Proprietary data

Yotta Data Centers

Data centers operated by Yotta that we have verified: location, status and capacity, each checked against its source.

In short

As of 7 October 2026, DC Market Insights tracks 7 data centers operated by Yotta in 1 country, of which 5 are operational. Stated operational capacity is 85 MW.

7Facilities tracked
1Countries
85 MWOperational (5 sites)
—Under construction (0 sites)
—Planned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 7 facilities have a stated capacity; the others are counted as sites only.

Yotta NM1 · Yotta · Navi Mumbai (approximate location)Yotta D1 · Yotta · Greater Noida (approximate location)Yotta G1 · Yotta · GIFT City (approximate location)Yotta TB1 · Yotta · Navi Mumbai (approximate location)Yotta TB2 · Yotta · Navi Mumbai (approximate location)Yotta Chennai Data Center Park · Yotta · Chennai (approximate location)Yotta Kolkata Data Center Park · Yotta · Kolkata (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Yotta data centers: key facts

  • Its largest operational site is Yotta NM1 in Navi Mumbai, India at 52 MW.
  • By type, the tracker lists 4 hyperscale and 3 colocation facilities.
  • 5 of 7 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Hyperscale4
Colocation3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Yotta NM1Hyperscale Navi Mumbai, India Operational 52 MW IT — Operator / official
Yotta D1Hyperscale Greater Noida, India Operational 30 MW IT — Operator / official
Yotta G1Colocation GIFT City, India Operational 1 MW IT — Operator / official
Yotta TB1Colocation Navi Mumbai, India Operational 1 MW IT — Operator / official
Yotta TB2Colocation Navi Mumbai, India Operational 1 MW IT — Operator / official
Yotta Chennai Data Center ParkHyperscale Chennai, India Planned — — Operator / official
Yotta Kolkata Data Center ParkHyperscale
History
  1. Announced
  2. Planned
Kolkata, India Planned — — Trade press

Market position

How Yotta compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In India, Yotta ranks #17 of 31 tracked operators by capacity, with 0.8% of the country’s tracked MW.
  • India has 199 tracked data centers from 31 operators: 2,276 MW operational and 7,840 MW under construction or planned.
  • Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
  • Navi Mumbai also hosts 10 other tracked data center(s), run by AdaniConneX, Amazon Web Services, Princeton Digital Group and Sify.

Data center operators in India

Tracked facilities19931 operators
Operational capacity2,276 MW7,840 MW in the pipeline
Yotta rank by capacity#17of 31 operators · 0.8%
Industrial power price82.1 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
AdaniConneX61,033 MW2,000 MW
CtrlS24276 MW1,695 MW
HyperVault2—1,000 MW
STT GDC India34217 MW393 MW
Sify16188 MW290 MW
Amazon Web Services2—473 MW
Princeton Digital Group548 MW382 MW
Nxtra (Airtel)538 MW315 MW

All data centers in India Power and policy in India

Other data centers in Navi Mumbai

  • AdaniConneX Navi Mumbai · AdaniConneX · Planned · 1,000 MW
  • AWS Taloja Navi Mumbai Data Centre · Amazon Web Services · Planned · 473 MW
  • MU2 · Princeton Digital Group · Planned · 120 MW
  • MU1 expansion (three new buildings) · Princeton Digital Group · Under construction · 100 MW
  • Sify Rabale · Sify · Operational · 96.9 MW
  • Mumbai DC6 & DC7 · CtrlS · Planned · 95 MW
  • MUM-3 · Iron Mountain · Under construction · 85 MW
  • ESR Rabale MU1 Data Centre · ESR · Under construction · 60 MW
  • Lumina CloudInfra Airoli Campus · Lumina CloudInfra · Under construction · 60 MW
  • CapitaLand Data Centre Navi Mumbai Tower 1 · CapitaLand · Operational · 50 MW

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Yotta operate?

DC Market Insights tracks 7 Yotta data center(s) in 1 country as of October 2026: 5 operational, 0 under construction and 2 planned.

Which other companies operate data centers in India?

Besides Yotta, the largest operators we track in India by capacity are AdaniConneX, CtrlS, HyperVault, STT GDC India and Sify. The India page lists all 31 operators.

What rules apply to data centers in India?

Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.

Which other data centers are in Navi Mumbai?

Other tracked data centers in Navi Mumbai include AdaniConneX Navi Mumbai (AdaniConneX), AWS Taloja Navi Mumbai Data Centre (Amazon Web Services), MU2 (Princeton Digital Group) and MU1 expansion (three new buildings) (Princeton Digital Group).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst