As of 15 November 2026, DC Market Insights tracks 17 government actions on data centers and power in India, 11 of them in force. India has 1 restriction on new data centers in force: Guidelines regulating groundwater extraction for infrastructure/commercial projects (S.O. 3289(E)). 5 incentive schemes apply, including Uttar Pradesh Data Centre Policy 2026.
Market snapshot
India power and policy: key facts
- Industrial electricity price: 82.1 USD/MWh (2025). Rank 23 of 30 tracked countries, highest first.
- Renewable share of electricity generation: 28.7% (2026). Rank 26 of 42 tracked countries, highest first.
- Grid emission factor: 0.68 kgCO2/kWh (2025). Rank 5 of 36 tracked countries, highest first.
- Latest change: Uttar Pradesh Data Centre Policy 2026 (Department of IT & Electronics, Government of Uttar Pradesh, 13 Aug 2026).
- By type: 8 incentive, 6 regulation, 1 power tariff and 1 plan or strategy.
Power indicators for India
Latest official figure for each indicator, with earlier years where we have them.
In force now in India
Restriction (1)
Guidelines regulating groundwater extraction for infrastructure/commercial projects (S.O. 3289(E))
In its Rajya Sabha reply on water use by AI data centres (6 Aug 2026), MoEFCC said groundwater extraction for infrastructure and commercial projects is regulated under the Ministry of Jal Shakti guidelines, Notification S.O. 3289(E) of 24.09.2020, as amended on 29.03.2023. The government named this as one of the rules that apply to data centre water use.
Power tariff (1)
Notification on exemption from payment of electricity duty to IT/ITeS and Data Centre units (CEI-2025/CR-158/Energy-1)
Notification of 22 June 2026 under the Maharashtra Electricity Duty Act, 2016, supporting the IT/ITeS Policy 2023 and the Policy for Integrated Green Data Centre Parks; new and existing data centre units qualify for a 20-year electricity duty exemption.
20 years electricity duty exemption
Incentive (5)
Uttar Pradesh Data Centre Policy 2026
Promulgation notified 13/08/2026, notification published 22/08/2026. UPLC lists policy targets of INR 2 lakh crore+ investment and 2 GW+ capacity, a special package for projects over 500 MW, 7% capital subsidy up to INR 20 crore, 100% electricity duty exemption for 10 years and dual grid supply for the first 8 DC parks.
2 GW capacity target
Haryana State Data Center Policy, 2022: declaration of Data Centers as a separate Infrastructure Industry
Notification No. 02/13/2023-4IB-II dated 22 November 2023 declares data centers covered under the Haryana State Data Center Policy, 2022 (notified 7 July 2022) a separate Infrastructure Industry, effective from the date of notification.
Maharashtra Information Technology and IT Enabled Services Policy 2023
Resolution dated 27 June 2023. Grants permanent electricity duty exemption to new and existing registered data center units and a power tariff subsidy of INR 1 per unit for five years for new data center units outside Zone-I. Valid five years from 27 June 2023 or until a new policy is released.
1 INR/kWh power tariff subsidy 5 years, new DC units outside Zone-I
Inclusion of Data Centres in the Harmonized Master List of Infrastructure Sub-sectors (F. No. 13/1/2017-INF)
Department of Economic Affairs notification dated 11 October 2022 adds Data Centres under the Communication category of the Harmonized Master List of Infrastructure sub-sectors, defined as a data centre in a dedicated/centralized building with a minimum capacity of 5 MW of IT load.
5 MW minimum IT load
Odisha Data Centre Policy-2022
Offers a capital investment subsidy of 20% of fixed capital investment excluding land (cap Rs 25 crore per unit), 100% electricity duty exemption up to 5 MVA contract demand for 10 years, 30% power bill subsidy for 5 years (cap Rs 2 crore), 100% reimbursement of transmission and wheeling charges for captive renewable power, and industrial power tariff. (source gives year only)
20 % capital subsidy cap Rs 25 crore per data centre unit
Regulation (4)
Environmental Clearance for AI Data Centres under the EIA Notification, 2006 (Rajya Sabha written reply)
In a written reply in the Rajya Sabha, MoEFCC said AI data centres do not, per se, require Environmental Clearance under the EIA Notification, 2006. Prior EC is needed only when a data centre is part of a Building and Construction Project (Item 8(a)) or a Township and Area Development Project (Item 8(b)) above the stated thresholds. For building projects the EC is granted by the State Environment Impact Assessment Authority (SEIAA). Freshwater availability in water-stressed regions and greywater reuse are considered at appraisal.
20,000 sq. m Value is the Item 8(a) built-up area threshold. The Item 8(b) township thresholds stand in value_text as the source writes them. There is no category for data centres themselves.
CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025
This third amendment to India's ISTS connectivity and GNA framework was notified by CERC on 31 August 2025 and took effect on 9 September 2025. It changed how in-principle and final grants of connectivity are issued, including the coordinates and land-document timelines tied to ISTS substations. It also added transition rules requiring pending in-principle cases to be moved to final grants.
Declaration of Data Center Industries as an essential service (Uttar Pradesh)
Uttar Pradesh Government Order dated 11 October 2022 declaring data center industries an essential service, issued under the UP Data Center Policy framework.
One-time GNA charge under CERC GNA Regulations, 2022
Under Regulation 22.2(d) of the CERC GNA Regulations, entities connecting directly to ISTS under Regulation 4.1 or 17.1(iii) pay a one-time GNA charge per MW of GNA quantum. Clause 17.1(iii) is the route for directly connected drawee entities such as bulk consumers. If unpaid, the charge is recovered from the Conn-BGs, and the proceeds reduce monthly transmission charges. The draft fourth amendment would move the due date to within 15 days after GNA becomes effective and would bar entities without subsisting BGs from grid transactions until they pay.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Draft CERC GNA Fourth Amendment – new Regulation 23A (Transfer of GNA)
The draft proposes that drawal GNA granted for an identified load at a single drawal point moves to the new owner when that load is sold. The transfer is allowed only after the GNA has become effective and the original grantee has cleared its dues. The current regulations have no explicit transfer provision for drawal GNA.
Draft CERC GNA Fourth Amendment – new Regulation 17.5 (drawee entities connecting to both ISTS and State networks)
CERC's draft fourth amendment proposes Regulation 17.5. A drawee entity already connected to a State transmission or distribution network could connect directly to ISTS for the same drawal capacity, with STU consent and continued payment of applicable charges. The reverse would also be allowed, subject to Nodal Agency consent on technical feasibility. Entities holding GNA-RE would be excluded unless they convert to GNA.
Draft Data Centre Policy 2020 (Ministry of Electronics and Information Technology)
MeitY draft policy proposing infrastructure status for the data centre sector, declaration of data centres as an essential service under ESMA 1968, simplified clearances, and at least four Data Centre Economic Zones through a DCEZ scheme. No final national policy has been notified.
4 data centre economic zones (proposed)
Timeline of data center and power policy in India
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 13 Aug 2026 | Uttar Pradesh Data Centre Policy 2026 Uttar Pradesh | Incentive | In force | Department of IT & Electronics, Government of Uttar Pradesh |
| 6 Aug 2026 | Environmental Clearance for AI Data Centres under the EIA Notification, 2006 (Rajya Sabha written reply) | Regulation | In force | Ministry of Environment, Forest and Climate Change |
| 22 Jun 2026 | Notification on exemption from payment of electricity duty to IT/ITeS and Data Centre units (CEI-2025/CR-158/Energy-1) Maharashtra | Power tariff | In force | Government of Maharashtra (Energy Department) |
| 20 May 2026 | Draft CERC GNA Fourth Amendment – new Regulation 23A (Transfer of GNA) | Regulation | Proposed | Central Electricity Regulatory Commission |
| 20 May 2026 | Draft CERC GNA Fourth Amendment – new Regulation 17.5 (drawee entities connecting to both ISTS and State networks) | Regulation | Proposed | Central Electricity Regulatory Commission |
| 31 Aug 2025 | CERC (Connectivity and General Network Access to the inter-State Transmission System) (Third Amendment) Regulations, 2025 | Regulation | In force | Central Electricity Regulatory Commission |
| 22 Nov 2023 | Haryana State Data Center Policy, 2022: declaration of Data Centers as a separate Infrastructure Industry Haryana | Incentive | In force | Industries & Commerce Department, Government of Haryana |
| 27 Jun 2023 | Maharashtra Information Technology and IT Enabled Services Policy 2023 Maharashtra | Incentive | In force | Government of Maharashtra |
| 11 Oct 2022 | Declaration of Data Center Industries as an essential service (Uttar Pradesh) Uttar Pradesh | Regulation | In force | Department of IT & Electronics, Government of Uttar Pradesh |
| 11 Oct 2022 | Inclusion of Data Centres in the Harmonized Master List of Infrastructure Sub-sectors (F. No. 13/1/2017-INF) | Incentive | In force | Department of Economic Affairs, Ministry of Finance |
| 7 Jun 2022 | One-time GNA charge under CERC GNA Regulations, 2022 | Regulation | In force | Central Electricity Regulatory Commission |
| 1 Jan 2022 | Odisha Data Centre Policy-2022 Odisha | Incentive | In force | Electronics & Information Technology Department, Government of Odisha |
| 23 Nov 2021 | Tamil Nadu Data Centre Policy 2021 (G.O.(Ms.) No. 33 dated 23.11.2021) Tamil Nadu | Incentive | Expired | Information Technology and Digital Services Department, Government of Tamil Nadu |
| 6 Sep 2021 | West Bengal Data Centre Policy, 2021 West Bengal | Incentive | Expired | Department of Information Technology & Electronics, Government of West Bengal |
| 9 Apr 2021 | Uttar Pradesh Data Center Policy 2021 Uttar Pradesh | Incentive | Expired | Department of IT & Electronics, Government of Uttar Pradesh |
| 9 Nov 2020 | Draft Data Centre Policy 2020 (Ministry of Electronics and Information Technology) | Plan or strategy | Proposed | Ministry of Electronics and Information Technology (MeitY) |
| 24 Sep 2020 | Guidelines regulating groundwater extraction for infrastructure/commercial projects (S.O. 3289(E)) | Restriction | In force | Ministry of Jal Shakti |
How India compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in India?
Yes. 1 restriction on new data centers is in force in India: Guidelines regulating groundwater extraction for infrastructure/commercial projects (S.O. 3289(E)).
What incentives does India offer data centers?
In force: Uttar Pradesh Data Centre Policy 2026, Haryana State Data Center Policy, 2022: declaration of Data Centers as a separate Infrastructure Industry, Maharashtra Information Technology and IT Enabled Services Policy 2023 and Inclusion of Data Centres in the Harmonized Master List of Infrastructure Sub-sectors (F. No. 13/1/2017-INF). Each is listed with its authority and dates on this page.
What does electricity cost for data centers in India?
The industrial electricity price in India was 82.1 USD/MWh in 2025 (TGSPDCL (Telangana, TGERC-approved) FY 2025-26 tariff (applicable 01.05.2025-31.03.2026), HT-I(A) Industry General 33 kV energy charge Rs 7.15/unit (HT billed per kVAh; treated as kWh at unity power factor; excludes demand charge Rs 500/kVA/month and duti). Data center contracts can differ by voltage level, contract length and location.
How much of India’s electricity is renewable?
Renewables supplied 28.7% of electricity generation in India in 2026.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity does India have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.