Proprietary data
Galaxy Data Centers Data Centers
Data centers operated by Galaxy Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 14 November 2026, DC Market Insights tracks 1 data center operated by Galaxy Data Centers in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Galaxy Data Centers data centers: key facts
- The largest project in the pipeline is Galaxy Redhill new data centre (Foxboro Business Park) (15 MW, planned).
Galaxy Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. — under construction and 15 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Galaxy Redhill new data centre (Foxboro Business Park)Galaxy Data Centers | Redhill, United Kingdom | Planned | Colocation | 15 MW |
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Galaxy Redhill new data centre (Foxboro Business Park)Colocation | Redhill, United Kingdom | Planned | 15 MW | — | Trade press |
Market position
How Galaxy Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United Kingdom, Galaxy Data Centers ranks #37 of 54 tracked operators by capacity, with 0.2% of the country’s tracked MW.
- United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
- Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Galaxy Data Centers operate?
DC Market Insights tracks 1 Galaxy Data Centers data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 1 planned.
Which other companies operate data centers in United Kingdom?
Besides Galaxy Data Centers, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.
What rules apply to data centers in United Kingdom?
Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.
