Proprietary data
Moro Hub Data Centers
Data centers operated by Moro Hub that we have verified: location, status and capacity, each checked against its source.
In short
As of 25 November 2026, DC Market Insights tracks 1 data center operated by Moro Hub in 1 country (1 operational). Stated operational capacity is 100 MW.
MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Moro Hub data centers: key facts
- Its largest operational site is Moro Hub Green Data Centre in Dubai, United Arab Emirates at 100 MW.
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Moro Hub Green Data CentreColocation | Dubai, United Arab Emirates | Operational | 100 MW | 2023 | Operator / official |
Market position
How Moro Hub compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United Arab Emirates, Moro Hub ranks #3 of 5 tracked operators by capacity, with 8% of the country’s tracked MW.
- United Arab Emirates has 18 tracked data centers from 5 operators: 148 MW operational and 1,100 MW under construction or planned.
- Industrial electricity in United Arab Emirates costs 120 USD/MWh (2026, latest official figure).
- Dubai also hosts 8 other tracked data center(s), run by Equinix, Gulf Data Hub and Khazna Data Centers.
Data center operators in United Arab Emirates
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| G42 | 1 | — | 1,000 MW |
| Khazna Data Centers | 10 | 31.8 MW | 100 MW |
| Gulf Data Hub | 2 | 16 MW | — |
| Equinix | 4 | — | — |
All data centers in United Arab Emirates Power and policy in United Arab Emirates
Other data centers in Dubai
- Dubai DX1 · Equinix · Operational
- Dubai DX2 · Equinix · Operational
- Dubai DX3 · Equinix · Operational
- Dubai Silicon Oasis Building 1 · Gulf Data Hub · Operational
- DXB2 · Khazna Data Centers · Under construction
- DXB3 · Khazna Data Centers · Under construction
- DXB8 · Khazna Data Centers · Operational
- Khazna Meydan Data Center · Khazna Data Centers · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Moro Hub operate?
DC Market Insights tracks 1 Moro Hub data center(s) in 1 country as of November 2026: 1 operational, 0 under construction and 0 planned.
Which other companies operate data centers in United Arab Emirates?
Besides Moro Hub, the largest operators we track in United Arab Emirates by capacity are G42, Khazna Data Centers, Gulf Data Hub and Equinix. The United Arab Emirates page lists all 5 operators.
What rules apply to data centers in United Arab Emirates?
Our Power & Policy Tracker lists 5 government actions on data centers and power in United Arab Emirates, including 0 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Dubai?
Other tracked data centers in Dubai include Dubai DX1 (Equinix), Dubai DX2 (Equinix), Dubai DX3 (Equinix) and Dubai Silicon Oasis Building 1 (Gulf Data Hub).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.