Planned · 200 MW
- HY1 · Princeton Digital Group · Planned · 90 MW
- Sify Hyderabad 01 · Sify · Operational · 14.4 MW
- Hyderabad DC3 · CtrlS · Operational · 13 MW
- Hyderabad DC2 · CtrlS · Operational · 7.4 MW
- Hyderabad DC1 · CtrlS · Operational · 6 MW
Deals naming AdaniConneX
- AdaniConneX → Vizag Mega Data Center Park Limited M&A $114.9M
- CoreWeave → 240MW at AdaniConneX Taloja campus, Navi Mumbai (three 80MW buildings) JV / partnership
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does AdaniConneX operate?
DC Market Insights tracks 6 AdaniConneX data center(s) in 1 country as of October 2026: 4 operational, 1 under construction and 1 planned.
Which other companies operate data centers in India?
Besides AdaniConneX, the largest operators we track in India by capacity are CtrlS, HyperVault, STT GDC India, Sify and Amazon Web Services. The India page lists all 31 operators.
What rules apply to data centers in India?
Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.
Which other data centers are in Hyderabad?
Other tracked data centers in Hyderabad include HyperVault Hyderabad AI Data Center Campus (HyperVault), Hyderabad Future City Campus (CtrlS), Hyderabad Chandan Valley Campus (CtrlS) and Sify Hyderabad 02 (Fab City) (Sify).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.