Proprietary data
atNorth Data Centers
Data centers operated by atNorth that we have verified: location, status and capacity, each checked against its source.
DCMI Grid · Q4 2026
atNorth is a Leader in the DCMI Grid: Colocation and Hyperscale Developers, US and Europe
Rank 8 of 40. Active on deals and expansions in the last 12 months and secured power for its pipeline. New this quarter.
In short
As of 25 November 2026, DC Market Insights tracks 14 data centers operated by atNorth in 5 countries, of which 7 are operational. Stated operational capacity is 220 MW, with a further 430 MW under construction and 1,150 MW planned. The pipeline is 7.2 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 14 of 14 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
atNorth data centers: key facts
About atNorth
atNorth is a Nordic high-density colocation and build-to-suit data center provider. At the close of its US$4 billion acquisition by CPP Investments and Equinix on 2 September 2026 it reported eight operational data centers and several projects under development across all five Nordic countries: Iceland, Sweden, Finland, Denmark and Norway. Its own site list names campuses in Reykjavik, Keflavik, Akureyri, Stockholm, Helsinki, Myllykoski, Salo, Copenhagen, Varde and Haugaland.
- Founded
- 2009
- Ownership
- Private: CPP Investments c. 51%, Equinix c. 34%, Partners Group c. 10%, remainder held by atNorth internal stakeholders
- Parent company
- CPP Investments (Canada Pension Plan Investment Board), controlling stake
- Tracked footprint
- 14 facilities in 5 countries
- Website
- atnorth.com
Data center business
- In September 2026 Partners Group said atNorth has over 1.5 GW of secured power, with a considerable amount of planned additional future capacity.
- In February 2026 atNorth described its portfolio as eight operational data centers plus several sites under development across Denmark, Finland, Iceland, Norway and Sweden, with 1 GW of secured power for further expansion. Several facilities are enabled for liquid cooling to support high-density workloads.
- Crusoe is an anchor AI cloud customer at ICE02 in Iceland: the original December 2023 agreement covered 33 MW, and a 24 MW expansion announced in August 2025 takes Crusoe Cloud capacity at the campus to 57 MW, with NVIDIA GB200 NVL72 systems and direct liquid-to-chip cooling.
- atNorth sells high-density colocation (racks, cages, pods and private data halls) and large build-to-suit data centers, aimed at enterprise, hyperscale, cloud, AI and high-performance computing customers. It says it has operated data centers in the Nordics for more than 15 years and has more than 100 customers.
- The portfolio splits into metro sites and mega sites. Metro sites are ICE01 Reykjavik (3.2 MW, 2,700 sqm), SWE01 Stockholm, FIN01 and FIN02 Helsinki and DEN01 Copenhagen. Mega sites are ICE02 Keflavik (83 MW campus on 9 hectares), ICE03 Akureyri (50 MW on 4.3 hectares), FIN04 Myllykoski (430 MW on 65 hectares), FIN05 Salo, DEN02 Varde, SWE04 Sollefteå and NOR01 Haugaland.
- Heat reuse is built into new sites: atNorth lists heat reuse collaborations with Kesko in Finland, Stockholm Exergi in Sweden, and Vestforbrænding and Selected Group in Denmark. At FIN04 excess heat is to be recycled through the KSS Energia heating plant in Kouvola.
Recent updates
- 5 Oct 2026: atNorth announced FIN05 in Salo, Finland, on a 28.6-hectare site. Power for a first phase of 75 MW is secured, with a path to 230 MW; the site connects through a Fingrid substation. atNorth puts its investment at about EUR 2 billion, excluding customer servers.
- 2 Sep 2026: CPP Investments and Equinix completed the US$4 billion acquisition of atNorth from Partners Group. CPP Investments holds c. 51%, Equinix c. 34% and Partners Group, which reinvested, c. 10%; a US$4.1 billion (EUR 3.6 billion) financing package supports the deal and expansion. atNorth keeps its own brand and operates independently.
- 11 Aug 2026: Selected Group will use surplus heat from the DEN02 campus in Ølgod, Denmark, for a large greenhouse development next to the data center; the first phase is expected to be completed in Q3 2028.
- 3 Jun 2026: atNorth entered Norway by acquiring a 36-hectare plot in Haugaland Business Park for NOR01, with initial phases of 120 MW rising to 350 MW. Power is projected for 2028, supported by new substations from Statnett and the regional grid company Fagne.
- 23 Feb 2026: atNorth confirmed a 300 MW campus at Hamre Industrial Park in Långsele, Sollefteå Municipality, Sweden (SWE04), on a 50-hectare zoned plot, expected to be operational in H1 2028.
- 29 Jan 2026: atNorth announced SWE02, a 30 MW heat-reuse-enabled metro site in Kista, Stockholm, near SWE01 (opened March 2022), scheduled to go live in Q4 2027; it said this brings its total number of Nordic data centers to eleven.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (1,580 MW) is 7.2 times the operational base of 220 MW.
- Its largest operational site is atNorth ICE02 Keflavik in Keflavik, Iceland at 83 MW.
- The largest project in the pipeline is atNorth FIN04 Myllykoski (430 MW, under construction).
- Finland accounts for 35% of tracked capacity (4 facilities).
- By type, the tracker lists 10 colocation and 4 hyperscale facilities.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
atNorth development pipeline
Under construction and planned facilities with a stated capacity, largest first. 430 MW under construction and 1,150 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| atNorth FIN04 MyllykoskiatNorth | Kouvola, Finland | Under construction | Hyperscale | 430 MW |
| atNorth NOR01 HaugalandatNorth | Tysvær, Norway | Planned | Hyperscale | 350 MW |
| atNorth SWE04 Sollefteå (Hamre Industrial Park)atNorth | Långsele, Sweden | Planned | Hyperscale | 300 MW |
| atNorth DEN02 Varde mega siteatNorth | Ølgod, Denmark | Planned | Colocation | 250 MW |
| atNorth FIN05 SaloatNorth | Salo, Finland | Planned | Hyperscale | 160 MW |
| atNorth Ørslev (Vordingborg)atNorth | Vordingborg, Denmark | Planned | Colocation | 60 MW |
| atNorth SWE02 StockholmatNorth | Kista, Sweden | Planned | Colocation | 30 MW |
Facilities
14 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| atNorth FIN04 MyllykoskiHyperscale | Kouvola, Finland | Under construction | 430 MW total | — | Operator / official |
atNorth NOR01 HaugalandHyperscale
History · 1 deal
|
Tysvær, Norway | Planned | 350 MW total | — | Operator / official |
| atNorth SWE04 Sollefteå (Hamre Industrial Park)Hyperscale | Långsele, Sweden | Planned | 300 MW total | — | Operator / official |
atNorth DEN02 Varde mega siteColocation
Cooling: Hybrid
History
|
Ølgod, Denmark | Planned | 250 MW total | — | Operator / official |
atNorth FIN05 SaloHyperscale
History · 1 deal
|
Salo, Finland | Planned | 160 MW IT | — | Operator / official |
atNorth ICE02 KeflavikColocation
Cooling: Chilled water, dry coolers
History
|
Keflavik, Iceland | Operational | 83 MW total | — | Operator / official |
atNorth Ørslev (Vordingborg)Colocation
History
|
Vordingborg, Denmark | Planned | 60 MW | — | Operator / official |
| atNorth ICE03 AkureyriColocation Cooling: Chilled water, dry coolers | Akureyri, Iceland | Operational | 50 MW total | — | Operator / official |
| atNorth FIN02Colocation Cooling: Hybrid | Espoo, Finland | Operational | 40 MW total | — | Operator / official |
| atNorth DEN01Colocation Cooling: Direct liquid | Ballerup, Denmark | Operational | 30 MW total | 2025 | Operator / official |
| atNorth SWE02 StockholmColocation | Kista, Sweden | Planned | 30 MW total | — | Operator / official |
| atNorth SWE01 StockholmColocation Cooling: Hybrid | Kista, Sweden | Operational | 12 MW total | — | Operator / official |
| atNorth ICE01 ReykjavikColocation Cooling: Air or free cooling | Reykjavik, Iceland | Operational | 3.2 MW total | — | Operator / official |
| atNorth FIN01Colocation | Helsinki, Finland | Operational | 1.6 MW total | — | Operator / official |
Market position
How atNorth compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Finland, atNorth ranks #1 of 24 tracked operators by capacity, with 22% of the country’s tracked MW.
- Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
- Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
- In Iceland, atNorth ranks #2 of 3 tracked operators by capacity, with 48% of the country’s tracked MW.
- In Denmark, atNorth ranks #2 of 16 tracked operators by capacity, with 32% of the country’s tracked MW.
- Our Deal Tracker lists 2 deal(s) naming atNorth, the latest on 5 October 2026.
Data center operators in Finland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| DayOne | 1 | — | 560 MW |
| Nebius | 2 | 75 MW | 310 MW |
| FCDC Corp | 1 | — | 250 MW |
| AmpTank | 1 | — | 200 MW |
| Compute Nordic | 1 | — | 165 MW |
| Verne | 2 | 70 MW | 70 MW |
| Pure DC | 1 | — | 110 MW |
| HyperCo | 3 | — | 100 MW |
All data centers in Finland Power and policy in Finland
Data center operators in Iceland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Verne | 1 | 140 MW | — |
| Borealis Data Center | 3 | 10 MW | — |
All data centers in Iceland Power and policy in Iceland
Data center operators in Denmark
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| GARBE Data Centers | 1 | — | 350 MW |
| Prime Data Centers | 1 | — | 160 MW |
| CA Group | 1 | — | 100 MW |
| STACK Infrastructure | 1 | — | 72 MW |
| Digital Realty | 4 | 23 MW | — |
| Thylander | 1 | — | 11.5 MW |
| Penta Infra | 1 | 1.6 MW | — |
| Microsoft | 6 | — | — |
All data centers in Denmark Power and policy in Denmark
Deals naming atNorth
- atNorth → FIN05, 28.6ha site, Salo (75MW phase 1; up to 230MW) Land / campus $2.24B
- CPP Investments (c.51%) and Equinix (c.34%), with Partners Group reinvesting (c.10%) → atNorth (Nordic data center developer and operator) M&A $4.00B
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does atNorth operate?
DC Market Insights tracks 14 atNorth data center(s) in 5 countries as of November 2026: 7 operational, 1 under construction and 6 planned.
Which other companies operate data centers in Finland?
Besides atNorth, the largest operators we track in Finland by capacity are DayOne, Nebius, FCDC Corp, AmpTank and Compute Nordic. The Finland page lists all 24 operators.
What rules apply to data centers in Finland?
Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?