Proprietary data
Equinix Data Centers
Data centers operated by Equinix that we have verified: location, status and capacity, each checked against its source.
In short
As of 20 November 2026, DC Market Insights tracks 201 data centers operated by Equinix in 20 countries, of which 192 are operational. Stated operational capacity is 88.5 MW, with a further 7.2 MW under construction and 300 MW planned. The pipeline is 3.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 8 of 201 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Equinix data centers: key facts
About Equinix
Equinix is a US-listed digital infrastructure company that runs International Business Exchange (IBX) colocation and interconnection data centers and, through joint ventures, xScale hyperscale data centers. Its investor relations site, citing the Q2 2026 earnings presentation, lists 282 data centers in 77 metros across 36 countries, more than 10,500 customers and more than 522,000 interconnections. At 31 December 2025 its annual report stated 280 data centers in 77 markets in 36 countries.
- Headquarters
- Redwood City, United States
- Founded
- 1998
- Ownership
- Listed on Nasdaq (EQIX)
- Tracked footprint
- 201 facilities in 20 countries
- Website
- equinix.com
Data center business
- Equinix's annual report for 2025 states that its global footprint spans 280 data centers in 77 markets in 36 countries as of 31 December 2025. Its investor relations site, citing the Q2 2026 earnings presentation, gives 282 data centers, 77 metros and 36 countries.
- The company reported more than 10,500 customers and 13,716 employees worldwide at 31 December 2025. Its headquarters is at One Lagoon Drive, Redwood City, California; it was incorporated in Delaware on 22 June 1998.
- Equinix runs two kinds of data centers: retail IBX colocation and interconnection sites, which it owns or leases, and xScale data centers for hyperscale customers, which the annual report says are developed and operated through joint venture partnership arrangements.
- Interconnection is central to the model: Equinix states more than 522,000 interconnections across its platform and says its ecosystem exceeds its next 10 competitors combined.
- In July 2026 Equinix said it had 52 projects underway across 33 markets worldwide, with nine new projects added since April 2026, and guided 2026 total capital expenditures of USD 5.0 to 6.0 billion, excluding xScale investments.
Recent updates
- Equinix and CPP Investments completed the USD 4 billion acquisition of atNorth, which runs eight operational data centers across the five Nordic countries. CPP Investments holds about 51%, Equinix about 34% (USD 895 million) and Partners Group about 10%.
- Q2 2026 revenue was USD 2.625 billion, up 16% year on year and helped by one-time xScale fees. Equinix raised its 2026 revenue guidance to USD 10.205 to 10.285 billion.
- Equinix announced KL2 in Cyberjaya, less than one kilometre from KL1, its fourth data center in Malaysia, with over USD 190 million of investment and more than 2,200 cabinets at full build-out.
- Equinix opened MB3 in Chandivali, Powai, its fourth IBX in Mumbai, with an initial investment of over USD 95 million, more than 1,370 cabinets at launch and more than 5,475 cabinets at full build-out.
- Equinix said it plans to invest GBP 3.9 billion in a campus on an 85-acre plot in Hertfordshire permitted for data centre development, with 250+ MW of compute capacity once fully built out. It already runs 14 data centres in the UK.
Company details checked against company and official sources, 11 Oct 2026.
- Capacity under construction or planned (307 MW) is 3.5 times the operational base of 88.5 MW.
- Its largest operational site is TY12x in Inzai, Japan at 54 MW.
- The largest project in the pipeline is Equinix Hertfordshire Campus (250 MW, planned).
- United Kingdom accounts for 63% of tracked capacity (15 facilities).
- By type, the tracker lists 186 colocation, 14 hyperscale and 1 other facilities.
- 8 of 201 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Equinix development pipeline
Under construction and planned facilities with a stated capacity, largest first. 7.2 MW under construction and 300 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Equinix Hertfordshire CampusEquinix | South Mimms, United Kingdom | Planned | Hyperscale | 250 MW |
| Equinix Jurong Island (DC-CFA2)Equinix | Singapore, Singapore | Planned | Colocation | 50 MW |
| JH2Equinix | Iskandar Puteri, Malaysia | Under construction | Colocation | 7.2 MW |
Facilities
201 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Equinix Hertfordshire CampusHyperscale | South Mimms, United Kingdom | Planned | 250 MW total | — | Operator / official |
| TY12xHyperscale | Inzai, Japan | Operational | 54 MW IT | — | Operator / official |
Equinix Jurong Island (DC-CFA2)Colocation
History
|
Singapore, Singapore | Planned | 50 MW total | — | Operator / official |
SG6Colocation
History
|
Singapore, Singapore | Operational | 20 MW IT | 2026 | Operator / official |
| FR13Colocation | Frankfurt, Germany | Operational | 7.8 MW IT | — | Trade press |
| JH2Colocation | Iskandar Puteri, Malaysia | Under construction | 7.2 MW | — | Trade press |
| JH1Colocation | Iskandar Puteri, Malaysia | Operational | 6 MW | 2024 | Trade press |
| LM1Colocation | Lima, Peru | Operational | 0.7 MW total | — | Operator / official |
| AM1Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM11Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM2Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM3Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM4Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM5Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM6Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM7Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM8Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AM9 and AM10 (Amstel III)Colocation | Amsterdam, Netherlands | Planned | — | — | Trade press |
| AT1Colocation | Atlanta, United States | Operational | — | — | Operator / official |
| AT4Colocation | Atlanta, United States | Operational | — | — | Operator / official |
| BG1Colocation | Bogotá, Colombia | Operational | — | — | Operator / official |
| BG2Colocation | Bogotá, Colombia | Operational | — | — | Operator / official |
| BO2Colocation | Billerica, United States | Operational | — | — | Operator / official |
| CN1Colocation | Chennai, India | Operational | — | 2025 | Trade press |
| DU1Colocation | Düsseldorf, Germany | Operational | — | — | Operator / official |
| EN1Colocation | Enschede, Netherlands | Operational | — | — | Operator / official |
| Equinix CH3Colocation | Elk Grove Village, United States | Operational | — | — | Operator / official |
| Equinix CH5Colocation | Elk Grove Village, United States | Operational | — | — | Operator / official |
| Equinix CH7Colocation | Westmont, United States | Operational | — | — | Operator / official |
| Equinix DA1 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA11 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA2 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA3 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA4 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA6 DallasColocation | Dallas, United States | Operational | — | — | Operator / official |
| Equinix DA7 DallasColocation | Plano, United States | Operational | — | — | Operator / official |
| Equinix DA9 DallasColocation | Irving, United States | Operational | — | — | Operator / official |
| Equinix DB1 DublinColocation | Dublin, Ireland | Operational | — | — | Operator / official |
| Equinix DB2 DublinColocation | Dublin, Ireland | Operational | — | — | Operator / official |
| Equinix DB3 DublinColocation | Dublin, Ireland | Operational | — | — | Operator / official |
| Equinix DB4 DublinColocation | Dublin, Ireland | Operational | — | — | Operator / official |
| Equinix DC1 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC10 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC11 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC12 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC13 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC14 ManassasColocation | Manassas, United States | Operational | — | — | Operator / official |
| Equinix DC15 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC16 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
| Equinix DC2 AshburnColocation | Ashburn, United States | Operational | — | — | Operator / official |
Market position
How Equinix compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Equinix is one of 171 operators we track.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Japan, Equinix ranks #8 of 20 tracked operators by capacity, with 3.1% of the country’s tracked MW.
- In United Kingdom, Equinix ranks #8 of 54 tracked operators by capacity, with 2.9% of the country’s tracked MW.
- Ashburn also hosts 10 other tracked data center(s), run by Vantage Data Centers, PowerHouse Data Centers, Cologix and QTS.
- Our Deal Tracker lists 1 deal(s) naming Equinix, the latest on 2 September 2026.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| Colt DCS | 9 | 101 MW | 262 MW |
| EdgeConneX | 1 | — | 200 MW |
| NTT DATA | 3 | 30 MW | 136 MW |
| CloudHQ | 1 | — | 96.4 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
| Vantage Data Centers | 1 | — | 68 MW |
| CyrusOne | 1 | — | 48 MW |
All data centers in Japan Power and policy in Japan
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Virtus Data Centres | 11 | 96.9 MW | 145 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Other data centers in Ashburn
- Vantage Ashburn III (VA3) campus · Vantage Data Centers · Planned · 288 MW
- PowerHouse Pacific · PowerHouse Data Centers · Under construction · 265 MW
- Cologix Ashburn Beaumeade land (38 acres) · Cologix · Planned · 85 MW
- QTS Ashburn 3 · QTS · Operational · 80 MW
- PowerHouse ABX-1 · PowerHouse Data Centers · Operational · 60 MW
- Sabey SDC Ashburn Building A · Sabey Data Centers · Under construction · 54 MW
- Cologix ASH2 Ashburn · Cologix · Under construction · 51 MW
- H5 Ashburn · H5 Data Centers · Under construction · 42 MW
- IAD3 Ashburn Campus Data Center · DataBank · Operational · 40 MW
- NTT DATA Ashburn VA7 · NTT DATA · Planned · 36 MW
Deals naming Equinix
- CPP Investments (c.51%) and Equinix (c.34%), with Partners Group reinvesting (c.10%) → atNorth (Nordic data center developer and operator) M&A $4.00B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Equinix operate?
DC Market Insights tracks 201 Equinix data center(s) in 20 countries as of November 2026: 192 operational, 2 under construction and 7 planned.
Where is Equinix headquartered?
Equinix is headquartered in Redwood City, United States. Ownership: Listed on Nasdaq (EQIX).
Which other companies operate data centers in United States?
Besides Equinix, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Ashburn?
Other tracked data centers in Ashburn include Vantage Ashburn III (VA3) campus (Vantage Data Centers), PowerHouse Pacific (PowerHouse Data Centers), Cologix Ashburn Beaumeade land (38 acres) (Cologix) and QTS Ashburn 3 (QTS).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.