CtrlS Data Centers
Data centers operated by CtrlS that we have verified: location, status and capacity, each checked against its source.
In short
As of 18 October 2026, DC Market Insights tracks 24 data centers operated by CtrlS in 1 country, of which 17 are operational. Stated operational capacity is 276 MW, with a further — under construction and 1,695 MW planned. The pipeline is 6.1 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 19 of 24 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
CtrlS data centers: key facts
About CtrlS
CtrlS Datacenters Ltd is a Hyderabad-based Indian data center operator offering hyperscale, colocation, connectivity and managed services. In June 2026 it said it operates 19 data centers across nine key markets in India with over 370 MW of capacity, and has 4.4 GW of projects at various stages of execution. Its campuses are in Mumbai, Hyderabad, Chennai, Noida, Bengaluru and Kolkata, with edge sites in Tier-2 cities, and Thailand is its planned first overseas market.
- Headquarters
- Hyderabad, India
- Founded
- 2007
- Ownership
- Private (unlisted), founder-led; CPP Investments agreed in June 2026 to acquire an 8.2% stake
- Tracked footprint
- 24 facilities in 1 country
- Website
- ctrls.com
Data center business
- CtrlS says it operates 19 data centers across nine key markets in India with over 370 MW of capacity, plus 4.4 GW of projects at various stages of execution. It plans to expand into the Middle East and Southeast Asia, with Thailand as its first overseas market.
- Mumbai is its largest operating campus: the company lists Mumbai DC1 & DC2 at 40 MW, DC3 at 10 MW, DC4 at 36.8 MW and DC5 at 32 MW, with DC6 & DC7 (95 MW) upcoming. The datacenters page now locates the campus in Navi Mumbai.
- In Hyderabad it lists DC1 (6 MW), DC2 (7.4 MW) and DC3 (13 MW). DC3 opened in May 2024 in the Gachibowli financial district with 13 MW IT load capacity, about 1,300 racks, a 1.34 lakh sq ft built-up area and an investment of over Rs 500 crore.
- In January 2025 CtrlS unveiled a campus on a 40-acre parcel at the Chandanvelly Industrial Park near Hyderabad with a potential IT load of over 600 MW when fully developed; phase 1 has secured 250 MW of sanctioned power.
- The Chennai Datacenter Park in Ambattur Industrial Estate, launched on 25 Feb 2025, has two data center buildings with a total IT load capacity of 72 MW and a 120 MW substation, backed by a direct investment of about Rs 4,000 crore.
- Edge sites listed by the company: Lucknow (0.2 MW IT), Patna Edge DC 1 (0.5 MW IT), Patna Edge DC 2 (11.6 MW IT) and Ahmedabad (9.2 MW IT), with Bhubaneswar, Bhopal and Kochi upcoming. CtrlS plans 20+ edge data centers across Tier-2 and Tier-3 cities and over 4.4 GW of capacity by 2030.
- For power, CtrlS signed an MoU with NTPC Green Energy to jointly set up grid-connected renewable energy projects of up to 2 GW or more for its captive use, and its website says it is building a 150 MW captive solar plant.
Recent updates
- CtrlS signed a Letter of Intent with the Government of Bihar to invest Rs 10,000 crore in a 150 MW hyperscale AI factory in Bodh Gaya, and inaugurated a Rs 400 crore data center in the Patliputra Industrial Area, Patna, with an IT load of 12 MW.
- CPP Investments committed up to INR 7,000 crore (C$1 billion): INR 4,000 crore for an 8.2% stake in CtrlS at a pre-money valuation of INR 44,824 crore, and up to INR 3,000 crore for a joint venture (CPP 48%, CtrlS 52%) that will develop hyperscale campuses across India.
- CtrlS and NTPC Green Energy signed a two-year MoU to develop up to 2 GW or more of grid-connected renewable capacity through new projects or acquisitions to supply CtrlS. At the time CtrlS operated 16 data centers across nine markets.
- CtrlS opened its first Kolkata data center at Bengal Silicon Valley, New Town, with 16 MW IT load in phase one of a four-phase plan to exceed 60 MW, as part of a Rs 2,200 crore commitment to eastern India.
- CtrlS announced a Rs 500 crore edge data center on a 5-acre parcel allotted by the Madhya Pradesh government in Badwai IT Park, Bhopal; the virtual groundbreaking took place on 27 Apr 2025. The company then reported 250 MW (IT load) of combined capacity.
Company details checked against company and official sources, 18 Oct 2026.
- Capacity under construction or planned (1,695 MW) is 6.1 times the operational base of 276 MW.
- Its largest operational site is Chennai Datacenter Park in Chennai, India at 72 MW.
- The largest project in the pipeline is Hyderabad Future City Campus by CtrlS (750 MW, planned).
- By type, the tracker lists 14 colocation, 7 edge and 3 hyperscale facilities.
- 19 of 24 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
CtrlS development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,695 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Hyderabad Future City CampusCtrlS | Hyderabad, India | Planned | Hyperscale | 750 MW |
| Hyderabad Chandan Valley CampusCtrlS | Hyderabad, India | Planned | Hyperscale | 700 MW |
| Bodh Gaya AI FactoryCtrlS | Bodh Gaya, India | Planned | Hyperscale | 150 MW |
| Mumbai DC6 & DC7CtrlS | Navi Mumbai, India | Planned | Colocation | 95 MW |
Facilities
24 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Hyderabad Future City CampusHyperscale | Hyderabad, India | Planned | 750 MW total | — | Operator / official |
| Hyderabad Chandan Valley CampusHyperscale | Hyderabad, India | Planned | 700 MW total | — | Operator / official |
Bodh Gaya AI FactoryHyperscale
History · 1 deal
|
Bodh Gaya, India | Planned | 150 MW total | — | Operator / official |
| Mumbai DC6 & DC7Colocation | Navi Mumbai, India | Planned | 95 MW total | — | Operator / official |
| Chennai Datacenter ParkColocation | Chennai, India | Operational | 72 MW IT | — | Operator / official |
| Mumbai DC1 & DC2Colocation | Navi Mumbai, India | Operational | 40 MW total | — | Operator / official |
| Mumbai DC4Colocation | Navi Mumbai, India | Operational | 36.8 MW total | — | Operator / official |
| Mumbai DC5Colocation | Navi Mumbai, India | Operational | 32 MW total | — | Operator / official |
Kolkata DC1Colocation
History
|
Kolkata, India | Operational | 16 MW IT | 2025 | Operator / official |
| Bangalore DC1Colocation | Bengaluru, India | Operational | 13 MW IT | — | Operator / official |
Hyderabad DC3Colocation
History
|
Hyderabad, India | Operational | 13 MW IT | 2024 | Operator / official |
Patna Edge DC2Edge
History
|
Patna, India | Operational | 12 MW IT | 2026 | Operator / official |
| Mumbai DC3Colocation | Navi Mumbai, India | Operational | 10 MW total | — | Operator / official |
| Ahmedabad Edge DCEdge | Ahmedabad, India | Operational | 9.2 MW IT | — | Operator / official |
| Noida DC1Colocation | Noida, India | Operational | 8 MW IT | — | Operator / official |
| Hyderabad DC2Colocation | Hyderabad, India | Operational | 7.4 MW total | — | Operator / official |
| Hyderabad DC1Colocation | Hyderabad, India | Operational | 6 MW total | — | Operator / official |
| Patna Edge DC1Edge | Patna, India | Operational | 0.5 MW IT | — | Operator / official |
| Lucknow Edge DCEdge | Lucknow, India | Operational | 0.2 MW IT | — | Operator / official |
Bhopal Edge DCEdge
History
|
Bhopal, India | Planned | — | — | Operator / official |
| Bhubaneswar Edge DCEdge | Bhubaneswar, India | Planned | — | — | Operator / official |
| Chennai DC1Colocation | Chennai, India | Operational | — | 2024 | Trade press |
| Chennai DC2Colocation | Chennai, India | Operational | — | 2025 | Trade press |
| Kochi Edge DCEdge | Kochi, India | Planned | — | — | Operator / official |
Market position
How CtrlS compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In India, CtrlS ranks #2 of 31 tracked operators by capacity, with 19% of the country’s tracked MW.
- India has 199 tracked data centers from 31 operators: 2,276 MW operational and 7,840 MW under construction or planned.
- Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
- Navi Mumbai also hosts 10 other tracked data center(s), run by AdaniConneX, Amazon Web Services, Princeton Digital Group and Sify.
- Our Deal Tracker lists 1 deal(s) naming CtrlS, the latest on 13 October 2026.
Data center operators in India
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AdaniConneX | 6 | 1,033 MW | 2,000 MW |
| HyperVault | 2 | — | 1,000 MW |
| STT GDC India | 34 | 217 MW | 393 MW |
| Sify | 16 | 188 MW | 290 MW |
| Amazon Web Services | 2 | — | 473 MW |
| Princeton Digital Group | 5 | 48 MW | 382 MW |
| Nxtra (Airtel) | 5 | 38 MW | 315 MW |
| Lumina CloudInfra | 2 | — | 276 MW |
All data centers in India Power and policy in India
Other data centers in Navi Mumbai
- AdaniConneX Navi Mumbai · AdaniConneX · Planned · 1,000 MW
- AWS Taloja Navi Mumbai Data Centre · Amazon Web Services · Planned · 473 MW
- MU2 · Princeton Digital Group · Planned · 120 MW
- MU1 expansion (three new buildings) · Princeton Digital Group · Under construction · 100 MW
- Sify Rabale · Sify · Operational · 96.9 MW
- MUM-3 · Iron Mountain · Under construction · 85 MW
- ESR Rabale MU1 Data Centre · ESR · Under construction · 60 MW
- Lumina CloudInfra Airoli Campus · Lumina CloudInfra · Under construction · 60 MW
- Yotta NM1 · Yotta · Operational · 52 MW
- CapitaLand Data Centre Navi Mumbai Tower 1 · CapitaLand · Operational · 50 MW
Deals naming CtrlS
- CtrlS Datacenters → 150 MW hyperscale AI factory, Bodh Gaya, Bihar Land / campus $1.05B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does CtrlS operate?
DC Market Insights tracks 24 CtrlS data center(s) in 1 country as of October 2026: 17 operational, 0 under construction and 7 planned.
Where is CtrlS headquartered?
CtrlS is headquartered in Hyderabad, India. Ownership: Private (unlisted), founder-led; CPP Investments agreed in June 2026 to acquire an 8.2% stake.
Which other companies operate data centers in India?
Besides CtrlS, the largest operators we track in India by capacity are AdaniConneX, HyperVault, STT GDC India, Sify and Amazon Web Services. The India page lists all 31 operators.
What rules apply to data centers in India?
Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.
Which other data centers are in Navi Mumbai?
Other tracked data centers in Navi Mumbai include AdaniConneX Navi Mumbai (AdaniConneX), AWS Taloja Navi Mumbai Data Centre (Amazon Web Services), MU2 (Princeton Digital Group) and MU1 expansion (three new buildings) (Princeton Digital Group).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.