Proprietary data

atNorth Data Centers

Data centers operated by atNorth that we have verified: location, status and capacity, each checked against its source.

DCMI Grid Leader, Colocation and hyperscale, US and Europe, Q4 2026

DCMI Grid · Q4 2026

atNorth is a Leader in the DCMI Grid: Colocation and Hyperscale Developers, US and Europe

Rank 8 of 40. Active on deals and expansions in the last 12 months and secured power for its pipeline. New this quarter.

See the DCMI Grid Request your company’s scorecard

In short

As of 25 November 2026, DC Market Insights tracks 14 data centers operated by atNorth in 5 countries, of which 7 are operational. Stated operational capacity is 220 MW, with a further 430 MW under construction and 1,150 MW planned. The pipeline is 7.2 times the capacity already operating.

14Facilities tracked
5Countries
220 MWOperational (7 sites)
430 MWUnder construction (1 site)
1,150 MWPlanned (6 sites)

MW = IT capacity where the source states it, otherwise total capacity. 14 of 14 facilities have a stated capacity; the others are counted as sites only.

atNorth DEN01 · atNorth · Ballerup (approximate location) · Cooling: Direct liquidatNorth FIN01 · atNorth · Helsinki (approximate location)atNorth FIN02 · atNorth · Espoo (approximate location) · Cooling: HybridatNorth FIN04 Myllykoski · atNorth · Kouvola (approximate location)atNorth SWE01 Stockholm · atNorth · Kista (approximate location) · Cooling: HybridatNorth SWE02 Stockholm · atNorth · Kista (approximate location)atNorth SWE04 Sollefteå (Hamre Industrial Park) · atNorth · Långsele (approximate location)atNorth ICE02 Keflavik · atNorth · Keflavik (approximate location) · Cooling: Chilled water, dry coolersatNorth ICE03 Akureyri · atNorth · Akureyri (approximate location) · Cooling: Chilled water, dry coolersatNorth FIN05 Salo · atNorth · Salo (approximate location)atNorth NOR01 Haugaland · atNorth · Tysvær (approximate location)atNorth Ørslev (Vordingborg) · atNorth · Vordingborg (approximate location)atNorth DEN02 Varde mega site · atNorth · Ølgod (exact location) · Cooling: HybridatNorth ICE01 Reykjavik · atNorth · Reykjavik (exact location) · Cooling: Air or free cooling
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

atNorth data centers: key facts

About atNorth

atNorth is a Nordic high-density colocation and build-to-suit data center provider. At the close of its US$4 billion acquisition by CPP Investments and Equinix on 2 September 2026 it reported eight operational data centers and several projects under development across all five Nordic countries: Iceland, Sweden, Finland, Denmark and Norway. Its own site list names campuses in Reykjavik, Keflavik, Akureyri, Stockholm, Helsinki, Myllykoski, Salo, Copenhagen, Varde and Haugaland.

Founded
2009
Ownership
Private: CPP Investments c. 51%, Equinix c. 34%, Partners Group c. 10%, remainder held by atNorth internal stakeholders
Parent company
CPP Investments (Canada Pension Plan Investment Board), controlling stake
Tracked footprint
14 facilities in 5 countries
Website
atnorth.com

Data center business

  • In September 2026 Partners Group said atNorth has over 1.5 GW of secured power, with a considerable amount of planned additional future capacity.
  • In February 2026 atNorth described its portfolio as eight operational data centers plus several sites under development across Denmark, Finland, Iceland, Norway and Sweden, with 1 GW of secured power for further expansion. Several facilities are enabled for liquid cooling to support high-density workloads.
  • Crusoe is an anchor AI cloud customer at ICE02 in Iceland: the original December 2023 agreement covered 33 MW, and a 24 MW expansion announced in August 2025 takes Crusoe Cloud capacity at the campus to 57 MW, with NVIDIA GB200 NVL72 systems and direct liquid-to-chip cooling.
  • atNorth sells high-density colocation (racks, cages, pods and private data halls) and large build-to-suit data centers, aimed at enterprise, hyperscale, cloud, AI and high-performance computing customers. It says it has operated data centers in the Nordics for more than 15 years and has more than 100 customers.
  • The portfolio splits into metro sites and mega sites. Metro sites are ICE01 Reykjavik (3.2 MW, 2,700 sqm), SWE01 Stockholm, FIN01 and FIN02 Helsinki and DEN01 Copenhagen. Mega sites are ICE02 Keflavik (83 MW campus on 9 hectares), ICE03 Akureyri (50 MW on 4.3 hectares), FIN04 Myllykoski (430 MW on 65 hectares), FIN05 Salo, DEN02 Varde, SWE04 Sollefteå and NOR01 Haugaland.
  • Heat reuse is built into new sites: atNorth lists heat reuse collaborations with Kesko in Finland, Stockholm Exergi in Sweden, and Vestforbrænding and Selected Group in Denmark. At FIN04 excess heat is to be recycled through the KSS Energia heating plant in Kouvola.

Recent updates

  • 5 Oct 2026: atNorth announced FIN05 in Salo, Finland, on a 28.6-hectare site. Power for a first phase of 75 MW is secured, with a path to 230 MW; the site connects through a Fingrid substation. atNorth puts its investment at about EUR 2 billion, excluding customer servers.
  • 2 Sep 2026: CPP Investments and Equinix completed the US$4 billion acquisition of atNorth from Partners Group. CPP Investments holds c. 51%, Equinix c. 34% and Partners Group, which reinvested, c. 10%; a US$4.1 billion (EUR 3.6 billion) financing package supports the deal and expansion. atNorth keeps its own brand and operates independently.
  • 11 Aug 2026: Selected Group will use surplus heat from the DEN02 campus in Ølgod, Denmark, for a large greenhouse development next to the data center; the first phase is expected to be completed in Q3 2028.
  • 3 Jun 2026: atNorth entered Norway by acquiring a 36-hectare plot in Haugaland Business Park for NOR01, with initial phases of 120 MW rising to 350 MW. Power is projected for 2028, supported by new substations from Statnett and the regional grid company Fagne.
  • 23 Feb 2026: atNorth confirmed a 300 MW campus at Hamre Industrial Park in Långsele, Sollefteå Municipality, Sweden (SWE04), on a 50-hectare zoned plot, expected to be operational in H1 2028.
  • 29 Jan 2026: atNorth announced SWE02, a 30 MW heat-reuse-enabled metro site in Kista, Stockholm, near SWE01 (opened March 2022), scheduled to go live in Q4 2027; it said this brings its total number of Nordic data centers to eleven.

Company details checked against company and official sources, 9 Nov 2026.

  • Capacity under construction or planned (1,580 MW) is 7.2 times the operational base of 220 MW.
  • Its largest operational site is atNorth ICE02 Keflavik in Keflavik, Iceland at 83 MW.
  • The largest project in the pipeline is atNorth FIN04 Myllykoski (430 MW, under construction).
  • Finland accounts for 35% of tracked capacity (4 facilities).
  • By type, the tracker lists 10 colocation and 4 hyperscale facilities.
Capacity by status, MW
Operational220 MW
Under construction430 MW
Planned1,150 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Finland632 MW
Norway350 MW
Sweden342 MW
Denmark340 MW
Iceland136 MW

OperationalUnder construction or planned

Facilities by type
Colocation10
Hyperscale4

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

atNorth development pipeline

Under construction and planned facilities with a stated capacity, largest first. 430 MW under construction and 1,150 MW planned in total.

ProjectLocationStatusTypeCapacity
atNorth FIN04 MyllykoskiatNorth Kouvola, Finland Under construction Hyperscale 430 MW
atNorth NOR01 HaugalandatNorth Tysvær, Norway Planned Hyperscale 350 MW
atNorth SWE04 Sollefteå (Hamre Industrial Park)atNorth Långsele, Sweden Planned Hyperscale 300 MW
atNorth DEN02 Varde mega siteatNorth Ølgod, Denmark Planned Colocation 250 MW
atNorth FIN05 SaloatNorth Salo, Finland Planned Hyperscale 160 MW
atNorth Ørslev (Vordingborg)atNorth Vordingborg, Denmark Planned Colocation 60 MW
atNorth SWE02 StockholmatNorth Kista, Sweden Planned Colocation 30 MW

Facilities

14 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
atNorth FIN04 MyllykoskiHyperscale Kouvola, Finland Under construction 430 MW total — Operator / official
atNorth NOR01 HaugalandHyperscale
History · 1 deal
  1. Announced
  2. Planned
Tysvær, Norway Planned 350 MW total — Operator / official
atNorth SWE04 Sollefteå (Hamre Industrial Park)Hyperscale Långsele, Sweden Planned 300 MW total — Operator / official
atNorth DEN02 Varde mega siteColocation Cooling: Hybrid
History
  1. Planned
  2. Planned
Ølgod, Denmark Planned 250 MW total — Operator / official
atNorth FIN05 SaloHyperscale
History · 1 deal
  1. Announced
  2. Planned
Salo, Finland Planned 160 MW IT — Operator / official
atNorth ICE02 KeflavikColocation Cooling: Chilled water, dry coolers
History
  1. Operational
  2. Operational
Keflavik, Iceland Operational 83 MW total — Operator / official
atNorth Ørslev (Vordingborg)Colocation
History
  1. Planned
  2. Planned
Vordingborg, Denmark Planned 60 MW — Operator / official
atNorth ICE03 AkureyriColocation Cooling: Chilled water, dry coolers Akureyri, Iceland Operational 50 MW total — Operator / official
atNorth FIN02Colocation Cooling: Hybrid Espoo, Finland Operational 40 MW total — Operator / official
atNorth DEN01Colocation Cooling: Direct liquid Ballerup, Denmark Operational 30 MW total 2025 Operator / official
atNorth SWE02 StockholmColocation Kista, Sweden Planned 30 MW total — Operator / official
atNorth SWE01 StockholmColocation Cooling: Hybrid Kista, Sweden Operational 12 MW total — Operator / official
atNorth ICE01 ReykjavikColocation Cooling: Air or free cooling Reykjavik, Iceland Operational 3.2 MW total — Operator / official
atNorth FIN01Colocation Helsinki, Finland Operational 1.6 MW total — Operator / official

Market position

How atNorth compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Finland, atNorth ranks #1 of 24 tracked operators by capacity, with 22% of the country’s tracked MW.
  • Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
  • Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
  • In Iceland, atNorth ranks #2 of 3 tracked operators by capacity, with 48% of the country’s tracked MW.
  • In Denmark, atNorth ranks #2 of 16 tracked operators by capacity, with 32% of the country’s tracked MW.
  • Our Deal Tracker lists 2 deal(s) naming atNorth, the latest on 5 October 2026.

Data center operators in Finland

Tracked facilities4824 operators
Operational capacity230 MW2,661 MW in the pipeline
atNorth rank by capacity#1of 24 operators · 22%
Industrial power price58.4 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
DayOne1—560 MW
Nebius275 MW310 MW
FCDC Corp1—250 MW
AmpTank1—200 MW
Compute Nordic1—165 MW
Verne270 MW70 MW
Pure DC1—110 MW
HyperCo3—100 MW

All data centers in Finland Power and policy in Finland

Data center operators in Iceland

Tracked facilities73 operators
Operational capacity286 MW— in the pipeline
atNorth rank by capacity#2of 3 operators · 48%
Industrial power price42.9 USD/MWh2022
OperatorFacilitiesOperational MWPipeline MW
Verne1140 MW—
Borealis Data Center310 MW—

All data centers in Iceland Power and policy in Iceland

Data center operators in Denmark

Tracked facilities3616 operators
Operational capacity54.6 MW1,004 MW in the pipeline
atNorth rank by capacity#2of 16 operators · 32%
Industrial power price134 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
GARBE Data Centers1—350 MW
Prime Data Centers1—160 MW
CA Group1—100 MW
STACK Infrastructure1—72 MW
Digital Realty423 MW—
Thylander1—11.5 MW
Penta Infra11.6 MW—
Microsoft6——

All data centers in Denmark Power and policy in Denmark

Deals naming atNorth

  • atNorth → FIN05, 28.6ha site, Salo (75MW phase 1; up to 230MW) Land / campus $2.24B
  • CPP Investments (c.51%) and Equinix (c.34%), with Partners Group reinvesting (c.10%) → atNorth (Nordic data center developer and operator) M&A $4.00B

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does atNorth operate?

DC Market Insights tracks 14 atNorth data center(s) in 5 countries as of November 2026: 7 operational, 1 under construction and 6 planned.

Which other companies operate data centers in Finland?

Besides atNorth, the largest operators we track in Finland by capacity are DayOne, Nebius, FCDC Corp, AmpTank and Compute Nordic. The Finland page lists all 24 operators.

What rules apply to data centers in Finland?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst