As of 25 November 2026, DC Market Insights tracks 28 data centers in South Africa run by 7 operators: 25 operational, 2 under construction and 1 planned. Stated operational capacity is 202 MW, with a further 60 MW under construction and 120 MW planned. Teraco holds the largest share of tracked operational capacity (59%).

28Facilities tracked
7Operators
202 MWOperational (25 sites)
60 MWUnder construction (2 sites)
120 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 20 of 28 facilities have a stated capacity; the others are counted as sites only.

Teraco JB7 · Teraco · Johannesburg (approximate location)Africa Data Centres JHB1 Midrand · Africa Data Centres · Midrand (approximate location)Africa Data Centres JHB2 Samrand · Africa Data Centres · Centurion (approximate location)Africa Data Centres CPT1 Cape Town · Africa Data Centres · Cape Town (approximate location)Equinix JN1 · Equinix · Johannesburg (approximate location)OADC Isando (JNB1) · Open Access Data Centres · Johannesburg (approximate location)OADC Bryanston (JNB2) · Open Access Data Centres · Johannesburg (approximate location)OADC Parklands (JNB3) · Open Access Data Centres · Johannesburg (approximate location)OADC Durban (DUR1) · Open Access Data Centres · Durban (approximate location)OADC Umhlanga (DUR2) · Open Access Data Centres · Durban (approximate location)OADC Rondebosch (CPT1) · Open Access Data Centres · Cape Town (approximate location)OADC Brackenfell (CPT2) · Open Access Data Centres · Cape Town (approximate location)OADC Bree Street (CPT3) · Open Access Data Centres · Cape Town (approximate location)OADC Bloemfontein (BFN1) · Open Access Data Centres · Bloemfontein (approximate location)OADC East London (ELS1) · Open Access Data Centres · East London (approximate location)OADC Gqeberha (PLZ1) · Open Access Data Centres · Gqeberha (approximate location)MTN SA Centurion Data Centre (Ground Floor Phase 1) · MTN · Centurion (approximate location)Vodacom Midrand Data Park (Phase 1) · Vodacom · Midrand (approximate location)Teraco JB1 (East and West) · Teraco · Johannesburg (exact location)Teraco JB3 · Teraco · Johannesburg (exact location)Teraco JB5 · Teraco · Johannesburg (exact location)Teraco JB2 · Teraco · Johannesburg (exact location)Teraco JB4 · Teraco · Johannesburg (exact location)Teraco CT1 · Teraco · Cape Town (exact location)Teraco CT2 · Teraco · Cape Town (exact location)Teraco DB1 · Teraco · Durban (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

South Africa data center market: key facts

  • Capacity under construction or planned (180 MW) is 0.9 times the operational base of 202 MW.
  • The three largest operators by operational capacity, Teraco, Open Access Data Centres and Africa Data Centres, hold 100% of tracked operational MW.
  • Vantage Data Centers has the largest development pipeline in South Africa: 140 MW under construction or planned.
  • The largest operational facility we track is Teraco CT2 (Teraco, Cape Town) at 50 MW.
  • The largest project in the pipeline is Vantage Johannesburg I (JNB1) campus (120 MW, planned).
  • Johannesburg is the largest cluster: 16 of 28 facilities and 79% of tracked capacity.
  • By type, the tracker lists 21 colocation, 5 hyperscale and 2 other facilities.
  • 20 of 28 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational202 MW
Under construction60 MW
Planned120 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in South Africa by tracked capacity, MW
Teraco159 MW

OperationalUnder construction or planned

Capacity by market in South Africa, MW
Johannesburg300 MW
Cape Town68.5 MW
Durban10 MW
Bloemfontein1 MW
East London1 MW
Gqeberha1 MW

OperationalUnder construction or planned

Facilities by type
Colocation21
Hyperscale5
Other2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the South Africa data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 25 November 2026. Government sources are linked; the full source list comes with the Excel data.

South Africa's grid is run by state utility Eskom, with transmission now in the separate NTCSA and coal supplying about 83% of local generation in 2024. Eskom tariffs rose 8.76% for direct customers from 1 April 2026; the 2024 National Policy on Data and Cloud sets siting limits and asks data centres to provide their own power and water backup. Stats SA

Power and grid

Coal produced 83% of local electricity generation in 2024; wind, solar and hydro together 9% (Stats SA). Stats SA

Eskom reported 218,601 GWh of energy available for distribution in FY2025, with 10,983 GWh wind, 6,492 GWh solar and 12,999 GWh hydro generation.

NTCSA's GCCA 2025 update says available grid capacity in the Eastern, Western and Northern Cape is fully allocated; curtailment could raise hosting capacity to 7,205 MW by 2028.

Eskom direct-customer tariffs rose an average 8.76% from 1 April 2026 and municipal bulk tariffs 9.01% from 1 July 2026; Megaflex now carries a separate generation capacity charge.

Policy and incentives

The National Policy on Data and Cloud (Gazette 50741, 31 May 2024) asks data centre operators to provide their own electricity and water supply as backup and keeps sovereign government data in South Africa. Government Gazette 50741

The Electricity Regulation Amendment Act 38 of 2024 (in force 1 January 2025) creates an independent transmission operator and an open platform for competitive electricity trading; NERSA licensed NTCSA as market operator in November 2025. gov.za

Companies in approved Special Economic Zones may pay 15% corporate income tax; carbon tax rose to R308 per tonne CO2e from 1 January 2026. SARS Budget 2026 FAQ

Land, zoning and sites

Under the Data and Cloud Policy, data centres must not be built in restricted areas such as heritage sites or national key points. Government Gazette 50741

Sustainability, water and climate

Cabinet approved the Integrated Resource Plan 2025 on 15 October 2025, a R2.23 trillion plan towards a net-zero electricity sector by 2050. Cabinet statement

Eskom reported water use of 1.40 litres per kWh sent out in FY2024/25.

Operators in South Africa

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Open Access Data Centres1142 MW—21%
Teraco9119 MW40 MW59%
Africa Data Centres340.5 MW—20%
Vantage Data Centers2—140 MW—
Equinix1———
Vodacom1———
MTN1———

Largest data center projects in South Africa

Under construction and planned facilities with a stated capacity, largest first. 60 MW under construction and 120 MW planned in total.

ProjectLocationStatusTypeCapacity
Vantage Johannesburg I (JNB1) campusVantage Data Centers Johannesburg Planned Hyperscale 120 MW
Teraco JB7Teraco Johannesburg Under construction Hyperscale 40 MW
Vantage Johannesburg II (JNB2)Vantage Data Centers Ekurhuleni Under construction Hyperscale 20 MW

How South Africa compares in Middle East & Africa

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Arab Emirates185148 MW1,100 MW
Saudi Arabia8724 MW584 MW
South Africa287202 MW180 MW
Israel13333 MW52.5 MW
Kenya10612 MW53 MW
Oman43—45 MW
Nigeria12637.5 MW—
Egypt76—25 MW
Bahrain112.7 MW—
DR Congo222 MW—
Morocco1813——
Jordan109——

Data center deals in South Africa

Our Deal Tracker lists 5 deals in South Africa since February 2026, with $702.1M in disclosed value.

  • Teraco Properties (Pty) Ltd → Vacant industrial land at Erf 25704 Brackenfell, City of Cape Town Land / campus

All South Africa deals in the Deal Tracker

Facilities

28 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Vantage Johannesburg I (JNB1) campusVantage Data Centers Johannesburg Planned 120 MW IT — Operator / official
Teraco CT2Teraco Cape Town Operational 50 MW IT — Operator / official
Teraco JB4Teraco Johannesburg Operational 50 MW IT — Operator / official
Teraco JB7Teraco Johannesburg Under construction 40 MW IT — Operator / official
Africa Data Centres JHB2 SamrandAfrica Data Centres Centurion Operational 35 MW IT — Operator / official
Vantage Johannesburg II (JNB2)Vantage Data Centers Ekurhuleni Under construction 20 MW IT — Operator / official
Teraco JB2Teraco Johannesburg Operational 14 MW IT 2017 Operator / official
OADC Isando (JNB1)Open Access Data Centres Johannesburg Operational 12 MW — Operator / official
OADC Durban (DUR1)Open Access Data Centres Durban Operational 8 MW — Operator / official
OADC Parklands (JNB3)Open Access Data Centres Johannesburg Operational 6 MW — Operator / official
Africa Data Centres CPT1 Cape TownAfrica Data Centres Cape Town Operational 5.5 MW — Operator / official
OADC Brackenfell (CPT2)Open Access Data Centres Cape Town Operational 5 MW — Operator / official
OADC Bryanston (JNB2)Open Access Data Centres Johannesburg Operational 3 MW — Operator / official
OADC Rondebosch (CPT1)Open Access Data Centres Cape Town Operational 3 MW — Operator / official
Teraco CT1Teraco
History
  1. Under construction
  2. Operational
Cape Town Operational 3 MW IT — Operator / official
OADC Bree Street (CPT3)Open Access Data Centres Cape Town Operational 2 MW — Operator / official
Teraco DB1Teraco Durban Operational 2 MW IT — Operator / official
OADC Bloemfontein (BFN1)Open Access Data Centres Bloemfontein Operational 1 MW — Operator / official
OADC East London (ELS1)Open Access Data Centres East London Operational 1 MW — Operator / official
OADC Gqeberha (PLZ1)Open Access Data Centres Gqeberha Operational 1 MW — Operator / official
Africa Data Centres JHB1 MidrandAfrica Data Centres Midrand Operational — — Operator / official
Equinix JN1Equinix Johannesburg Operational — — Operator / official
MTN SA Centurion Data Centre (Ground Floor Phase 1)MTN Centurion Operational — — Operator / official
OADC Umhlanga (DUR2)Open Access Data Centres Durban Operational — — Operator / official
Teraco JB1 (East and West)Teraco Johannesburg Operational — — Operator / official
Teraco JB3Teraco Johannesburg Operational — — Operator / official
Teraco JB5Teraco Johannesburg Operational — — Operator / official
Vodacom Midrand Data Park (Phase 1)Vodacom Midrand Operational — — Operator / official

Get the data

Every data center in South Africa, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,555 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in South Africa

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

South Africa

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in South Africa?

DC Market Insights tracks 28 data centers in South Africa as of November 2026: 25 operational, 2 under construction and 1 planned, run by 7 operators. The count grows as we verify more sites.

What is the data center capacity of South Africa?

Tracked operational capacity in South Africa is 202 MW, with 60 MW under construction and 120 MW planned. These totals use the capacity each source states (IT load where given) and cover 20 of 28 tracked facilities.

Which companies operate the most data center capacity in South Africa?

By tracked operational capacity, the largest operators in South Africa are Teraco (119 MW), Open Access Data Centres (42 MW) and Africa Data Centres (40.5 MW).

Where are the data centers in South Africa located?

The largest clusters by tracked capacity are Johannesburg (16 facilities), Cape Town (6 facilities) and Durban (3 facilities). The map above shows every site.

Which new data centers are being built in South Africa?

We track 60 MW under construction and 120 MW planned. The largest projects are Vantage Johannesburg I (JNB1) campus (120 MW), Teraco JB7 (40 MW) and Vantage Johannesburg II (JNB2) (20 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does South Africa have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See South Africa capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy