Proprietary data

Green Mountain Data Centers

Data centers operated by Green Mountain that we have verified: location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 5 data centers operated by Green Mountain in 1 country, of which 4 are operational. Stated operational capacity is 300 MW, with a further 80 MW under construction and — planned. The pipeline is 0.3 times the capacity already operating.

5Facilities tracked
1Countries
300 MWOperational (4 sites)
80 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 5 facilities have a stated capacity; the others are counted as sites only.

Green Mountain OSL-Hamar · Green Mountain · Hamar (approximate location)Green Mountain SVG-Rennesøy · Green Mountain · Stavanger (exact location)Green Mountain TEL-Rjukan · Green Mountain · Rjukan (exact location)Green Mountain OSL-Enebakk · Green Mountain · Enebakk (exact location)Green Mountain SVG-Undheim · Green Mountain · Time (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Green Mountain data centers: key facts

  • Capacity under construction or planned (80 MW) is 0.3 times the operational base of 300 MW.
  • Its largest operational site is Green Mountain OSL-Hamar in Hamar, Norway at 150 MW.
  • The largest project in the pipeline is Green Mountain SVG-Undheim (80 MW, under construction).
  • By type, the tracker lists 3 colocation and 2 hyperscale facilities.
  • 3 facilities publish a PUE figure; the lowest is 1.18 at Green Mountain SVG-Rennesøy (Green Mountain) and the median is 1.20.
Capacity by status, MW
Operational300 MW
Under construction80 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
25'1350'14'15'16'17'18'1975'20'21'22150'23

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Facilities by type
Colocation3
Hyperscale2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Green Mountain development pipeline

Under construction and planned facilities with a stated capacity, largest first. 80 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Green Mountain SVG-UndheimGreen Mountain Time, Norway Under construction Hyperscale 80 MW

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Green Mountain OSL-HamarHyperscale Hamar, Norway Operational 150 MW IT 2023 Operator / official
Green Mountain SVG-UndheimHyperscale Time, Norway Under construction 80 MW IT — Operator / official
Green Mountain OSL-EnebakkColocation Enebakk, Norway Operational 75 MW IT 2020 Operator / official
Green Mountain TEL-RjukanColocation Rjukan, Norway Operational 50 MW IT 2014 Operator / official
Green Mountain SVG-RennesøyColocation Stavanger, Norway Operational 25 MW IT 2013 Operator / official

Market position

How Green Mountain compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Norway, Green Mountain ranks #1 of 8 tracked operators by capacity, with 30% of the country’s tracked MW.
  • Norway has 22 tracked data centers from 8 operators: 446 MW operational and 820 MW under construction or planned.
  • Our Deal Tracker lists 1 deal(s) naming Green Mountain, the latest on 1 September 2026.

Data center operators in Norway

Tracked facilities228 operators
Operational capacity446 MW820 MW in the pipeline
Green Mountain rank by capacity#1of 8 operators · 30%
OperatorFacilitiesOperational MWPipeline MW
atNorth1—350 MW
Nscale1—230 MW
Lefdal Mine Datacenter280 MW80 MW
Polar Data Centers312 MW80 MW
STACK Infrastructure740 MW—
Bulk Infrastructure214 MW—
Google1——

All data centers in Norway

Deals naming Green Mountain

  • Unnamed neocloud operator → 14MW of AI-ready capacity at Green Mountain LON-East campus, Romford Land / campus

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Green Mountain operate?

DC Market Insights tracks 5 Green Mountain data center(s) in 1 country as of November 2026: 4 operational, 1 under construction and 0 planned.

Which other companies operate data centers in Norway?

Besides Green Mountain, the largest operators we track in Norway by capacity are atNorth, Nscale, Lefdal Mine Datacenter, Polar Data Centers and STACK Infrastructure. The Norway page lists all 8 operators.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.