STACK Infrastructure Data Centers

Data centers operated by STACK Infrastructure that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 October 2026, DC Market Insights tracks 26 data centers operated by STACK Infrastructure in 7 countries, of which 13 are operational. Stated operational capacity is 590 MW, with a further 1,342 MW under construction and 894 MW planned. The pipeline is 3.8 times the capacity already operating.

26Facilities tracked
7Countries
590 MWOperational (13 sites)
1,342 MWUnder construction (5 sites)
894 MWPlanned (8 sites)

MW = IT capacity where the source states it, otherwise total capacity. 19 of 26 facilities have a stated capacity; the others are counted as sites only.

Johor Bahru campus · STACK Infrastructure · Iskandar Puteri (approximate location)FRA01 · STACK Infrastructure · Liederbach (approximate location)STACK NVA01 Sterling (NVA01A) · STACK Infrastructure · Sterling (approximate location)STACK NVA05 Manassas · STACK Infrastructure · Manassas (approximate location)STACK Stafford Technology Campus (STC) · STACK Infrastructure · Stafford (approximate location)STACK NAL01 New Albany · STACK Infrastructure · New Albany (approximate location)STACK DFW01 Plano · STACK Infrastructure · Plano (approximate location)STACK DFW02 Lancaster · STACK Infrastructure · Lancaster (approximate location)STACK PHX01 Avondale · STACK Infrastructure · Avondale (approximate location)STACK PHX02 Central Phoenix · STACK Infrastructure · Phoenix (approximate location)STACK Infrastructure SVY02 Santa Clara · STACK Infrastructure · Santa Clara (approximate location)STACK Infrastructure SVY01 San Jose · STACK Infrastructure · San Jose (approximate location)STACK Infrastructure SVY01 campus expansion San Jose · STACK Infrastructure · San Jose (approximate location)STACK Infrastructure POR01 Hillsboro · STACK Infrastructure · Hillsboro (approximate location)STACK Infrastructure POR02 Hillsboro · STACK Infrastructure · Hillsboro (approximate location)ATL02 – Lithia Springs · STACK Infrastructure · Lithia Springs (approximate location)ATL01 – Alpharetta · STACK Infrastructure · Alpharetta (approximate location)STACK CHI01 · STACK Infrastructure · Elk Grove Village (approximate location)STACK CHI02 · STACK Infrastructure · Elk Grove Village (approximate location)STACK STO01 Upplands Väsby · STACK Infrastructure · Upplands Väsby (approximate location)STACK TOR01 Toronto (Scarborough) · STACK Infrastructure · Toronto (approximate location)STACK TKY01 Inzai · STACK Infrastructure · Inzai (approximate location)STACK COP02 Copenhagen · STACK Infrastructure · Copenhagen (approximate location)STACK Infrastructure POR03 Hillsboro · STACK Infrastructure · Hillsboro (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

STACK Infrastructure data centers: key facts

About STACK Infrastructure

STACK Infrastructure designs, develops and operates data center campuses for hyperscale and large enterprise customers. Its locations page (October 2026) lists 22 markets across the Americas, Asia Pacific and EMEA and states 8.5+ GW built and under development, plus 7.5+ GW planned and potential development. In the United States it reports more than 90 data centers in operation, under construction and under development (August 2026).

Headquarters
Denver, United States
Ownership
Private; sponsored by IPI Partners (per the January 2019 platform launch release)
Parent company
IPI Partners (sponsor)
Tracked footprint
26 facilities in 7 countries
Website
stackinfra.com

Data center business

  • In Asia Pacific, STACK delivered the first building of its 36 MW, two-building Inzai campus near Tokyo in October 2024, and announced a 220 MW campus in Iskandar Puteri, Johor Bahru, with initial delivery scheduled for Q4 2026. Its Melbourne market page shows 432 MW across two campuses, including MEL02 in Truganina with 250 MW of critical capacity.
  • STACK was launched as a national platform in January 2019, combining data center assets under one brand; the release says STACK is sponsored by IPI Partners, an investor in data centers and other technology and connectivity-related real assets.
  • STACK's locations page lists 22 markets: ten in the Americas (Atlanta, Calgary, Chicago, Dallas-Fort Worth, New Albany, Northern Virginia, Phoenix, Portland, Silicon Valley, Toronto), five in Asia Pacific (Johor Bahru, Melbourne, Osaka, Sydney, Tokyo) and seven in EMEA (Copenhagen, Frankfurt, Geneva, Milan, Oslo, Stockholm, Zurich). The same page shows 8.5+ GW built and under development and 7.5+ GW of planned and potential development.
  • Northern Virginia is STACK's largest market: the market page shows 2,400 MW on 960 acres, with campuses in Sterling (NVA01, NVA04), Manassas (NVA02 with 420 MW of scalability, NVA05), Leesburg (NVA06), Arcola (Loudoun County) and the Stafford Technology Campus, which the company says offers 1.1 GW of capacity.
  • Other US markets on the company's pages: Phoenix 500 MW across PHX01 Avondale (225 MW of critical capacity) and PHX02 Central Phoenix (250 MW); Dallas-Fort Worth 580 MW across DFW01 Plano (80 MW, two operational data centers) and DFW02 Lancaster; Atlanta 180 MW (ATL02 Lithia Springs is a 160 MW campus); Portland 250 MW across three Hillsboro campuses; Silicon Valley 150 MW; Chicago 40 MW (CHI01, Elk Grove Village); New Albany 60 MW.
  • In EMEA the company's pages show Milan with 399 MW across 11 campuses, Zurich 76 MW across three campuses, Copenhagen 72 MW (COP02, planned as two buildings), Geneva 42 MW, Oslo 40 MW, Stockholm 18 MW (STO01) and the FRA01 campus in Frankfurt.

Recent updates

  • STACK said it has more than 90 data centers in operation, under construction and under development in the United States, and that its Plano campus has served Texas since 2012.
  • STACK said its northwest Louisiana campuses are under construction and committed $100,000 to the Amazon Northwest Louisiana Community Fund, adding to Amazon's initial $250,000.
  • STACK appointed Bobby Hollis, previously Vice President of Energy at Microsoft, as Chief Development Officer of STACK Americas, responsible for development, site selection, preconstruction and power strategy including grid interconnection.
  • STACK Americas named Mike Casey Chief Operating Officer, Kevin Hughes Chief External Affairs Officer (a new role) and Addam Friedl Chief Technology Officer; Matt VanderZanden is CEO of STACK Americas.
  • STACK announced a multi-campus data center development across Caddo and Bossier Parishes in northwest Louisiana, with about $12 billion in anticipated capital investment, more than 1,500 construction jobs and more than 540 permanent jobs once operational.

Company details checked against company and official sources, 18 Oct 2026.

  • Capacity under construction or planned (2,236 MW) is 3.8 times the operational base of 590 MW.
  • Its largest operational site is ATL02 – Lithia Springs in Lithia Springs, United States at 160 MW.
  • The largest project in the pipeline is STACK Stafford Technology Campus (STC) (1,100 MW, under construction).
  • United States accounts for 82% of tracked capacity (20 facilities).
  • By type, the tracker lists 16 hyperscale and 10 colocation facilities.
  • 19 of 26 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational590 MW
Under construction1,342 MW
Planned894 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
80≤2012'13'14'15'16'17'18'19'2048'21'22'2336'24

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Capacity by country, MW
Malaysia220 MW
Germany96 MW
Denmark72 MW
Canada56 MW
Japan36 MW
Sweden18 MW

OperationalUnder construction or planned

Facilities by type
Hyperscale16
Colocation10

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

STACK Infrastructure development pipeline

Under construction and planned facilities with a stated capacity, largest first. 1,342 MW under construction and 894 MW planned in total.

ProjectLocationStatusTypeCapacity
STACK Stafford Technology Campus (STC)STACK Infrastructure Stafford, United States Under construction Hyperscale 1,100 MW
STACK PHX02 Central PhoenixSTACK Infrastructure Phoenix, United States Planned Hyperscale 250 MW
STACK PHX01 AvondaleSTACK Infrastructure Avondale, United States Under construction Hyperscale 225 MW
Johor Bahru campusSTACK Infrastructure Iskandar Puteri, Malaysia Planned Hyperscale 220 MW
STACK DFW02 LancasterSTACK Infrastructure Lancaster, United States Planned Hyperscale 220 MW
FRA01STACK Infrastructure Liederbach, Germany Planned Hyperscale 96 MW
STACK COP02 CopenhagenSTACK Infrastructure Copenhagen, Denmark Planned Hyperscale 72 MW
STACK CHI02STACK Infrastructure Elk Grove Village, United States Planned Hyperscale 36 MW
STACK NVA01 Sterling (NVA01A)STACK Infrastructure Sterling, United States Under construction Hyperscale 17 MW

Facilities

26 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
STACK Stafford Technology Campus (STC)Hyperscale Stafford, United States Under construction 1,100 MW total — Operator / official
STACK PHX02 Central PhoenixHyperscale Phoenix, United States Planned 250 MW total — Operator / official
STACK PHX01 AvondaleHyperscale Avondale, United States Under construction 225 MW IT — Operator / official
Johor Bahru campusHyperscale Iskandar Puteri, Malaysia Planned 220 MW — Operator / official
STACK DFW02 LancasterHyperscale
History
  1. Announced
  2. Planned
Lancaster, United States Planned 220 MW total — Operator / official
ATL02 – Lithia SpringsHyperscale Lithia Springs, United States Operational 160 MW total — Operator / official
FRA01Hyperscale Liederbach, Germany Planned 96 MW IT — Operator / official
STACK DFW01 PlanoColocation Plano, United States Operational 80 MW total 2012 Operator / official
STACK COP02 CopenhagenHyperscale Copenhagen, Denmark Planned 72 MW IT — Operator / official
STACK Infrastructure POR03 HillsboroColocation Hillsboro, United States Operational 72 MW IT — Operator / official
STACK NAL01 New AlbanyColocation
History
  1. Operational
  2. Operational
New Albany, United States Operational 60 MW IT — Operator / official
STACK TOR01 Toronto (Scarborough)Colocation Toronto, Canada Operational 56 MW IT — Operator / official
STACK Infrastructure SVY02 Santa ClaraColocation Santa Clara, United States Operational 48 MW total 2021 Operator / official
STACK CHI01Colocation Elk Grove Village, United States Operational 40 MW total — Operator / official
STACK CHI02Hyperscale
History
  1. Announced
  2. Announced
  3. Planned
Elk Grove Village, United States Planned 36 MW IT — Operator / official
STACK TKY01 InzaiHyperscale Inzai, Japan Operational 36 MW total 2024 Operator / official
ATL01 – AlpharettaColocation Alpharetta, United States Operational 20 MW IT — Operator / official
STACK STO01 Upplands VäsbyColocation Upplands Väsby, Sweden Operational 18 MW total — Operator / official
STACK NVA01 Sterling (NVA01A)Hyperscale Sterling, United States Under construction 17 MW IT — Operator / official
Project Jupiter Santa TeresaHyperscale Joint venture: STACK Infrastructure with BorderPlex Digital Santa Teresa, United States Under construction — — Trade press
STACK Infrastructure POR01 HillsboroColocation Hillsboro, United States Operational — — Operator / official
STACK Infrastructure POR02 HillsboroColocation Hillsboro, United States Operational — — Operator / official
STACK Infrastructure SVY01 campus expansion San JoseHyperscale San Jose, United States Under construction — — Operator / official
STACK Infrastructure SVY01 San JoseHyperscale San Jose, United States Operational — — Trade press
STACK Loudoun County Campus (Arcola)Hyperscale Arcola, United States Planned — — Operator / official
STACK NVA05 ManassasHyperscale Manassas, United States Planned — — Operator / official

Market position

How STACK Infrastructure compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, STACK Infrastructure ranks #8 of 171 tracked operators by capacity, with 3% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Canada, STACK Infrastructure ranks #9 of 18 tracked operators by capacity, with 0.5% of the country’s tracked MW.
  • In Japan, STACK Infrastructure ranks #12 of 20 tracked operators by capacity, with 2% of the country’s tracked MW.
  • Hillsboro also hosts 10 other tracked data center(s), run by QTS, Aligned Data Centers, Flexential and NTT DATA.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
STACK Infrastructure rank by capacity#8of 171 operators · 3%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
QTS471,977 MW283 MW

All data centers in United States Power and policy in United States

Data center operators in Canada

Tracked facilities7818 operators
Operational capacity495 MW9,870 MW in the pipeline
STACK Infrastructure rank by capacity#9of 18 operators · 0.5%
Renewable share of generation63.9%2024
OperatorFacilitiesOperational MWPipeline MW
O'Leary Ventures1—7,500 MW
Meta1—1,000 MW
Beacon AI Centers1—920 MW
Bell Canada2—300 MW
eStruxture16148 MW90 MW
Vantage Data Centers4127 MW—
Cologix2386.4 MW—
QScale2—60 MW

All data centers in Canada Power and policy in Canada

Data center operators in Japan

Tracked facilities7420 operators
Operational capacity697 MW1,059 MW in the pipeline
STACK Infrastructure rank by capacity#12of 20 operators · 2%
Renewable share of generation23.1%2024
OperatorFacilitiesOperational MWPipeline MW
AirTrunk4410 MW120 MW
Colt DCS9101 MW262 MW
EdgeConneX1—200 MW
NTT DATA330 MW136 MW
CloudHQ1—96.4 MW
ST Telemedia Global Data Centres1—70.8 MW
Vantage Data Centers1—68 MW
Equinix1854 MW—

All data centers in Japan Power and policy in Japan

Other data centers in Hillsboro

  • QTS Hillsboro 2 · QTS · Operational · 180 MW
  • QTS Hillsboro 3 · QTS · Planned · 100 MW
  • Aligned PDX-01 Hillsboro · Aligned Data Centers · Under construction · 72 MW
  • Flexential Portland – Hillsboro 3 · Flexential · Operational · 36 MW
  • Flexential Portland – Hillsboro 5 · Flexential · Operational · 36 MW
  • NTT DATA Hillsboro HI1 · NTT DATA · Operational · 36 MW
  • Flexential Portland – Hillsboro 6 · Flexential · Operational · 27 MW
  • QTS Hillsboro 1 DC1 · QTS · Operational · 20 MW
  • Flexential Portland – Hillsboro 2 · Flexential · Operational · 18 MW
  • Flexential Portland – Hillsboro 4 · Flexential · Operational · 18 MW

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does STACK Infrastructure operate?

DC Market Insights tracks 26 STACK Infrastructure data center(s) in 7 countries as of October 2026: 13 operational, 5 under construction and 8 planned.

Where is STACK Infrastructure headquartered?

STACK Infrastructure is headquartered in Denver, United States. Ownership: Private; sponsored by IPI Partners (per the January 2019 platform launch release).

Which other companies operate data centers in United States?

Besides STACK Infrastructure, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Hillsboro?

Other tracked data centers in Hillsboro include QTS Hillsboro 2 (QTS), QTS Hillsboro 3 (QTS), Aligned PDX-01 Hillsboro (Aligned Data Centers) and Flexential Portland – Hillsboro 3 (Flexential).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst