STACK Infrastructure Data Centers
Data centers operated by STACK Infrastructure that we have verified: location, status and capacity, each checked against its source.
In short
As of 18 October 2026, DC Market Insights tracks 26 data centers operated by STACK Infrastructure in 7 countries, of which 13 are operational. Stated operational capacity is 590 MW, with a further 1,342 MW under construction and 894 MW planned. The pipeline is 3.8 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 19 of 26 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
STACK Infrastructure data centers: key facts
About STACK Infrastructure
STACK Infrastructure designs, develops and operates data center campuses for hyperscale and large enterprise customers. Its locations page (October 2026) lists 22 markets across the Americas, Asia Pacific and EMEA and states 8.5+ GW built and under development, plus 7.5+ GW planned and potential development. In the United States it reports more than 90 data centers in operation, under construction and under development (August 2026).
- Headquarters
- Denver, United States
- Ownership
- Private; sponsored by IPI Partners (per the January 2019 platform launch release)
- Parent company
- IPI Partners (sponsor)
- Tracked footprint
- 26 facilities in 7 countries
- Website
- stackinfra.com
Data center business
- In Asia Pacific, STACK delivered the first building of its 36 MW, two-building Inzai campus near Tokyo in October 2024, and announced a 220 MW campus in Iskandar Puteri, Johor Bahru, with initial delivery scheduled for Q4 2026. Its Melbourne market page shows 432 MW across two campuses, including MEL02 in Truganina with 250 MW of critical capacity.
- STACK was launched as a national platform in January 2019, combining data center assets under one brand; the release says STACK is sponsored by IPI Partners, an investor in data centers and other technology and connectivity-related real assets.
- STACK's locations page lists 22 markets: ten in the Americas (Atlanta, Calgary, Chicago, Dallas-Fort Worth, New Albany, Northern Virginia, Phoenix, Portland, Silicon Valley, Toronto), five in Asia Pacific (Johor Bahru, Melbourne, Osaka, Sydney, Tokyo) and seven in EMEA (Copenhagen, Frankfurt, Geneva, Milan, Oslo, Stockholm, Zurich). The same page shows 8.5+ GW built and under development and 7.5+ GW of planned and potential development.
- Northern Virginia is STACK's largest market: the market page shows 2,400 MW on 960 acres, with campuses in Sterling (NVA01, NVA04), Manassas (NVA02 with 420 MW of scalability, NVA05), Leesburg (NVA06), Arcola (Loudoun County) and the Stafford Technology Campus, which the company says offers 1.1 GW of capacity.
- Other US markets on the company's pages: Phoenix 500 MW across PHX01 Avondale (225 MW of critical capacity) and PHX02 Central Phoenix (250 MW); Dallas-Fort Worth 580 MW across DFW01 Plano (80 MW, two operational data centers) and DFW02 Lancaster; Atlanta 180 MW (ATL02 Lithia Springs is a 160 MW campus); Portland 250 MW across three Hillsboro campuses; Silicon Valley 150 MW; Chicago 40 MW (CHI01, Elk Grove Village); New Albany 60 MW.
- In EMEA the company's pages show Milan with 399 MW across 11 campuses, Zurich 76 MW across three campuses, Copenhagen 72 MW (COP02, planned as two buildings), Geneva 42 MW, Oslo 40 MW, Stockholm 18 MW (STO01) and the FRA01 campus in Frankfurt.
Recent updates
- STACK said it has more than 90 data centers in operation, under construction and under development in the United States, and that its Plano campus has served Texas since 2012.
- STACK said its northwest Louisiana campuses are under construction and committed $100,000 to the Amazon Northwest Louisiana Community Fund, adding to Amazon's initial $250,000.
- STACK appointed Bobby Hollis, previously Vice President of Energy at Microsoft, as Chief Development Officer of STACK Americas, responsible for development, site selection, preconstruction and power strategy including grid interconnection.
- STACK Americas named Mike Casey Chief Operating Officer, Kevin Hughes Chief External Affairs Officer (a new role) and Addam Friedl Chief Technology Officer; Matt VanderZanden is CEO of STACK Americas.
- STACK announced a multi-campus data center development across Caddo and Bossier Parishes in northwest Louisiana, with about $12 billion in anticipated capital investment, more than 1,500 construction jobs and more than 540 permanent jobs once operational.
Company details checked against company and official sources, 18 Oct 2026.
- Capacity under construction or planned (2,236 MW) is 3.8 times the operational base of 590 MW.
- Its largest operational site is ATL02 – Lithia Springs in Lithia Springs, United States at 160 MW.
- The largest project in the pipeline is STACK Stafford Technology Campus (STC) (1,100 MW, under construction).
- United States accounts for 82% of tracked capacity (20 facilities).
- By type, the tracker lists 16 hyperscale and 10 colocation facilities.
- 19 of 26 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned Facilities with a stated year and capacity only.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
STACK Infrastructure development pipeline
Under construction and planned facilities with a stated capacity, largest first. 1,342 MW under construction and 894 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| STACK Stafford Technology Campus (STC)STACK Infrastructure | Stafford, United States | Under construction | Hyperscale | 1,100 MW |
| STACK PHX02 Central PhoenixSTACK Infrastructure | Phoenix, United States | Planned | Hyperscale | 250 MW |
| STACK PHX01 AvondaleSTACK Infrastructure | Avondale, United States | Under construction | Hyperscale | 225 MW |
| Johor Bahru campusSTACK Infrastructure | Iskandar Puteri, Malaysia | Planned | Hyperscale | 220 MW |
| STACK DFW02 LancasterSTACK Infrastructure | Lancaster, United States | Planned | Hyperscale | 220 MW |
| FRA01STACK Infrastructure | Liederbach, Germany | Planned | Hyperscale | 96 MW |
| STACK COP02 CopenhagenSTACK Infrastructure | Copenhagen, Denmark | Planned | Hyperscale | 72 MW |
| STACK CHI02STACK Infrastructure | Elk Grove Village, United States | Planned | Hyperscale | 36 MW |
| STACK NVA01 Sterling (NVA01A)STACK Infrastructure | Sterling, United States | Under construction | Hyperscale | 17 MW |
Facilities
26 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| STACK Stafford Technology Campus (STC)Hyperscale | Stafford, United States | Under construction | 1,100 MW total | — | Operator / official |
| STACK PHX02 Central PhoenixHyperscale | Phoenix, United States | Planned | 250 MW total | — | Operator / official |
| STACK PHX01 AvondaleHyperscale | Avondale, United States | Under construction | 225 MW IT | — | Operator / official |
| Johor Bahru campusHyperscale | Iskandar Puteri, Malaysia | Planned | 220 MW | — | Operator / official |
STACK DFW02 LancasterHyperscale
History
|
Lancaster, United States | Planned | 220 MW total | — | Operator / official |
| ATL02 – Lithia SpringsHyperscale | Lithia Springs, United States | Operational | 160 MW total | — | Operator / official |
| FRA01Hyperscale | Liederbach, Germany | Planned | 96 MW IT | — | Operator / official |
| STACK DFW01 PlanoColocation | Plano, United States | Operational | 80 MW total | 2012 | Operator / official |
| STACK COP02 CopenhagenHyperscale | Copenhagen, Denmark | Planned | 72 MW IT | — | Operator / official |
| STACK Infrastructure POR03 HillsboroColocation | Hillsboro, United States | Operational | 72 MW IT | — | Operator / official |
STACK NAL01 New AlbanyColocation
History
|
New Albany, United States | Operational | 60 MW IT | — | Operator / official |
| STACK TOR01 Toronto (Scarborough)Colocation | Toronto, Canada | Operational | 56 MW IT | — | Operator / official |
| STACK Infrastructure SVY02 Santa ClaraColocation | Santa Clara, United States | Operational | 48 MW total | 2021 | Operator / official |
| STACK CHI01Colocation | Elk Grove Village, United States | Operational | 40 MW total | — | Operator / official |
STACK CHI02Hyperscale
History
|
Elk Grove Village, United States | Planned | 36 MW IT | — | Operator / official |
| STACK TKY01 InzaiHyperscale | Inzai, Japan | Operational | 36 MW total | 2024 | Operator / official |
| ATL01 – AlpharettaColocation | Alpharetta, United States | Operational | 20 MW IT | — | Operator / official |
| STACK STO01 Upplands VäsbyColocation | Upplands Väsby, Sweden | Operational | 18 MW total | — | Operator / official |
| STACK NVA01 Sterling (NVA01A)Hyperscale | Sterling, United States | Under construction | 17 MW IT | — | Operator / official |
| Project Jupiter Santa TeresaHyperscale Joint venture: STACK Infrastructure with BorderPlex Digital | Santa Teresa, United States | Under construction | — | — | Trade press |
| STACK Infrastructure POR01 HillsboroColocation | Hillsboro, United States | Operational | — | — | Operator / official |
| STACK Infrastructure POR02 HillsboroColocation | Hillsboro, United States | Operational | — | — | Operator / official |
| STACK Infrastructure SVY01 campus expansion San JoseHyperscale | San Jose, United States | Under construction | — | — | Operator / official |
| STACK Infrastructure SVY01 San JoseHyperscale | San Jose, United States | Operational | — | — | Trade press |
| STACK Loudoun County Campus (Arcola)Hyperscale | Arcola, United States | Planned | — | — | Operator / official |
| STACK NVA05 ManassasHyperscale | Manassas, United States | Planned | — | — | Operator / official |
Market position
How STACK Infrastructure compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, STACK Infrastructure ranks #8 of 171 tracked operators by capacity, with 3% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Canada, STACK Infrastructure ranks #9 of 18 tracked operators by capacity, with 0.5% of the country’s tracked MW.
- In Japan, STACK Infrastructure ranks #12 of 20 tracked operators by capacity, with 2% of the country’s tracked MW.
- Hillsboro also hosts 10 other tracked data center(s), run by QTS, Aligned Data Centers, Flexential and NTT DATA.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| QTS | 47 | 1,977 MW | 283 MW |
All data centers in United States Power and policy in United States
Data center operators in Canada
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| O'Leary Ventures | 1 | — | 7,500 MW |
| Meta | 1 | — | 1,000 MW |
| Beacon AI Centers | 1 | — | 920 MW |
| Bell Canada | 2 | — | 300 MW |
| eStruxture | 16 | 148 MW | 90 MW |
| Vantage Data Centers | 4 | 127 MW | — |
| Cologix | 23 | 86.4 MW | — |
| QScale | 2 | — | 60 MW |
All data centers in Canada Power and policy in Canada
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| Colt DCS | 9 | 101 MW | 262 MW |
| EdgeConneX | 1 | — | 200 MW |
| NTT DATA | 3 | 30 MW | 136 MW |
| CloudHQ | 1 | — | 96.4 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
| Vantage Data Centers | 1 | — | 68 MW |
| Equinix | 18 | 54 MW | — |
All data centers in Japan Power and policy in Japan
Other data centers in Hillsboro
- QTS Hillsboro 2 · QTS · Operational · 180 MW
- QTS Hillsboro 3 · QTS · Planned · 100 MW
- Aligned PDX-01 Hillsboro · Aligned Data Centers · Under construction · 72 MW
- Flexential Portland – Hillsboro 3 · Flexential · Operational · 36 MW
- Flexential Portland – Hillsboro 5 · Flexential · Operational · 36 MW
- NTT DATA Hillsboro HI1 · NTT DATA · Operational · 36 MW
- Flexential Portland – Hillsboro 6 · Flexential · Operational · 27 MW
- QTS Hillsboro 1 DC1 · QTS · Operational · 20 MW
- Flexential Portland – Hillsboro 2 · Flexential · Operational · 18 MW
- Flexential Portland – Hillsboro 4 · Flexential · Operational · 18 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does STACK Infrastructure operate?
DC Market Insights tracks 26 STACK Infrastructure data center(s) in 7 countries as of October 2026: 13 operational, 5 under construction and 8 planned.
Where is STACK Infrastructure headquartered?
STACK Infrastructure is headquartered in Denver, United States. Ownership: Private; sponsored by IPI Partners (per the January 2019 platform launch release).
Which other companies operate data centers in United States?
Besides STACK Infrastructure, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Hillsboro?
Other tracked data centers in Hillsboro include QTS Hillsboro 2 (QTS), QTS Hillsboro 3 (QTS), Aligned PDX-01 Hillsboro (Aligned Data Centers) and Flexential Portland – Hillsboro 3 (Flexential).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.