Proprietary data
Data Center Power & Policy in United Arab Emirates
Every government action on data centers and power in United Arab Emirates that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 8 October 2026, DC Market Insights tracks 5 government actions on data centers and power in United Arab Emirates, 0 of them in force. We have found no moratorium or restriction on new data centers in force in United Arab Emirates.
Market snapshot
United Arab Emirates power and policy: key facts
- Industrial electricity price: 120 USD/MWh (2026). Rank 14 of 30 tracked countries, highest first.
- Renewable share of electricity generation: 8.8% (2024). Rank 40 of 42 tracked countries, highest first.
- Grid emission factor: 0.47 kgCO2/kWh (2024). Rank 10 of 36 tracked countries, highest first.
- Latest change: Financial close of 1GW Al Dhafra Power Plant to power data centre projects (Emirates Water and Electricity Company (EWEC); TAQA, 30 Dec 2025).
- By type: 3 plan or strategy, 1 grid access and 1 renewable energy.
Power indicators for United Arab Emirates
Latest official figure for each indicator, with earlier years where we have them.
In force now in United Arab Emirates
We have not yet verified an action in force for United Arab Emirates. Announced and proposed measures are listed below.
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Financial close of 1GW Al Dhafra Power Plant to power data centre projects
TAQA and EWEC announced on 30 December 2025 financial close for the about AED 3.6 billion, 1GW Al Dhafra gas turbine power plant under a 24-year PPA, which will provide power to data centre projects and advance the UAE National Strategy for Artificial Intelligence 2031; construction has begun.
1 GW Plant capacity
Groundbreaking of 1GW round-the-clock renewable energy project (5.2GW solar PV + 19GWh storage)
Groundbreaking on 24 October 2025 of a Masdar/EWEC project integrating 5.2GW solar PV with a 19GWh battery system to supply 1GW of baseload renewable power around the clock; capital investment of more than AED22 billion; operational by 2027. The Abu Dhabi Department of Energy states it supports sectors such as data centres for AI.
1 GW baseload 5.2GW PV and 19GWh BESS
Stargate UAE 1GW compute cluster within the UAE-US AI Campus
Announced 22 May 2025: Stargate UAE, a 1GW compute cluster built by G42 and operated by OpenAI and Oracle, will run in the 5GW UAE-US AI Campus in Abu Dhabi under a framework set by the US and UAE governments; the first 200MW cluster is expected to go live in 2026.
1 GW Cluster capacity; first 200MW phase expected 2026
5GW UAE-US AI Campus in Abu Dhabi unveiled
On 15 May 2025 a 5GW UAE-US AI Campus, described as the largest AI infrastructure project outside the US, was unveiled in the presence of UAE President Sheikh Mohamed bin Zayed Al Nahyan and US President Donald J. Trump; G42 leads the consortium with US partners.
5 GW Planned campus capacity
US-UAE deals fact sheet: UAE commitment on data center investment (May 2025)
White House fact sheet of 15 May 2025 on US-UAE deals states the UAE commits to invest in, build, or finance US data centers at least as large and as powerful as those in the UAE.
Timeline of data center and power policy in United Arab Emirates
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 30 Dec 2025 | Financial close of 1GW Al Dhafra Power Plant to power data centre projects Abu Dhabi | Grid access | Announced | Emirates Water and Electricity Company (EWEC); TAQA |
| 24 Oct 2025 | Groundbreaking of 1GW round-the-clock renewable energy project (5.2GW solar PV + 19GWh storage) Abu Dhabi | Renewable energy | Announced | Abu Dhabi Department of Energy; EWEC; Masdar |
| 22 May 2025 | Stargate UAE 1GW compute cluster within the UAE-US AI Campus Abu Dhabi | Plan or strategy | Announced | G42 with OpenAI, Oracle; under US-UAE government framework |
| 15 May 2025 | 5GW UAE-US AI Campus in Abu Dhabi unveiled Abu Dhabi | Plan or strategy | Announced | UAE and US governments; G42 (lead developer) |
| 15 May 2025 | US-UAE deals fact sheet: UAE commitment on data center investment (May 2025) | Plan or strategy | Announced | The White House (United States) |
How United Arab Emirates compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Austria | 169 USD/MWh (2026) | 78% (2025) | 0.15 kgCO2/kWh (2023) | 0 | 0 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Canada | — | 63.9% (2024) | 0.10 kgCO2/kWh (2022) | 6 | 0 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| China | — | 38% (2025) | 0.53 kgCO2/kWh (2023) | 2 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Ecuador | — | — | 0.16 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| Guatemala | 84.5 USD/MWh (2025) | 53.5% (2024) | 0.29 kgCO2/kWh (2024) | 0 | 2 |
| Hong Kong | 180 USD/MWh (2026) | — | 0.59 kgCO2/kWh (2025) | 0 | 2 |
| Iceland | 42.9 USD/MWh (2022) | 100% (2026) | — | 1 | 2 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 1 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Italy | 184 USD/MWh (2025) | 48% (2025) | 0.20 kgCO2/kWh (2025) | 0 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Kyrgyzstan | 41.7 USD/MWh (2026) | 88% (2024) | 0.16 kgCO2/kWh (2019) | 1 | 1 |
| Luxembourg | 165 USD/MWh (2025) | 23.3% (2025) | — | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Mexico | — | — | 0.44 kgCO2/kWh (2023) | 0 | 0 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Panama | 66.3 USD/MWh (2025) | 74.7% (2025) | 0.15 kgCO2/kWh (2024) | 0 | 1 |
| Paraguay | 33.0 USD/MWh (2026) | — | — | 1 | 2 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Philippines | — | 22.2% (2024) | 0.71 kgCO2/kWh (2017) | 1 | 2 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 1 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Spain | 113 USD/MWh (2025) | 55.5% (2025) | — | 1 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| Sweden | 78.5 USD/MWh (2025) | — | 0.06 kgCO2/kWh (2023) | 0 | 0 |
| Switzerland | 240 USD/MWh (2026) | 70.8% (2025) | 0.13 kgCO2/kWh (2022) | 0 | 0 |
| Taiwan | — | 12.7% (2025) | 0.47 kgCO2/kWh (2024) | 1 | 0 |
| Thailand | 120 USD/MWh (2026) | — | 0.48 kgCO2/kWh (2026) | 0 | 2 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uruguay | 101 USD/MWh (2026) | 98% (2025) | 0.01 kgCO2/kWh (2025) | 0 | 3 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
| Venezuela | — | 77% (2023) | — | 0 | 1 |
Questions
Is there a data center moratorium in United Arab Emirates?
We have found no moratorium or restriction on new data centers in force in United Arab Emirates as of 8 October 2026. Proposed or announced measures, if any, are listed in the timeline.
What does electricity cost for data centers in United Arab Emirates?
The industrial electricity price in United Arab Emirates was 120 USD/MWh in 2026 (DEWA (Dubai) industrial slab tariff AED 0.380/kWh for consumption above 10,000 kWh/month plus fuel surcharge AED 0.060/kWh (October 2026) = AED 0.44/kWh; converted at fixed peg 3.6725 AED/USD. Dubai only; base tariff alone = 103.47 USD/MWh.). Data center contracts can differ by voltage level, contract length and location.
How much of United Arab Emirates’s electricity is renewable?
Renewables supplied 8.8% of electricity generation in United Arab Emirates in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity does United Arab Emirates have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.