Elsham Tech Park Ltd (Greystoke) Data Centers

Data centers operated by Elsham Tech Park Ltd (Greystoke) that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 1 data center operated by Elsham Tech Park Ltd (Greystoke) in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
1,000 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Elsham Tech Park Ltd (Greystoke) data centers: key facts

About Elsham Tech Park Ltd (Greystoke)

Elsham Tech Park is a proposed AI data centre campus in North Lincolnshire, England, next to Elsham Wolds Industrial Estate, and one of several proposed campuses in the Northern Lincolnshire AI Growth Zone.

Headquarters
United Kingdom
Founded
2025
Ownership
Owned by Greystoke Land Limited (75% or more, Companies House, 2025)
Parent company
Greystoke Land Limited
Tracked footprint
1 facility in 1 country
Website
elshamtechpark.com

Data center business

  • Trade press reports the planned campus at 1GW combined power draw across 15 data halls, with an on-site energy centre generating 49.9MW. Greystoke's own pages do not state a MW figure for Elsham Tech Park.
  • Companies House records Elsham Tech Park Limited (company number 16462312), incorporated 20 May 2025, status Active, with SIC codes 41100 (Development of building projects) and 63110 (Data processing, hosting and related activities). Registered office: C/O Dragon Argent Limited, 3 More London Riverside, London, SE1 2RE. UK Companies House
  • Elsham Tech Park is described by its developer site as a proposed AI data centre campus next to Elsham Wolds Industrial Estate and as one of several proposed campuses in the Northern Lincolnshire AI Growth Zone. The site states £10bn+ is likely to be invested as the campus is fully built out and gives an indicative timeline of construction from 2027 and a first phase opening in 2029.
  • Greystoke states it masterplans and delivers large-scale data centres and that it is a trading name of Greystoke Land Limited. It cites a 2.5 GW pipeline of data centre projects and a proposed Northern Lincolnshire AI Growth Zone with up to 2.5 GW of capacity.

Recent updates

  • Trade press reported on 12 March 2026 that North Lincolnshire Council's planning committee granted outline planning permission for Elsham Tech Park.
  • Greystoke published an update stating that MPs and energy, industry, business and training leaders back the £20bn project.
  • Greystoke announced it had submitted a planning application for Elsham Tech Park, a £10 billion AI data centre campus, with construction expected to begin in 2027 and the first phase to open in 2029.

Company details checked against company and official sources, 10 Oct 2026.

  • The largest project in the pipeline is Elsham Tech Park (1,000 MW, planned).

Elsham Tech Park Ltd (Greystoke) development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,000 MW planned in total.

ProjectLocationStatusTypeCapacity
Elsham Tech ParkElsham Tech Park Ltd (Greystoke) Elsham, United Kingdom Planned Hyperscale 1,000 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Elsham Tech ParkHyperscale Elsham, United Kingdom Planned 1,000 MW total — Trade press

Market position

How Elsham Tech Park Ltd (Greystoke) compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Elsham Tech Park Ltd (Greystoke) ranks #2 of 54 tracked operators by capacity, with 11% of the country’s tracked MW.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Elsham Tech Park Ltd (Greystoke) rank by capacity#2of 54 operators · 11%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW
Virtus Data Centres1196.9 MW145 MW

All data centers in United Kingdom Power and policy in United Kingdom

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Elsham Tech Park Ltd (Greystoke) operate?

DC Market Insights tracks 1 Elsham Tech Park Ltd (Greystoke) data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Where is Elsham Tech Park Ltd (Greystoke) headquartered?

Elsham Tech Park Ltd (Greystoke) is headquartered in United Kingdom. Ownership: Owned by Greystoke Land Limited (75% or more, Companies House, 2025).

Which other companies operate data centers in United Kingdom?

Besides Elsham Tech Park Ltd (Greystoke), the largest operators we track in United Kingdom by capacity are Apatura, QTS, ILI Group, Ark Data Centres and Humber Tech Park. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst