Proprietary data
HyperVault Data Centers
Data centers operated by HyperVault that we have verified: location, status and capacity, each checked against its source.
In short
As of 18 November 2026, DC Market Insights tracks 2 data centers operated by HyperVault in 1 country, of which 0 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 1 of 2 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
HyperVault data centers: key facts
About HyperVault
HyperVault AI Data Center Limited is the AI data center business of Tata Consultancy Services (TCS), set up in India in October 2025 and co-owned 51:49 with TPG. It is building liquid-cooled, high-density AI data centers in phases toward capacity in excess of one gigawatt. Its first announced site is an AI campus of up to 1GW on 264 acres in Hyderabad, Telangana (September 2026). TCS and TPG plan to invest up to Rs 18,000 crore in the platform.
- Headquarters
- India
- Founded
- 2025
- Ownership
- Tata Consultancy Services 51%, TPG Terabyte Bidco Pte. Ltd. 49% (TPG subscribed 9 Mar 2026)
- Parent company
- Tata Consultancy Services
- Tracked footprint
- 2 facilities in 1 country
- Website
- tcs.com
Data center business
- HyperVault AI Data Center Limited was incorporated in India on 29 October 2025 as a wholly owned subsidiary of Tata Consultancy Services. TCS describes it as its AI data center business, set up to deliver GW-scale, secure and reliable AI-ready infrastructure for hyperscalers, AI companies and global enterprises.
- HyperVault's data centers are designed to be purpose-built and liquid-cooled, with direct-to-chip cooling, high rack density, an energy model that combines green power and reliability, and network connectivity, to host AI training and inference workloads. The platform is being built in phases toward capacity in excess of one gigawatt.
- Funding comes from equity from TCS and TPG plus debt. The two partners committed to invest up to Rs 18,000 crore over the next few years in a 51:49 ratio: TCS up to Rs 9,180 crore and TPG up to Rs 8,820 crore. As at 31 March 2026 TCS had invested Rs 208 crore in HyperVault shares.
- TPG's investment is made through TPG Rise Climate and its Global South Initiative, launched with ALTERRA, and through TPG's Asia Real Estate business. The Tata group release of 20 November 2025 said TPG was envisaged to hold between 27.5% and 49% of HyperVault.
- TCS states that the first phase of 100 MW will be built for OpenAI as the anchor customer, with an option to scale to 1 GW, under a multi-year partnership between TCS' HyperVault and OpenAI to develop AI infrastructure in India. The site of this first phase is not named in the annual report.
- The Hyderabad AI campus is planned on 264 acres with up to 1GW capacity, built in phases in line with customer demand, for frontier AI companies and hyperscalers running high-density GPU deployments. HyperVault and its partners expect to invest up to Rs 70,000 crore to build and manage it; the campus is to use green energy and water-neutral design principles.
- HyperVault is led by Deepesh Kiran Nanda, CEO and Managing Director of HyperVault AI Data Center Limited.
Recent updates
- HyperVault secured 264 acres of land in Hyderabad, Telangana, for an AI data center campus of up to 1GW. The Telangana Chief Minister called the project historic; TCS filed the release with BSE and NSE.
- TCS and Siemens Energy signed two MoUs; Siemens Energy India Limited will support HyperVault's AI infrastructure development in India in power generation, electrification systems, grid technologies, digital solutions and software platforms.
- After all conditions precedent were met, TPG Terabyte Bidco subscribed to 49% of HyperVault's paid-up share capital (Rs 199.4 crore on a diluted basis), so HyperVault ceased to be a wholly owned TCS subsidiary.
- TCS, through HyperVault, and AMD agreed to co-develop a rack-scale AI infrastructure design based on the AMD Helios platform and to offer an AI-ready data center blueprint supporting up to 200 MW of capacity in India.
- TCS signed a Securities Subscription Agreement and Shareholders' Agreement with TPG Terabyte Bidco and HyperVault, with combined commitments of up to Rs 18,000 crore, TPG up to Rs 8,820 crore.
Company details checked against company and official sources, 18 Nov 2026.
- The largest project in the pipeline is HyperVault Hyderabad AI Data Center Campus (1,000 MW, planned).
- 1 of 2 facilities have a capacity stated by their source; the totals above count only those.
HyperVault development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,000 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| HyperVault Hyderabad AI Data Center CampusHyperVault | Hyderabad, India | Planned | Hyperscale | 1,000 MW |
Facilities
2 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
HyperVault Hyderabad AI Data Center CampusHyperscale
History · 1 deal
|
Hyderabad, India | Planned | 1,000 MW | — | Operator / official |
| HyperVault Pune (Bopkhel) data center siteHyperscale | Pune, India | Planned | — | — | Trade press |
Market position
How HyperVault compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In India, HyperVault ranks #3 of 31 tracked operators by capacity, with 10% of the country’s tracked MW.
- India has 193 tracked data centers from 31 operators: 2,244 MW operational and 7,718 MW under construction or planned.
- Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
- Pune also hosts 10 other tracked data center(s), run by AdaniConneX, STT GDC India, Microsoft and National Informatics Centre.
- Our Deal Tracker lists 1 deal(s) naming HyperVault, the latest on 5 September 2026.
Data center operators in India
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AdaniConneX | 6 | 1,033 MW | 2,000 MW |
| CtrlS | 24 | 276 MW | 1,695 MW |
| STT GDC India | 34 | 217 MW | 393 MW |
| Sify | 16 | 188 MW | 290 MW |
| Amazon Web Services | 2 | — | 473 MW |
| Princeton Digital Group | 5 | 48 MW | 382 MW |
| Nxtra (Airtel) | 5 | 38 MW | 315 MW |
| Lumina CloudInfra | 2 | — | 276 MW |
All data centers in India Power and policy in India
Other data centers in Pune
- AdaniConneX Pune · AdaniConneX · Operational · 250 MW
- STT Pune 5 · STT GDC India · Operational · 24 MW
- STT Pune 4 · STT GDC India · Operational · 18 MW
- STT Pune 2 · STT GDC India · Operational · 15 MW
- STT Pune 3 · STT GDC India · Operational · 15 MW
- STT Pune 1 · STT GDC India · Operational · 9 MW
- Microsoft Pune (Central India) datacenter region · Microsoft · Operational
- Microsoft Pune Hinjewadi land parcel (16 acres) · Microsoft · Planned
- NIC National Data Centre Pune · National Informatics Centre · Operational
- Nxtra Pune Campus · Nxtra (Airtel) · Operational
Deals naming HyperVault
- HyperVault AI Data Center Limited (TCS subsidiary) and partners → Up to 1GW AI data centre campus on 264 acres, Hyderabad Land / campus $7.41B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does HyperVault operate?
DC Market Insights tracks 2 HyperVault data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 2 planned.
Where is HyperVault headquartered?
HyperVault is headquartered in India. Ownership: Tata Consultancy Services 51%, TPG Terabyte Bidco Pte. Ltd. 49% (TPG subscribed 9 Mar 2026).
Which other companies operate data centers in India?
Besides HyperVault, the largest operators we track in India by capacity are AdaniConneX, CtrlS, STT GDC India, Sify and Amazon Web Services. The India page lists all 31 operators.
What rules apply to data centers in India?
Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.
Which other data centers are in Pune?
Other tracked data centers in Pune include AdaniConneX Pune (AdaniConneX), STT Pune 5 (STT GDC India), STT Pune 4 (STT GDC India) and STT Pune 2 (STT GDC India).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.