Proprietary data

CtrlS Data Centers

Data centers operated by CtrlS that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 October 2026, DC Market Insights tracks 24 data centers operated by CtrlS in 1 country, of which 17 are operational. Stated operational capacity is 276 MW, with a further — under construction and 1,695 MW planned. The pipeline is 6.1 times the capacity already operating.

24Facilities tracked
1Countries
276 MWOperational (17 sites)
—Under construction (0 sites)
1,695 MWPlanned (7 sites)

MW = IT capacity where the source states it, otherwise total capacity. 19 of 24 facilities have a stated capacity; the others are counted as sites only.

Mumbai DC1 & DC2 · CtrlS · Navi Mumbai (approximate location)Mumbai DC3 · CtrlS · Navi Mumbai (approximate location)Mumbai DC4 · CtrlS · Navi Mumbai (approximate location)Mumbai DC5 · CtrlS · Navi Mumbai (approximate location)Mumbai DC6 & DC7 · CtrlS · Navi Mumbai (approximate location)Chennai Datacenter Park · CtrlS · Chennai (approximate location)Hyderabad DC1 · CtrlS · Hyderabad (approximate location)Hyderabad DC2 · CtrlS · Hyderabad (approximate location)Hyderabad DC3 · CtrlS · Hyderabad (approximate location)Noida DC1 · CtrlS · Noida (approximate location)Bangalore DC1 · CtrlS · Bengaluru (approximate location)Kolkata DC1 · CtrlS · Kolkata (approximate location)Hyderabad Future City Campus · CtrlS · Hyderabad (approximate location)Lucknow Edge DC · CtrlS · Lucknow (approximate location)Patna Edge DC1 · CtrlS · Patna (approximate location)Patna Edge DC2 · CtrlS · Patna (approximate location)Ahmedabad Edge DC · CtrlS · Ahmedabad (approximate location)Hyderabad Chandan Valley Campus · CtrlS · Hyderabad (approximate location)Bhubaneswar Edge DC · CtrlS · Bhubaneswar (approximate location)Bhopal Edge DC · CtrlS · Bhopal (approximate location)Kochi Edge DC · CtrlS · Kochi (approximate location)Chennai DC1 · CtrlS · Chennai (approximate location)Chennai DC2 · CtrlS · Chennai (approximate location)Bodh Gaya AI Factory · CtrlS · Bodh Gaya (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

CtrlS data centers: key facts

About CtrlS

CtrlS Datacenters Ltd is a Hyderabad-based Indian data center operator offering hyperscale, colocation, connectivity and managed services. In June 2026 it said it operates 19 data centers across nine key markets in India with over 370 MW of capacity, and has 4.4 GW of projects at various stages of execution. Its campuses are in Mumbai, Hyderabad, Chennai, Noida, Bengaluru and Kolkata, with edge sites in Tier-2 cities, and Thailand is its planned first overseas market.

Headquarters
Hyderabad, India
Founded
2007
Ownership
Private (unlisted), founder-led; CPP Investments agreed in June 2026 to acquire an 8.2% stake
Tracked footprint
24 facilities in 1 country
Website
ctrls.com

Data center business

  • CtrlS says it operates 19 data centers across nine key markets in India with over 370 MW of capacity, plus 4.4 GW of projects at various stages of execution. It plans to expand into the Middle East and Southeast Asia, with Thailand as its first overseas market.
  • Mumbai is its largest operating campus: the company lists Mumbai DC1 & DC2 at 40 MW, DC3 at 10 MW, DC4 at 36.8 MW and DC5 at 32 MW, with DC6 & DC7 (95 MW) upcoming. The datacenters page now locates the campus in Navi Mumbai.
  • In Hyderabad it lists DC1 (6 MW), DC2 (7.4 MW) and DC3 (13 MW). DC3 opened in May 2024 in the Gachibowli financial district with 13 MW IT load capacity, about 1,300 racks, a 1.34 lakh sq ft built-up area and an investment of over Rs 500 crore.
  • In January 2025 CtrlS unveiled a campus on a 40-acre parcel at the Chandanvelly Industrial Park near Hyderabad with a potential IT load of over 600 MW when fully developed; phase 1 has secured 250 MW of sanctioned power.
  • The Chennai Datacenter Park in Ambattur Industrial Estate, launched on 25 Feb 2025, has two data center buildings with a total IT load capacity of 72 MW and a 120 MW substation, backed by a direct investment of about Rs 4,000 crore.
  • Edge sites listed by the company: Lucknow (0.2 MW IT), Patna Edge DC 1 (0.5 MW IT), Patna Edge DC 2 (11.6 MW IT) and Ahmedabad (9.2 MW IT), with Bhubaneswar, Bhopal and Kochi upcoming. CtrlS plans 20+ edge data centers across Tier-2 and Tier-3 cities and over 4.4 GW of capacity by 2030.
  • For power, CtrlS signed an MoU with NTPC Green Energy to jointly set up grid-connected renewable energy projects of up to 2 GW or more for its captive use, and its website says it is building a 150 MW captive solar plant.

Recent updates

  • CtrlS signed a Letter of Intent with the Government of Bihar to invest Rs 10,000 crore in a 150 MW hyperscale AI factory in Bodh Gaya, and inaugurated a Rs 400 crore data center in the Patliputra Industrial Area, Patna, with an IT load of 12 MW.
  • CPP Investments committed up to INR 7,000 crore (C$1 billion): INR 4,000 crore for an 8.2% stake in CtrlS at a pre-money valuation of INR 44,824 crore, and up to INR 3,000 crore for a joint venture (CPP 48%, CtrlS 52%) that will develop hyperscale campuses across India.
  • CtrlS and NTPC Green Energy signed a two-year MoU to develop up to 2 GW or more of grid-connected renewable capacity through new projects or acquisitions to supply CtrlS. At the time CtrlS operated 16 data centers across nine markets.
  • CtrlS opened its first Kolkata data center at Bengal Silicon Valley, New Town, with 16 MW IT load in phase one of a four-phase plan to exceed 60 MW, as part of a Rs 2,200 crore commitment to eastern India.
  • CtrlS announced a Rs 500 crore edge data center on a 5-acre parcel allotted by the Madhya Pradesh government in Badwai IT Park, Bhopal; the virtual groundbreaking took place on 27 Apr 2025. The company then reported 250 MW (IT load) of combined capacity.

Company details checked against company and official sources, 18 Oct 2026.

  • Capacity under construction or planned (1,695 MW) is 6.1 times the operational base of 276 MW.
  • Its largest operational site is Chennai Datacenter Park in Chennai, India at 72 MW.
  • The largest project in the pipeline is Hyderabad Future City Campus by CtrlS (750 MW, planned).
  • By type, the tracker lists 14 colocation, 7 edge and 3 hyperscale facilities.
  • 19 of 24 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational276 MW
Planned1,695 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
13'2416'2512'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Facilities by type
Colocation14
Edge7
Hyperscale3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

CtrlS development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,695 MW planned in total.

ProjectLocationStatusTypeCapacity
Hyderabad Future City CampusCtrlS Hyderabad, India Planned Hyperscale 750 MW
Hyderabad Chandan Valley CampusCtrlS Hyderabad, India Planned Hyperscale 700 MW
Bodh Gaya AI FactoryCtrlS Bodh Gaya, India Planned Hyperscale 150 MW
Mumbai DC6 & DC7CtrlS Navi Mumbai, India Planned Colocation 95 MW

Facilities

24 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Hyderabad Future City CampusHyperscale Hyderabad, India Planned 750 MW total — Operator / official
Hyderabad Chandan Valley CampusHyperscale Hyderabad, India Planned 700 MW total — Operator / official
Bodh Gaya AI FactoryHyperscale
History · 1 deal
  1. Announced
  2. Planned
Bodh Gaya, India Planned 150 MW total — Operator / official
Mumbai DC6 & DC7Colocation Navi Mumbai, India Planned 95 MW total — Operator / official
Chennai Datacenter ParkColocation Chennai, India Operational 72 MW IT — Operator / official
Mumbai DC1 & DC2Colocation Navi Mumbai, India Operational 40 MW total — Operator / official
Mumbai DC4Colocation Navi Mumbai, India Operational 36.8 MW total — Operator / official
Mumbai DC5Colocation Navi Mumbai, India Operational 32 MW total — Operator / official
Kolkata DC1Colocation
History
  1. Operational
  2. Operational
Kolkata, India Operational 16 MW IT 2025 Operator / official
Bangalore DC1Colocation Bengaluru, India Operational 13 MW IT — Operator / official
Hyderabad DC3Colocation
History
  1. Operational
  2. Operational
Hyderabad, India Operational 13 MW IT 2024 Operator / official
Patna Edge DC2Edge
History
  1. Operational
  2. Operational
Patna, India Operational 12 MW IT 2026 Operator / official
Mumbai DC3Colocation Navi Mumbai, India Operational 10 MW total — Operator / official
Ahmedabad Edge DCEdge Ahmedabad, India Operational 9.2 MW IT — Operator / official
Noida DC1Colocation Noida, India Operational 8 MW IT — Operator / official
Hyderabad DC2Colocation Hyderabad, India Operational 7.4 MW total — Operator / official
Hyderabad DC1Colocation Hyderabad, India Operational 6 MW total — Operator / official
Patna Edge DC1Edge Patna, India Operational 0.5 MW IT — Operator / official
Lucknow Edge DCEdge Lucknow, India Operational 0.2 MW IT — Operator / official
Bhopal Edge DCEdge
History
  1. Announced
  2. Planned
Bhopal, India Planned — — Operator / official
Bhubaneswar Edge DCEdge Bhubaneswar, India Planned — — Operator / official
Chennai DC1Colocation Chennai, India Operational — 2024 Trade press
Chennai DC2Colocation Chennai, India Operational — 2025 Trade press
Kochi Edge DCEdge Kochi, India Planned — — Operator / official

Market position

How CtrlS compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In India, CtrlS ranks #2 of 31 tracked operators by capacity, with 19% of the country’s tracked MW.
  • India has 199 tracked data centers from 31 operators: 2,276 MW operational and 7,840 MW under construction or planned.
  • Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
  • Navi Mumbai also hosts 10 other tracked data center(s), run by AdaniConneX, Amazon Web Services, Princeton Digital Group and Sify.
  • Our Deal Tracker lists 1 deal(s) naming CtrlS, the latest on 13 October 2026.

Data center operators in India

Tracked facilities19931 operators
Operational capacity2,276 MW7,840 MW in the pipeline
CtrlS rank by capacity#2of 31 operators · 19%
Industrial power price82.1 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
AdaniConneX61,033 MW2,000 MW
HyperVault2—1,000 MW
STT GDC India34217 MW393 MW
Sify16188 MW290 MW
Amazon Web Services2—473 MW
Princeton Digital Group548 MW382 MW
Nxtra (Airtel)538 MW315 MW
Lumina CloudInfra2—276 MW

All data centers in India Power and policy in India

Other data centers in Navi Mumbai

  • AdaniConneX Navi Mumbai · AdaniConneX · Planned · 1,000 MW
  • AWS Taloja Navi Mumbai Data Centre · Amazon Web Services · Planned · 473 MW
  • MU2 · Princeton Digital Group · Planned · 120 MW
  • MU1 expansion (three new buildings) · Princeton Digital Group · Under construction · 100 MW
  • Sify Rabale · Sify · Operational · 96.9 MW
  • MUM-3 · Iron Mountain · Under construction · 85 MW
  • ESR Rabale MU1 Data Centre · ESR · Under construction · 60 MW
  • Lumina CloudInfra Airoli Campus · Lumina CloudInfra · Under construction · 60 MW
  • Yotta NM1 · Yotta · Operational · 52 MW
  • CapitaLand Data Centre Navi Mumbai Tower 1 · CapitaLand · Operational · 50 MW

Deals naming CtrlS

  • CtrlS Datacenters → 150 MW hyperscale AI factory, Bodh Gaya, Bihar Land / campus $1.05B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does CtrlS operate?

DC Market Insights tracks 24 CtrlS data center(s) in 1 country as of October 2026: 17 operational, 0 under construction and 7 planned.

Where is CtrlS headquartered?

CtrlS is headquartered in Hyderabad, India. Ownership: Private (unlisted), founder-led; CPP Investments agreed in June 2026 to acquire an 8.2% stake.

Which other companies operate data centers in India?

Besides CtrlS, the largest operators we track in India by capacity are AdaniConneX, HyperVault, STT GDC India, Sify and Amazon Web Services. The India page lists all 31 operators.

What rules apply to data centers in India?

Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.

Which other data centers are in Navi Mumbai?

Other tracked data centers in Navi Mumbai include AdaniConneX Navi Mumbai (AdaniConneX), AWS Taloja Navi Mumbai Data Centre (Amazon Web Services), MU2 (Princeton Digital Group) and MU1 expansion (three new buildings) (Princeton Digital Group).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst