AtlasEdge Data Centers
Data centers operated by AtlasEdge that we have verified: location, status and capacity, each checked against its source.
In short
As of 9 November 2026, DC Market Insights tracks 11 data centers operated by AtlasEdge in 3 countries, of which 9 are operational. Stated operational capacity is 35.2 MW, with a further 4.4 MW under construction and 4.4 MW planned. The pipeline is 0.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 6 of 11 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
AtlasEdge data centers: key facts
About AtlasEdge
AtlasEdge designs, builds and operates data centres in European markets, with sites listed in Barcelona, Berlin, Brussels, Düsseldorf, Hamburg, Leverkusen, Lisbon, Manchester, Stuttgart and Vienna, as stated on its website in October 2026. It was formed in 2021 through joint investment from DigitalBridge and Liberty Global and began by acquiring 12 data centres from Colt.
- Founded
- 2021
- Ownership
- Backed by DigitalBridge and Liberty Global (joint investment)
- Parent company
- Joint venture between Liberty Global and DigitalBridge
- Tracked footprint
- 11 facilities in 3 countries
- Website
- atlasedge.com
Data center business
- AtlasEdge says its modular-based construction enables rapid deployments under 10MW, while it develops larger campuses, with a target of more than 500MW in its powered landbank.
Recent updates
- 28 May 2026: AtlasEdge announced the closing of a EUR 1.2 billion financing facility, the largest in the company's history.
- 5 May 2026: AtlasEdge completed the sale of nine selected data centre sites to Templus.
Company details checked against company and official sources, 9 Nov 2026.
- Capacity under construction or planned (8.8 MW) is 0.3 times the operational base of 35.2 MW.
- Its largest operational site is DUS001 in Hilden, Germany at 11.2 MW.
- The largest project in the pipeline is LEV002 by AtlasEdge (4.4 MW, under construction).
- Germany accounts for 100% of tracked capacity (8 facilities).
- 6 of 11 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
AtlasEdge development pipeline
Under construction and planned facilities with a stated capacity, largest first. 4.4 MW under construction and 4.4 MW planned in total.
Facilities
11 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| DUS001Colocation | Hilden, Germany | Operational | 11.2 MW IT | — | Operator / official |
HAM002Colocation
History
|
Ahrensburg, Germany | Operational | 11.2 MW IT | 2024 | Trade press |
| STR001Colocation | Böblingen, Germany | Operational | 11.2 MW IT | — | Operator / official |
| LEV002Colocation | Leverkusen, Germany | Under construction | 4.4 MW IT | — | Operator / official |
| LEV002Colocation | Leverkusen, Germany | Planned | 4.4 MW | — | Operator / official |
| LEV001Colocation | Leverkusen, Germany | Operational | 1.6 MW IT | — | Operator / official |
| AMS001Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| AMS002Colocation | Amsterdam, Netherlands | Operational | — | — | Operator / official |
| BER001Colocation | Berlin, Germany | Operational | — | — | Operator / official |
| BRU001Colocation | Nossegem, Belgium | Operational | — | — | Operator / official |
| HAM001Colocation | Hamburg, Germany | Operational | — | — | Operator / official |
Market position
How AtlasEdge compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Germany, AtlasEdge ranks #18 of 56 tracked operators by capacity, with 0.8% of the country’s tracked MW.
- Germany has 188 tracked data centers from 56 operators: 933 MW operational and 4,386 MW under construction or planned.
- Industrial electricity in Germany costs 180 USD/MWh (2025, latest official figure).
- In Netherlands, AtlasEdge is one of 33 operators we track.
- In Belgium, AtlasEdge is one of 12 operators we track.
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 4 | 40 MW | 162 MW |
| CloudHQ | 1 | — | 84 MW |
| Pure DC | 1 | — | 78 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Data center operators in Belgium
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Ark Data Centres | 1 | — | 24 MW |
| KevlinX | 2 | 16 MW | — |
| EdgeConneX | 1 | 16 MW | — |
| Digital Realty | 3 | 13.6 MW | — |
| Penta Infra | 1 | 7.2 MW | — |
| nLighten | 1 | 1.2 MW | — |
| Datacenter United | 15 | — | — |
| LCL | 5 | — | — |
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does AtlasEdge operate?
DC Market Insights tracks 11 AtlasEdge data center(s) in 3 countries as of November 2026: 9 operational, 1 under construction and 1 planned.
Which other companies operate data centers in Germany?
Besides AtlasEdge, the largest operators we track in Germany by capacity are NTT DATA, CloudHQ, AM:PM Grund, Telis Energie Deutschland and Schwarz Digits (STACKIT). The Germany page lists all 56 operators.
What rules apply to data centers in Germany?
Our Power & Policy Tracker lists 28 government actions on data centers and power in Germany, including 1 restriction(s) and 0 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.