In short

As of 9 November 2026, DC Market Insights tracks 13 data centers operated by Virtus Data Centres in 2 countries, of which 7 are operational. Stated operational capacity is 96.9 MW, with a further 286 MW under construction and 121 MW planned. The pipeline is 4.2 times the capacity already operating.

13Facilities tracked
2Countries
96.9 MWOperational (7 sites)
286 MWUnder construction (3 sites)
121 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 13 of 13 facilities have a stated capacity; the others are counted as sites only.

LONDON3 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON4 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON9 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON10 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON11 (Slough) · Virtus Data Centres · Slough (approximate location)LONDON19 (Slough) · Virtus Data Centres · Slough (approximate location)Marienpark Campus · Virtus Data Centres · Berlin (approximate location)Wustermark Campus · Virtus Data Centres · Wustermark (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Virtus Data Centres data centers: key facts

About Virtus Data Centres

VIRTUS Data Centres offers data centre colocation, with AI-ready, build-to-suit, colocation and high-performance computing (HPC) data centre offerings. It says its European data centres are located in three markets, London (UK), Berlin (Germany) and Milan (Italy), with multiple interconnected campuses designed and built to an Uptime Tier III standard, as stated on its website in October 2026.

Headquarters
London, United Kingdom
Ownership
STT GDC subsidiary; Macquarie Asset Management 40% minority stake (2023)
Parent company
ST Telemedia Global Data Centres
Tracked footprint
13 facilities in 2 countries
Website
virtusdatacentres.com

Data center business

  • VIRTUS says that, with over 15 years of proven performance, it designs, builds and operates some of Europe's most efficient high-density and liquid-cooled data centres.
  • VIRTUS's UK locations page states that its expanding portfolio comprises over 338MW of IT load in key strategic locations interconnected to key sites in London.

Recent updates

  • 24 Sep 2026: VIRTUS Data Centres, part of the STT GDC Group, announced the completion of a GBP 2.45 billion financing package to support continued growth.

Company details checked against company and official sources, 9 Nov 2026.

  • Capacity under construction or planned (406 MW) is 4.2 times the operational base of 96.9 MW.
  • Its largest operational site is LONDON4 (Slough) in Slough, United Kingdom at 26.6 MW.
  • The largest project in the pipeline is Wustermark Campus by Virtus Data Centres (204 MW, under construction).
  • Germany accounts for 52% of tracked capacity (2 facilities).
Capacity by status, MW
Operational96.9 MW
Under construction286 MW
Planned121 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Germany262 MW

OperationalUnder construction or planned

Virtus Data Centres development pipeline

Under construction and planned facilities with a stated capacity, largest first. 286 MW under construction and 121 MW planned in total.

ProjectLocationStatusTypeCapacity
Wustermark CampusVirtus Data Centres Wustermark, Germany Under construction Colocation 204 MW
Saunderton CampusVirtus Data Centres Saunderton, United Kingdom Planned Colocation 75 MW
Marienpark CampusVirtus Data Centres Berlin, Germany Under construction Colocation 57.6 MW
LONDON19 (Slough)Virtus Data Centres Slough, United Kingdom Planned Colocation 32.5 MW
LONDON9 (Slough)Virtus Data Centres Slough, United Kingdom Under construction Colocation 24 MW
LONDON11 (Slough)Virtus Data Centres Slough, United Kingdom Planned Colocation 13.3 MW

Facilities

13 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Wustermark CampusColocation
History
  1. Under construction
  2. Under construction
Wustermark, Germany Under construction 204 MW — Operator / official
Saunderton CampusColocation
1 deal
  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) US$3,239m
  • All deals in the Deal Tracker
Saunderton, United Kingdom Planned 75 MW IT — Operator / official
Marienpark CampusColocation Berlin, Germany Under construction 57.6 MW IT — Trade press
LONDON19 (Slough)Colocation
1 deal
  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) US$3,239m
  • All deals in the Deal Tracker
Slough, United Kingdom Planned 32.5 MW IT — Operator / official
LONDON4 (Slough)Colocation Slough, United Kingdom Operational 26.6 MW IT — Operator / official
LONDON5 (Stockley Park)Colocation Hayes, United Kingdom Operational 24 MW IT — Operator / official
LONDON9 (Slough)Colocation Slough, United Kingdom Under construction 24 MW IT — Operator / official
LONDON6 (Stockley Park)Colocation Hayes, United Kingdom Operational 16 MW IT — Operator / official
LONDON11 (Slough)Colocation Slough, United Kingdom Planned 13.3 MW IT — Operator / official
LONDON2 (Hayes)Colocation Hayes, United Kingdom Operational 12.3 MW IT — Operator / official
LONDON3 (Slough)Colocation Slough, United Kingdom Operational 7.2 MW IT — Operator / official
LONDON10 (Slough)Colocation Slough, United Kingdom Operational 6.6 MW IT — Operator / official
LONDON1 (Enfield)Colocation Enfield, United Kingdom Operational 4.2 MW IT — Operator / official

Market position

How Virtus Data Centres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Virtus Data Centres ranks #9 of 54 tracked operators by capacity, with 2.8% of the country’s tracked MW.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • In Germany, Virtus Data Centres ranks #9 of 56 tracked operators by capacity, with 4.9% of the country’s tracked MW.
  • Slough also hosts 10 other tracked data center(s), run by Manor Farm Propco, Yondr, Iron Mountain and Kao Data.
  • Our Deal Tracker lists 1 deal(s) naming Virtus Data Centres, the latest on 25 September 2026.

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Virtus Data Centres rank by capacity#9of 54 operators · 2.8%
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
Virtus Data Centres rank by capacity#9of 56 operators · 4.9%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Other data centers in Slough

  • Manor Farm Data Centre (Poyle) · Manor Farm Propco · Planned · 72 MW
  • Yondr Slough Building 3 · Yondr · Under construction · 40 MW
  • Iron Mountain LON-2 · Iron Mountain · Operational · 27 MW
  • Iron Mountain LON-3 · Iron Mountain · Under construction · 25 MW
  • KLON-06 (Slough) · Kao Data · Operational · 20 MW
  • CyrusOne LON4 · CyrusOne · Operational · 18 MW
  • CyrusOne LON5 · CyrusOne · Operational · 18 MW
  • CyrusOne LON1 · CyrusOne · Operational · 9 MW
  • CyrusOne LON3 · CyrusOne · Operational · 9 MW
  • Iron Mountain LON-1 · Iron Mountain · Operational · 8.8 MW

Deals naming Virtus Data Centres

  • Consortium of 13 banks incl. Standard Chartered, BNP Paribas, Crédit Agricole CIB, Société Générale → VIRTUS Data Centres UK and European portfolio (incl. 78MW Saunderton campus, LONDON19 Slough) Financing $3.24B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Virtus Data Centres operate?

DC Market Insights tracks 13 Virtus Data Centres data center(s) in 2 countries as of November 2026: 7 operational, 3 under construction and 3 planned.

Where is Virtus Data Centres headquartered?

Virtus Data Centres is headquartered in London, United Kingdom. Ownership: STT GDC subsidiary; Macquarie Asset Management 40% minority stake (2023).

Which other companies operate data centers in United Kingdom?

Besides Virtus Data Centres, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Slough?

Other tracked data centers in Slough include Manor Farm Data Centre (Poyle) (Manor Farm Propco), Yondr Slough Building 3 (Yondr), Iron Mountain LON-2 (Iron Mountain) and Iron Mountain LON-3 (Iron Mountain).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst