In short

As of 12 October 2026, DC Market Insights tracks 2 data centers operated by ITENOS in 1 country, of which 2 are operational. Stated operational capacity is 20 MW.

2Facilities tracked
1Countries
20 MWOperational (2 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 2 facilities have a stated capacity; the others are counted as sites only.

Data Center Hamburg 1 (HAM1) · ITENOS · Hamburg (approximate location)DUS2 · ITENOS · Hilden (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

ITENOS data centers: key facts

  • Its largest operational site is DUS2 in Hilden, Germany at 20 MW.
  • 1 of 2 facilities have a capacity stated by their source; the totals above count only those.

Facilities

2 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DUS2Colocation Hilden, Germany Operational 20 MW total — Operator / official
Data Center Hamburg 1 (HAM1)Colocation Hamburg, Germany Operational — — Operator / official

Market position

How ITENOS compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Germany, ITENOS ranks #26 of 56 tracked operators by capacity, with 0.4% of the country’s tracked MW.
  • Germany has 188 tracked data centers from 56 operators: 933 MW operational and 4,386 MW under construction or planned.
  • Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
  • Hilden also hosts 1 other tracked data center(s), run by AtlasEdge.

Data center operators in Germany

Tracked facilities18856 operators
Operational capacity933 MW4,386 MW in the pipeline
ITENOS rank by capacity#26of 56 operators · 0.4%
Industrial power price180 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
NTT DATA12223 MW658 MW
CloudHQ4112 MW407 MW
AM:PM Grund1—500 MW
Telis Energie Deutschland1—500 MW
Schwarz Digits (STACKIT)2—440 MW
Amazon Web Services2—300 MW
CyrusOne760 MW219 MW
maincubes639 MW226 MW

All data centers in Germany Power and policy in Germany

Other data centers in Hilden

  • DUS001 · AtlasEdge · Operational · 11.2 MW

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does ITENOS operate?

DC Market Insights tracks 2 ITENOS data center(s) in 1 country as of October 2026: 2 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Germany?

Besides ITENOS, the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 56 operators.

What rules apply to data centers in Germany?

Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.

Which other data centers are in Hilden?

Other tracked data centers in Hilden include DUS001 (AtlasEdge).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst