Data Center Power & Policy in United Arab Emirates

Every government action on data centers and power in United Arab Emirates that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 8 October 2026, DC Market Insights tracks 5 government actions on data centers and power in United Arab Emirates, 0 of them in force. We have found no moratorium or restriction on new data centers in force in United Arab Emirates.

5Actions tracked
0In force
120 USD/MWhIndustrial power price
8.8%Renewable share of generation

Market snapshot

United Arab Emirates power and policy: key facts

  • Industrial electricity price: 120 USD/MWh (2026). Rank 14 of 30 tracked countries, highest first.
  • Renewable share of electricity generation: 8.8% (2024). Rank 40 of 42 tracked countries, highest first.
  • Grid emission factor: 0.47 kgCO2/kWh (2024). Rank 10 of 36 tracked countries, highest first.
  • Latest change: Financial close of 1GW Al Dhafra Power Plant to power data centre projects (Emirates Water and Electricity Company (EWEC); TAQA, 30 Dec 2025).
  • By type: 3 plan or strategy, 1 grid access and 1 renewable energy.

Power indicators for United Arab Emirates

Latest official figure for each indicator, with earlier years where we have them.

Industrial electricity price 120 USD/MWh 2026 · DEWA (Dubai) industrial slab tariff AED 0.380/kWh for consumption above 10,000 kWh/month plus fuel surcharge AED 0.060/kWh (October 2026) = AED 0.44/kWh; converted at fixed peg 3.6725 AED/USD. Dubai only; base tariff alone = 103.47 USD/MWh. Dubai Electricity and Water Authority (DEWA)
Renewable share of electricity generation 8.8% 2024 · Sum of solar 8.580616 + wind 0.11282862 + bioenergy 0.11847004 (% of generation), Ember data via Our World in Data 'share-elec-by-source'; nuclear (22.92%) excluded 2023: 8.8%
Grid emission factor 0.47 kgCO2/kWh 2024 · Ember carbon intensity of electricity 467.51 gCO2/kWh (original year 2024) via Our World in Data, converted to kgCO2/kWh; DEWA reports opened did not show a grid factor

In force now in United Arab Emirates

We have not yet verified an action in force for United Arab Emirates. Announced and proposed measures are listed below.

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Grid accessAnnounced

    Financial close of 1GW Al Dhafra Power Plant to power data centre projects

    TAQA and EWEC announced on 30 December 2025 financial close for the about AED 3.6 billion, 1GW Al Dhafra gas turbine power plant under a 24-year PPA, which will provide power to data centre projects and advance the UAE National Strategy for Artificial Intelligence 2031; construction has begun.

    1 GW Plant capacity

    Emirates Water and Electricity Company (EWEC); TAQA · Abu Dhabi · Emirates Water and Electricity Company (EWEC)

  • Renewable energyAnnounced

    Groundbreaking of 1GW round-the-clock renewable energy project (5.2GW solar PV + 19GWh storage)

    Groundbreaking on 24 October 2025 of a Masdar/EWEC project integrating 5.2GW solar PV with a 19GWh battery system to supply 1GW of baseload renewable power around the clock; capital investment of more than AED22 billion; operational by 2027. The Abu Dhabi Department of Energy states it supports sectors such as data centres for AI.

    1 GW baseload 5.2GW PV and 19GWh BESS

    Abu Dhabi Department of Energy; EWEC; Masdar · Abu Dhabi · Effective 1 Jan 2027 · Emirates Water and Electricity Company (EWEC)

  • Plan or strategyAnnounced

    Stargate UAE 1GW compute cluster within the UAE-US AI Campus

    Announced 22 May 2025: Stargate UAE, a 1GW compute cluster built by G42 and operated by OpenAI and Oracle, will run in the 5GW UAE-US AI Campus in Abu Dhabi under a framework set by the US and UAE governments; the first 200MW cluster is expected to go live in 2026.

    1 GW Cluster capacity; first 200MW phase expected 2026

    G42 with OpenAI, Oracle; under US-UAE government framework · Abu Dhabi

  • Plan or strategyAnnounced

    5GW UAE-US AI Campus in Abu Dhabi unveiled

    On 15 May 2025 a 5GW UAE-US AI Campus, described as the largest AI infrastructure project outside the US, was unveiled in the presence of UAE President Sheikh Mohamed bin Zayed Al Nahyan and US President Donald J. Trump; G42 leads the consortium with US partners.

    5 GW Planned campus capacity

    UAE and US governments; G42 (lead developer) · Abu Dhabi

  • Plan or strategyAnnounced

    US-UAE deals fact sheet: UAE commitment on data center investment (May 2025)

    White House fact sheet of 15 May 2025 on US-UAE deals states the UAE commits to invest in, build, or finance US data centers at least as large and as powerful as those in the UAE.

    The White House (United States) · The White House

Timeline of data center and power policy in United Arab Emirates

DateActionTypeStatusAuthority
30 Dec 2025Financial close of 1GW Al Dhafra Power Plant to power data centre projects Abu DhabiGrid accessAnnouncedEmirates Water and Electricity Company (EWEC); TAQA
24 Oct 2025Groundbreaking of 1GW round-the-clock renewable energy project (5.2GW solar PV + 19GWh storage) Abu DhabiRenewable energyAnnouncedAbu Dhabi Department of Energy; EWEC; Masdar
22 May 2025Stargate UAE 1GW compute cluster within the UAE-US AI Campus Abu DhabiPlan or strategyAnnouncedG42 with OpenAI, Oracle; under US-UAE government framework
15 May 20255GW UAE-US AI Campus in Abu Dhabi unveiled Abu DhabiPlan or strategyAnnouncedUAE and US governments; G42 (lead developer)
15 May 2025US-UAE deals fact sheet: UAE commitment on data center investment (May 2025)Plan or strategyAnnouncedThe White House (United States)

How United Arab Emirates compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in United Arab Emirates?

We have found no moratorium or restriction on new data centers in force in United Arab Emirates as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.

What does electricity cost for data centers in United Arab Emirates?

The industrial electricity price in United Arab Emirates was 120 USD/MWh in 2026 (DEWA (Dubai) industrial slab tariff AED 0.380/kWh for consumption above 10,000 kWh/month plus fuel surcharge AED 0.060/kWh (October 2026) = AED 0.44/kWh; converted at fixed peg 3.6725 AED/USD. Dubai only; base tariff alone = 103.47 USD/MWh.). Data center contracts can differ by voltage level, contract length and location.

How much of United Arab Emirates’s electricity is renewable?

Renewables supplied 8.8% of electricity generation in United Arab Emirates in 2024.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity does United Arab Emirates have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See United Arab Emirates capacity

Choosing a market or a site?

Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.

Talk to an analyst