Proprietary data

Data Centers in Russia

Every data center in Russia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 20 October 2026, DC Market Insights tracks 104 data centers in Russia run by 19 operators: 80 operational, 10 under construction and 14 planned. Stated operational capacity is 371 MW, with a further 183 MW under construction and 69 MW planned. IXcellerate holds the largest share of tracked operational capacity (34%).

104Facilities tracked
19Operators
371 MWOperational (80 sites)
183 MWUnder construction (10 sites)
69 MWPlanned (14 sites)

MW = IT capacity where the source states it, otherwise total capacity. 31 of 104 facilities have a stated capacity; the others are counted as sites only.

IXcellerate MOS1 · IXcellerate · Moscow (approximate location)IXcellerate MOS2 · IXcellerate · Moscow (approximate location)IXcellerate MOS3 · IXcellerate · Moscow (approximate location)IXcellerate MOS4 · IXcellerate · Moscow (approximate location)IXcellerate MOS5 · IXcellerate · Moscow (approximate location)IXcellerate MOS6 · IXcellerate · Moscow (approximate location)IXcellerate MOS7 · IXcellerate · Moscow (approximate location)IXcellerate MOS8 · IXcellerate · Moscow (approximate location)IXcellerate MOS11 (Vёshki) · IXcellerate · Mytishchi (approximate location)IXcellerate MOS12 (Vёshki) · IXcellerate · Mytishchi (approximate location)DataPro I · DataPro · Moscow (approximate location)DataPro II · DataPro · Khimki (approximate location)DataPro III · DataPro · Moscow (approximate location)DataPro IV · DataPro · Moscow (approximate location)DataPro V · DataPro · Moscow (approximate location)DataPro VI · DataPro · Moscow (approximate location)3data Paveletskaya · 3data · Moscow (approximate location)3data Stroykovskaya · 3data · Moscow (approximate location)3data Altufyevskoye · 3data · Moscow (approximate location)3data Bolshaya Polyanka · 3data · Moscow (approximate location)3data Entuziastov · 3data · Moscow (approximate location)3data Ugreshsky · 3data · Moscow (approximate location)3data Naprudny · 3data · Moscow (approximate location)3data Novoryazanskaya · 3data · Moscow (approximate location)3data Sadovaya-Kudrinskaya · 3data · Moscow (approximate location)3data Maryina Roshcha · 3data · Moscow (approximate location)3data Butlerova · 3data · Moscow (approximate location)3data 8 Marta · 3data · Moscow (approximate location)RTK-DPC NORD cluster · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC OST cluster · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC Moscow Ostapovsky cluster (Moscow-I, Moscow-V) · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC Moscow Kurchatovsky cluster (Moscow-II, Moscow-III) · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC M9 (MMTS-9) · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC Medvedkovo · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC Medvedkovo-2 · Rostelecom-DPC (RTK-DPC) · Moscow (approximate location)RTK-DPC Saint Petersburg · Rostelecom-DPC (RTK-DPC) · Saint Petersburg (approximate location)RTK-DPC Yekaterinburg · Rostelecom-DPC (RTK-DPC) · Yekaterinburg (approximate location)RTK-DPC Novosibirsk · Rostelecom-DPC (RTK-DPC) · Novosibirsk (approximate location)RTK-DPC Nizhny Novgorod · Rostelecom-DPC (RTK-DPC) · Nizhniy Novgorod (approximate location)RTK-DPC Murmansk · Rostelecom-DPC (RTK-DPC) · Murmansk (approximate location)RTK-DPC Adler · Rostelecom-DPC (RTK-DPC) · Sochi (approximate location)RTK-DPC Kazan · Rostelecom-DPC (RTK-DPC) · Kazan (approximate location)RTK-DPC Kaliningrad · Rostelecom-DPC (RTK-DPC) · Kaliningrad (approximate location)RTK-DPC Krasnodar · Rostelecom-DPC (RTK-DPC) · Krasnodar (approximate location)RTK-DPC Ryazan · Rostelecom-DPC (RTK-DPC) · Ryazan (approximate location)RTK-DPC Stavropol · Rostelecom-DPC (RTK-DPC) · Stavropol (approximate location)RTK-DPC Ufa · Rostelecom-DPC (RTK-DPC) · Ufa (approximate location)RTK-DPC Khabarovsk · Rostelecom-DPC (RTK-DPC) · Khabarovsk (approximate location)RTK-DPC Chelyabinsk · Rostelecom-DPC (RTK-DPC) · Chelyabinsk (approximate location)RTK-DPC Yuzhno-Sakhalinsk · Rostelecom-DPC (RTK-DPC) · Yuzhno-Sakhalinsk (approximate location)Kalininsky data center (Udomlya) · Atomdata (Rosatom) · Udomlya (approximate location)Atomdata Xelent · Atomdata (Rosatom) · Saint Petersburg (approximate location)Atomdata StoreData · Atomdata (Rosatom) · Moscow (approximate location)Atomdata Moscow-2 · Atomdata (Rosatom) · Moscow (approximate location)Atomdata Arktika · Atomdata (Rosatom) · Murmansk (approximate location)Atomdata Xelent-2 · Atomdata (Rosatom) · Saint Petersburg (approximate location)MTS Avantage · MTS Web Services (MWS) · Lytkarino (approximate location)MTS GreenBushDC · MTS Web Services (MWS) · Zelenograd (approximate location)MTS Naro-Fominsk · MTS Web Services (MWS) · Naro-Fominsk (approximate location)MTS Nizhny Novgorod · MTS Web Services (MWS) · Nizhniy Novgorod (approximate location)MTS Saint Petersburg (Fedorovskoye) · MTS Web Services (MWS) · Fedorovskoye (approximate location)MTS Novosibirsk · MTS Web Services (MWS) · Novosibirsk (approximate location)Selectel Berzarina · Selectel · Moscow (approximate location)Selectel Yurlovsky · Selectel · Moscow (approximate location)Selectel Tsvetochnaya 1 · Selectel · Saint Petersburg (approximate location)Selectel Tsvetochnaya 2 · Selectel · Saint Petersburg (approximate location)Selectel Dubrovka 1 · Selectel · Dubrovka (approximate location)Selectel Dubrovka 2 · Selectel · Dubrovka (approximate location)Selectel Dubrovka 3 · Selectel · Dubrovka (approximate location)Linx Moscow · Linxdatacenter (Linx) · Moscow (approximate location)Linx Saint Petersburg · Linxdatacenter (Linx) · Saint Petersburg (approximate location)Linx Datacenter I Acado · Linxdatacenter (Linx) · Moscow (approximate location)Miran-1 · Miran · Saint Petersburg (approximate location)Miran-2 · Miran · Saint Petersburg (approximate location)STACK M1 · Stack Telecom (STACK Group) · Moscow (approximate location)Key Point Vladivostok (TOR Nadezhdinskaya) · Key Point Group · Vladivostok (approximate location)Key Point Novosibirsk · Key Point Group · Novosibirsk (approximate location)Key Point Saint Petersburg · Key Point Group · Saint Petersburg (approximate location)Key Point Makhachkala · Key Point Group · Makhachkala (approximate location)Key Point Rostov-on-Don · Key Point Group · Rostov-on-Don (approximate location)MegaFon Saint Petersburg data center · MegaFon · Saint Petersburg (approximate location)MegaFon Tver data center · MegaFon · Tver (approximate location)MegaFon Yekaterinburg data center · MegaFon · Yekaterinburg (approximate location)Yandex Vladimir data center · Yandex · Vladimir (approximate location)Yandex Vladimir 2 data center · Yandex · Vladimir (approximate location)Yandex Sasovo data center · Yandex · Sasovo (approximate location)Yandex Kaluga data center · Yandex · Kaluga (approximate location)VK Pakhra data center · VK · Domodedovo (approximate location)VK Saint Petersburg data center (Pervomayskaya TPP) · VK · Saint Petersburg (approximate location)Sber Skolkovo data center · Sber · Moscow (approximate location)Sber Yuzhny Port data center · Sber · Moscow (approximate location)RWB Dubna data center · RWB (Wildberries & Russ) · Dubna (approximate location)RWB Elektrostal data center · RWB (Wildberries & Russ) · Elektrostal (approximate location)Wildberries Naro-Fominsk data center · RWB (Wildberries & Russ) · Naro-Fominsk (approximate location)RTK-DPC Tolyatti · Rostelecom-DPC (RTK-DPC) · Tolyatti (approximate location)RTK-DPC Vladivostok · Rostelecom-DPC (RTK-DPC) · Vladivostok (approximate location)NK Park Shushary-3 data center · NK Group · Saint Petersburg (approximate location)TsOD Expert Suzdalsky Prospekt data center · TsOD Expert · Saint Petersburg (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Russia data center market: key facts

  • Capacity under construction or planned (252 MW) is 0.7 times the operational base of 371 MW.
  • The three largest operators by operational capacity, IXcellerate, Yandex and Rostelecom-DPC (RTK-DPC), hold 65% of tracked operational MW.
  • IXcellerate has the largest development pipeline in Russia: 74 MW under construction or planned.
  • The largest operational facility we track is IXcellerate MOS5 (IXcellerate, Moscow) at 64 MW.
  • The largest project in the pipeline is IXcellerate MOS11 (Vёshki) (40 MW, under construction).
  • Moscow is the largest cluster: 55 of 104 facilities and 66% of tracked capacity.
  • By type, the tracker lists 78 colocation, 14 edge and 7 hyperscale facilities.
  • 31 of 104 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational371 MW
Under construction183 MW
Planned69 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
30'17'186'19'203'217'2246'238'2419'258'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in Russia by tracked capacity, MW
Yandex103 MW
Sber29.9 MW

OperationalUnder construction or planned

Capacity by market in Russia, MW
Moscow410 MW
Saint Petersburg67 MW
Kaluga63 MW
Vladimir40 MW
Yekaterinburg17 MW
Vladivostok10 MW
Kazan8 MW
Nizhniy Novgorod5 MW
Novosibirsk3 MW

OperationalUnder construction or planned

Facilities by type
Colocation78
Edge14
Hyperscale7
Enterprise5

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Russia data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 10 October 2026. Government sources are linked; the full source list comes with the Excel data.

Electricity consumption in Russia's Unified Energy System was 1,161.2 billion kWh in 2025, 1.1% lower than in 2024, and installed capacity of its power plants was 264,851 MW on 1 January 2026, according to the System Operator. System Operator of the Unified Energy System (SO UES)

Policy and incentives

Federal Law No. 242-FZ of 21 July 2014 amends Russian legislation on the processing of personal data in information and telecommunication networks. The law entered into force on 1 September 2015.

Federal Law No. 244-FZ of 23 July 2025 amends the Law 'On Communications' to define a data centre (ЦОД) in law and provides for a register of data centres located in Russia. Placing mining infrastructure, mining itself and mining-pool activity is banned in data centres included in the register. The law took effect on official publication, with some provisions from 1 March 2026.

Government Resolution No. 1869 of 23 December 2024 banned crypto mining from 1 January 2025 until 15 March 2031 in 10 regions, including Dagestan, Ingushetia, North Ossetia, Chechnya, Kabardino-Balkaria and Karachay-Cherkessia. In parts of Irkutsk Oblast, Buryatia and Zabaykalsky Krai a seasonal ban applies each year from 15 November to 15 March. Federal Tax Service of Russia (Saratov region office), presentation on mining legislation

Government Resolution No. 936 of 25 July 2026 added Moscow, Moscow Oblast and eight districts of Kursk Oblast to the list of territories where crypto mining is restricted. The restriction applies from 15 August 2026 to 31 December 2032.

In his address to the Federal Assembly on 29 February 2024, President Putin announced the national project 'Data Economy', with at least RUB 700 billion to be allocated over six years. One stated goal is to increase the total capacity of Russian supercomputers at least tenfold by 2030.

Power and grid

Electricity consumption in the Unified Energy System (UES) of Russia was 1,161.2 billion kWh in 2025, down 1.1% from 1,174.0 billion kWh in 2024. Installed capacity of UES power plants was 264,851 MW on 1 January 2026. System Operator of the UES, report on UES functioning in 2025

On 26 January 2026 UES power demand reached a new all-time maximum of 175,118 MW during the morning peak, 3,729 MW above the previous record of 11 December 2023, according to the System Operator. System Operator of the UES (press release)

Deputy Energy Minister Petr Konyushenko said in September 2026 that grid-connected data centres in Russia total about 5 GW. Most are in Moscow and St Petersburg, and new connection applications also mainly target these areas, adding load to regional grids.

According to System Operator data reported by TASS, the share of data centres in Russia's electricity consumption rose from 1.4% in 2022 to 2.2% in 2025.

Between 23 June and 3 July 2026 the System Operator recorded new summer peak demand in six regional power systems in Siberia and the Far East, including Buryatia (750 MW on 29 June), Novosibirsk Oblast (2,142 MW) and Khakassia (2,023 MW). System Operator of the UES (press release)

Land, zoning and sites

Moscow city government reported in June 2022 that five data centres were operating in the Technopolis Moscow special economic zone (SEZ), and that SEZ companies had invested more than 9 billion roubles in building and developing data centres there. A further data centre of about 850 sq m, roughly 2.5 MW and 132 racks was announced for the zone. mos.ru (Moscow city government)

Residents of the Technopolis Moscow SEZ pay 0% property tax and 0% land tax for 10 years (land tax rises to 1.5% after the benefit period). The regional share of profit tax is 0% until 2027, and the federal share is 2%.

In February 2024 Moscow city government reported that construction had finished on a Tier IV data centre in the Southern Chertanovo district (Dorozhnaya St. 9). The seven-storey building covers almost 21,000 sq m, has four machine halls of 910 IT racks each and a total capacity of more than 35 MW. The investor paid for the work. mos.ru (Moscow city government)

State corporation Rosatom reported that in 2024 it launched the first phase of its Innopolis data centre in Tatarstan, with 1,000 rack places in four machine halls of 250 racks each. The same year it commissioned the Moscow-2 data centre with 3,640 rack places.

Demand and connectivity

Rostelecom's data centre subsidiary RTK-DC reported in May 2026 that it runs 26 Tier III-certified data centres with 27,800 racks and 235 MW of total capacity. It added about 1,400 rack places in 2025, 5% more than in 2024, and has invested more than 38 billion roubles in expanding the network.

State operator Rostelecom reported that its fibre-optic broadband subscriber base among households reached 12.2 million at the end of Q2 2025. In the same quarter it installed more than 800 racks at its Udomlya-3 data centre.

Internet exchange operator MSK-IX reported on 8 September 2026 that peak load on its distributed exchange network reached 8.7 Tbit/s. It had more than 1,200 clients, including 624 traffic-exchange participants.

From 1 February 2024 hosting providers operating in Russia must be listed in a register kept by Roskomnadzor, which began forming in December 2023. As of 8 February 2024, 265 providers were on the register and 89 applications were under review.

Sustainability, water and climate

Russia's second NDC under the Paris Agreement, submitted to the UNFCCC in 2025, sets a target of cutting greenhouse gas emissions to 65-67% of 1990 levels by 2035. It is based on Presidential Decree No. 547 of 6 August 2025. UNFCCC (Russian Federation second NDC)

Russia's Strategy of Socio-Economic Development with Low Greenhouse Gas Emissions to 2050, prepared under Presidential Decree No. 666 of 4 November 2020, sets a target scenario of reaching a balance between greenhouse gas emissions and absorption no later than 2060. Under that scenario, net emissions in 2050 are 60% below the 2019 level and 80% below the 1990 level. UNFCCC (Russian low-GHG development strategy)

The System Operator reports that in 2024 power plants in Russia's unified and technologically isolated power systems produced 1,182 TWh of electricity: thermal 63.0%, nuclear 18.25%, hydro 17.95% and renewable-energy plants 0.8%. Electricity consumption in the UES of Russia in 2024 was 1,156 TWh. System Operator of the UES (draft SiPR 2026-2031)

Russia's second NDC states that about 37% of the country's electricity generation was low-carbon as of 2024. UNFCCC (Russian Federation second NDC)

Operators in Russia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Rostelecom-DPC (RTK-DPC)2450 MW—13%
3data15———
IXcellerate10128 MW74 MW34%
Selectel711 MW20 MW3%
Atomdata (Rosatom)78 MW35 MW2.2%
MTS Web Services (MWS)632 MW20 MW8.6%
Key Point Group610 MW31 MW2.7%
DataPro6———
Yandex463 MW40 MW17%
Linxdatacenter (Linx)317 MW—4.6%
MegaFon314 MW—3.8%
RWB (Wildberries & Russ)38 MW—2.2%
Sber229.9 MW—8.1%
Miran2———
VK2———
TsOD Expert1—15 MW—
NK Group1—6 MW—
Cloud.ru1—11 MW—
Stack Telecom (STACK Group)1———

Largest data center projects in Russia

Under construction and planned facilities with a stated capacity, largest first. 183 MW under construction and 69 MW planned in total.

ProjectLocationStatusTypeCapacity
IXcellerate MOS11 (Vёshki)IXcellerate Mytishchi Under construction Colocation 40 MW
Yandex Vladimir 2 data centerYandex Vladimir Under construction Hyperscale 40 MW
Atomdata Moscow-2Atomdata (Rosatom) Moscow Under construction Colocation 35 MW
IXcellerate MOS7IXcellerate Moscow Planned Colocation 34 MW
Key Point Saint PetersburgKey Point Group Saint Petersburg Under construction Colocation 20 MW
MTS Naro-FominskMTS Web Services (MWS) Naro-Fominsk Planned Colocation 20 MW
Selectel YurlovskySelectel Moscow Under construction Colocation 20 MW
TsOD Expert Suzdalsky Prospekt data centerTsOD Expert Saint Petersburg Planned Colocation 15 MW
Cloud.ru Moscow Oblast data centerCloud.ru Under construction Hyperscale 11 MW
Key Point Craft (Sverdlovsk Oblast)Key Point Group Under construction Colocation 11 MW
NK Park Shushary-3 data centerNK Group Saint Petersburg Under construction Colocation 6 MW

How Russia compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom18449760 MW7,221 MW
Germany17653844 MW4,501 MW
Sweden2613157 MW1,498 MW
Ireland281239 MW889 MW
Denmark191130 MW844 MW
Finland2112152 MW550 MW
Russia10419371 MW252 MW
Italy75—545 MW
Netherlands10131202 MW182 MW
Austria22—200 MW
France224.5 MW150 MW
Spain7529.4 MW60 MW

Facilities

104 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
VK Saint Petersburg data center (Pervomayskaya TPP)VK Saint Petersburg Planned — — Trade press
Wildberries Naro-Fominsk data centerRWB (Wildberries & Russ) Naro-Fominsk Planned — — Trade press
Yandex Sasovo data centerYandex Sasovo Operational — — Trade press
Yandex Vladimir data centerYandex Vladimir Operational — — Trade press

Get the data

Every data center in Russia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker the moment you download.

Data Centers in Russia: Capacity Sheet

104 facilities

Every tracked data center in Russia with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

2,776 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free weekly alert: data centers in Russia

Every Monday: facilities added, status changes and new deals, each checked against its source. Nothing when nothing changed. Unsubscribe in one click.

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Russia?

DC Market Insights tracks 104 data centers in Russia as of October 2026: 80 operational, 10 under construction and 14 planned, run by 19 operators. The count grows as we verify more sites.

What is the data center capacity of Russia?

Tracked operational capacity in Russia is 371 MW, with 183 MW under construction and 69 MW planned. These totals use the capacity each source states (IT load where given) and cover 31 of 104 tracked facilities.

Which companies operate the most data center capacity in Russia?

By tracked operational capacity, the largest operators in Russia are IXcellerate (128 MW), Yandex (63 MW) and Rostelecom-DPC (RTK-DPC) (50 MW).

Where are the data centers in Russia located?

The largest clusters by tracked capacity are Moscow (55 facilities), Saint Petersburg (17 facilities) and Kaluga (1 facilities). The map above shows every site.

Which new data centers are being built in Russia?

We track 183 MW under construction and 69 MW planned. The largest projects are IXcellerate MOS11 (Vёshki) (40 MW), Yandex Vladimir 2 data center (40 MW) and Atomdata Moscow-2 (35 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy