In short

As of 25 November 2026, DC Market Insights tracks 22 data centers in Norway run by 8 operators: 15 operational, 2 under construction and 5 planned. Stated operational capacity is 446 MW, with a further 310 MW under construction and 510 MW planned. Green Mountain holds the largest share of tracked operational capacity (67%).

22Facilities tracked
8Operators
446 MWOperational (15 sites)
310 MWUnder construction (2 sites)
510 MWPlanned (5 sites)

MW = IT capacity where the source states it, otherwise total capacity. 20 of 22 facilities have a stated capacity; the others are counted as sites only.

atNorth NOR01 Haugaland · atNorth · Tysvær (approximate location)Green Mountain OSL-Hamar · Green Mountain · Hamar (approximate location)Bulk OS-IX Oslo · Bulk Infrastructure · Oslo (approximate location)Bulk N01 Campus Kristiansand · Bulk Infrastructure · Kristiansand (approximate location)Lefdal Mine Datacenter (Nordfjord) · Lefdal Mine Datacenter · Måløy (approximate location)Lefdal Mine Datacenter Sunnfjord (LMD2) · Lefdal Mine Datacenter · Førde (approximate location)STACK OSL03A Fetsund · STACK Infrastructure · Fetsund (approximate location)STACK OSL03B Fetsund · STACK Infrastructure · Fetsund (approximate location)STACK OSL03C Fetsund · STACK Infrastructure · Fetsund (approximate location)STACK OSL03D Fetsund · STACK Infrastructure · Fetsund (approximate location)Polar HER01 Herøya · Polar Data Centers · Porsgrunn (approximate location)Nscale Narvik campus (Kvandal) · Nscale · Narvik (approximate location) · Cooling: Direct liquidGoogle Skien · Google · Skien (exact location)Green Mountain SVG-Rennesøy · Green Mountain · Stavanger (exact location)Green Mountain TEL-Rjukan · Green Mountain · Rjukan (exact location)Green Mountain OSL-Enebakk · Green Mountain · Enebakk (exact location)Green Mountain SVG-Undheim · Green Mountain · Time (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Norway data center market: key facts

  • Capacity under construction or planned (820 MW) is 1.8 times the operational base of 446 MW.
  • The three largest operators by operational capacity, Green Mountain, Lefdal Mine Datacenter and STACK Infrastructure, hold 94% of tracked operational MW.
  • atNorth has the largest development pipeline in Norway: 350 MW under construction or planned.
  • The largest operational facility we track is Green Mountain OSL-Hamar (Green Mountain, Hamar) at 150 MW.
  • The largest project in the pipeline is atNorth NOR01 Haugaland (350 MW, planned).
  • Haugesund is the largest cluster: 1 of 22 facilities and 28% of tracked capacity.
  • By type, the tracker lists 16 colocation and 6 hyperscale facilities.
  • 3 facilities publish a PUE figure; the lowest is 1.18 at Green Mountain SVG-Rennesøy (Green Mountain) and the median is 1.20.
  • 20 of 22 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational446 MW
Under construction310 MW
Planned510 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
25'1364'14'15'16'17'18'1975'20'21'22150'23

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in Norway by tracked capacity, MW
atNorth350 MW
Nscale230 MW

OperationalUnder construction or planned

Capacity by market in Norway, MW
Haugesund350 MW
Narvik230 MW
Hamar150 MW
Telemark142 MW
Oslo129 MW
Stavanger105 MW
Nordfjord80 MW
Sunnfjord80 MW

OperationalUnder construction or planned

Facilities by type
Colocation16
Hyperscale6

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Norway

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
STACK Infrastructure740 MW—9%
Green Mountain5300 MW80 MW67%
Polar Data Centers312 MW80 MW2.7%
Lefdal Mine Datacenter280 MW80 MW18%
Bulk Infrastructure214 MW—3.1%
Google1———
atNorth1—350 MW—
Nscale1—230 MW—

Largest data center projects in Norway

Under construction and planned facilities with a stated capacity, largest first. 310 MW under construction and 510 MW planned in total.

ProjectLocationStatusTypeCapacity
atNorth NOR01 HaugalandatNorth Tysvær Planned Hyperscale 350 MW
Nscale Narvik campus (Kvandal)Nscale Narvik Under construction Hyperscale 230 MW
Green Mountain SVG-UndheimGreen Mountain Time Under construction Hyperscale 80 MW
Lefdal Mine Datacenter Sunnfjord (LMD2)Lefdal Mine Datacenter Førde Planned Colocation 80 MW
Polar DRA02 TørdalPolar Data Centers Tørdal Planned Colocation 40 MW
Polar HER01 HerøyaPolar Data Centers Porsgrunn Planned Colocation 40 MW

How Norway compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom205541,064 MW7,741 MW
Germany20063933 MW4,386 MW
France10620338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland421653 MW1,278 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Italy189245 MW693 MW
Netherlands11034217 MW449 MW
Iceland73286 MW—

Data center deals in Norway

Our Deal Tracker lists 15 deals in Norway since January 2026, with $1.93B in disclosed value.

  • Crusoe → DRA02, 40 MW critical liquid-cooled IT capacity, Polar Tørdal campus, Drangedal (go-live late 2027) JV / partnership · 40 MW
  • Magnora Data Center ASA (75%); Blix Group AS (25%) → Operating data center in Oslo, ~1,400 sqm, up to 2 MW IT load M&A · 2 MW
  • Lefdal Mine Datacenter → Titan Group AS and its data center site in Moskog, Sunnfjord Land / campus
  • Bond investors (unnamed) → Asp Data Center K11 data center, Stavanger (incl. refinancing of NOK 685m bond) Financing $169.6M
  • Exascale Labs; EnergyBank → Pilot AI data center powered by Zephyros-One floating wind turbine off Norway JV / partnership · 0.8 MW
  • T1 Energy → Giga Arctic site conversion to 50MW data center, Mo i Rana Land / campus · 50 MW

All Norway deals in the Deal Tracker

Facilities

22 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
atNorth NOR01 HaugalandatNorth
History · 1 deal
  1. Announced
  2. Planned
Tysvær Planned 350 MW total — Operator / official
Nscale Narvik campus (Kvandal)Nscale Cooling: Direct liquid
History
  1. Announced
  2. Under construction
  3. Under construction
Narvik Under construction 230 MW — Operator / official
Green Mountain OSL-HamarGreen Mountain Hamar Operational 150 MW IT 2023 Operator / official
Green Mountain SVG-UndheimGreen Mountain Time Under construction 80 MW IT — Operator / official
Lefdal Mine Datacenter (Nordfjord)Lefdal Mine Datacenter Måløy Operational 80 MW — Operator / official
Lefdal Mine Datacenter Sunnfjord (LMD2)Lefdal Mine Datacenter
History
  1. Announced
  2. Planned
Førde Planned 80 MW — Operator / official
Green Mountain OSL-EnebakkGreen Mountain Enebakk Operational 75 MW IT 2020 Operator / official
Green Mountain TEL-RjukanGreen Mountain Rjukan Operational 50 MW IT 2014 Operator / official
Polar DRA02 TørdalPolar Data Centers
History
  1. Announced
  2. Planned
Tørdal Planned 40 MW IT — Operator / official
Polar HER01 HerøyaPolar Data Centers
History
  1. Announced
  2. Planned
Porsgrunn Planned 40 MW — Operator / official
Green Mountain SVG-RennesøyGreen Mountain Stavanger Operational 25 MW IT 2013 Operator / official
Bulk OS-IX OsloBulk Infrastructure Oslo Operational 14 MW 2014 Operator / official
Polar DRA01 TørdalPolar Data Centers Tørdal Operational 12 MW IT — Operator / official
STACK OSL03A FetsundSTACK Infrastructure Fetsund Operational 10 MW — Operator / official
STACK OSL03D FetsundSTACK Infrastructure Fetsund Operational 6 MW — Operator / official
STACK OSL04A HoltskogenSTACK Infrastructure Holtskogen Operational 6 MW — Operator / official
STACK OSL04C HoltskogenSTACK Infrastructure Holtskogen Operational 6 MW — Operator / official
STACK OSL04E HoltskogenSTACK Infrastructure Holtskogen Operational 6 MW — Operator / official
STACK OSL03B FetsundSTACK Infrastructure Fetsund Operational 3 MW — Operator / official
STACK OSL03C FetsundSTACK Infrastructure Fetsund Operational 3 MW — Operator / official
Bulk N01 Campus KristiansandBulk Infrastructure Kristiansand Operational — — Operator / official
Google SkienGoogle Skien Planned — — Operator / official

Get the data

Every data center in Norway, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,360 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Norway

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Norway

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Norway?

DC Market Insights tracks 22 data centers in Norway as of November 2026: 15 operational, 2 under construction and 5 planned, run by 8 operators. The count grows as we verify more sites.

What is the data center capacity of Norway?

Tracked operational capacity in Norway is 446 MW, with 310 MW under construction and 510 MW planned. These totals use the capacity each source states (IT load where given) and cover 20 of 22 tracked facilities.

Which companies operate the most data center capacity in Norway?

By tracked operational capacity, the largest operators in Norway are Green Mountain (300 MW), Lefdal Mine Datacenter (80 MW) and STACK Infrastructure (40 MW).

Where are the data centers in Norway located?

The largest clusters by tracked capacity are Haugesund (1 facilities), Narvik (1 facilities) and Hamar (1 facilities). The map above shows every site.

Which new data centers are being built in Norway?

We track 310 MW under construction and 510 MW planned. The largest projects are atNorth NOR01 Haugaland (350 MW), Nscale Narvik campus (Kvandal) (230 MW) and Green Mountain SVG-Undheim (80 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Norway have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Norway capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy