United Arab Emirates Data Center Capacity

Installed data center capacity in United Arab Emirates (MW, IT load), its share of the region, tracked sites, recent deals and the rules in force. Forecast to 2035 in the data pack.

Data pack · Updated 12 October 2026

How much data center capacity United Arab Emirates has installed, how it compares with the rest of Middle East and Africa, and what our trackers show about its sites, operators, deals and rules.

0.5 GWInstalled, end 2025IT load, DC Market Insights estimate
20%Share of Middle East and Africa2025
#19Rank among 26 countriesInstalled capacity, 2025

United Arab Emirates data center capacity at a glance

United Arab Emirates had about 0.5 GW of installed data center capacity (IT load) at the end of 2025, by our estimate. That is about 20% of the capacity in Middle East and Africa and puts United Arab Emirates at number 19 of the 26 countries in our global model. Our trackers also hold 1 verified deals and 0 government measures in force for the country.

Installed capacity is IT load, the power available to servers, storage and network. The country figure comes from the same model as the global and regional totals and is benchmarked against dated public figures. Site figures below are what each source states, often a campus’s full build-out, so they are not the same measure.

Power context

Recent deals

  • Jan 2026 · Land / campusInitial 25MW data center facility, UAE, 25 MW

Deal Tracker

Other countries in Middle East and Africa

Installed capacity, end 2025, DC Market Insights estimate. All countries and regions

United Arab Emirates in the full data pack

By year to 2035

Installed MW for United Arab Emirates from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases.

Leading hubs

Live and pipeline MW for the main metro markets, with the basis of each figure.

Every tracked site

The full site list with operator, location, status, MW and source, refreshed from our tracker.

Frequently asked questions

How much data center capacity does United Arab Emirates have?

We estimate about 0.5 GW of installed data center capacity (IT load) in United Arab Emirates at the end of 2025, about 20% of Middle East and Africa and number 19 of the 26 countries in our model. This is a DC Market Insights estimate, benchmarked against dated public figures.

How will United Arab Emirates data center capacity grow to 2035?

The full data pack gives installed capacity for United Arab Emirates by year from 2020 to 2035, in the same model as the global and regional totals, with low, base and high cases and the main metro hubs.