In short
As of 8 November 2026, DC Market Insights tracks 6 data centers operated by Cyfuture in 1 country, of which 5 are operational. Stated operational capacity is 3 MW, with a further 10 MW under construction and — planned. The pipeline is 3.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Cyfuture data centers: key facts
About Cyfuture
Cyfuture (Cyfuture India Pvt Ltd), founded in 2001 and based in the Noida Special Economic Zone, runs MeitY-empanelled Tier III data centers in India for colocation, cloud and GPU services. Its About page states four data centers: two in Noida, one in Jaipur and one in Raipur; newer pages add a Tier III site in Bangalore with 3 MW of total capacity. In July 2026 it announced a 10 MW direct-to-chip liquid-cooled AI data center in Noida, with go-live scheduled for 31 October 2026.
- Headquarters
- Noida, India
- Founded
- 2001
- Ownership
- Privately held company (Cyfuture India Pvt Ltd); founded and led by Anuj Bairathi, Founder and CEO
- Tracked footprint
- 6 facilities in 1 country
- Website
- cyfuture.com
Data center business
- Cyfuture India Pvt Ltd was one of 19 bidders that submitted proposals on 28 November 2024 for MeitY's IndiaAI Mission request for empanelment of AI compute and cloud service providers, which aimed to make 10,000 GPUs available to startups, researchers and students. IndiaAI (MeitY)
- In June 2016 Cyfuture announced a second Noida data center with an initial investment of INR 50 crore and an initial capacity of 500 racks, next to its existing Tier III sites in Noida and Jaipur. It said it planned to invest INR 250 crore in its data center business over five years and then expand to Bangalore and Mumbai.
- Cyfuture says it hosts four elastic data centers in India, two in Noida, one in Jaipur and one in Raipur, and that it is one of India's few cloud service providers with indigenous MeitY-empanelled data centers at several locations. The company lists PCI-DSS, SOC 1/2/3, ISO 27001, ISO 27017, ISO 20000-9 and ISO 9001 certifications for its infrastructure.
- The Noida data center sits in the Noida Special Economic Zone (NSEZ). Cyfuture describes it as a MeitY-empanelled Tier III facility with two data center floors, more than 500 rack spaces, 10,000 sq ft of usable space per floor and 3.0 MVA of IT load capacity, with N+1 cooling and 48 hours of UPS and diesel backup.
- The Jaipur data center is in the Export Promotion Industrial Park (EPIP), Sitapura Industrial Area. Cyfuture says it is a Tier 3 facility certified to TIA-942 standards and offers domestic and international colocation in a fully secure environment; it was one of the company's first two Tier III sites, with Noida, before the 2016 expansion.
- Cyfuture calls its Bangalore site its fifth and one of its largest data centers: a Tier III certified, MeitY-empanelled facility with two data center floors in a 35,000 sq ft building (about 2,000 sq ft sellable), listed with 3 MW of total capacity available now.
- Cyfuture markets a 10 MW liquid-cooled AI data center in an SEZ location, built for direct-to-chip cooling, rear-door heat exchangers and hybrid zones, with rack densities from about 20 kW to 240 kW+ and duty-free hardware import under SEZ rules. The Cyfuture AI site describes the same project as a phased 100 MW campus with a 20 MW Phase 1; DCMI stores the 10 MW figure given on the Cyfuture and Cyfuture Cloud pages.
- The company's home page states an ambition of 1 GW of AI infrastructure development by 2030 and promotes its Noida data center as its flagship, Tier III certified and MeitY-empanelled site with 2,000+ rack spaces.
Recent updates
- Cyfuture Cloud said its original Noida facility runs 35,000 sq ft of raised floor with access to 5.0 MW of power, and announced a new 10 MW direct-to-chip liquid-cooled AI data center in Noida, scheduled to go live on 31 October 2026, with whole-campus lease options and expansion rights to 30 MW.
- MeitY named Cyfuture India Pvt. Ltd. among the seven bidders that offered commercials for AI compute units (GPUs) in the second IndiaAI Mission compute round, announced as India's common compute capacity crossed 34,000 GPUs. PIB (MeitY)
Company details checked against company and official sources, 8 Nov 2026.
- Capacity under construction or planned (10 MW) is 3.3 times the operational base of 3 MW.
- Its largest operational site is Cyfuture Bangalore Data Center in Bengaluru, India at 3 MW.
- The largest project in the pipeline is Cyfuture Noida Liquid Cooled AI Data Center (10 MW, under construction).
- 2 of 6 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Cyfuture development pipeline
Under construction and planned facilities with a stated capacity, largest first. 10 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Cyfuture Noida Liquid Cooled AI Data CenterCyfuture | Noida, India | Under construction | Colocation | 10 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Cyfuture Noida Liquid Cooled AI Data CenterColocation | Noida, India | Under construction | 10 MW IT | — | Operator / official |
| Cyfuture Bangalore Data CenterColocation | Bengaluru, India | Operational | 3 MW total | — | Operator / official |
| Cyfuture Jaipur Data CenterColocation | Jaipur, India | Operational | — | — | Operator / official |
| Cyfuture Noida Data Center 1Colocation | Noida, India | Operational | — | — | Operator / official |
Cyfuture Noida Data Center 2Colocation
History
|
Noida, India | Operational | — | — | Operator / official |
| Cyfuture Raipur Data CenterColocation | Raipur, India | Operational | — | — | Operator / official |
Market position
How Cyfuture compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In India, Cyfuture ranks #23 of 31 tracked operators by capacity, with 0.1% of the country’s tracked MW.
- India has 199 tracked data centers from 31 operators: 2,276 MW operational and 7,840 MW under construction or planned.
- Industrial electricity in India costs 82.1 USD/MWh (2025, latest official figure).
- Noida also hosts 10 other tracked data center(s), run by AdaniConneX, STT GDC India, Sify and NTT DATA.
Data center operators in India
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AdaniConneX | 6 | 1,033 MW | 2,000 MW |
| CtrlS | 24 | 276 MW | 1,695 MW |
| HyperVault | 2 | — | 1,000 MW |
| STT GDC India | 34 | 217 MW | 393 MW |
| Sify | 16 | 188 MW | 290 MW |
| Amazon Web Services | 2 | — | 473 MW |
| Princeton Digital Group | 5 | 48 MW | 382 MW |
| Nxtra (Airtel) | 5 | 38 MW | 315 MW |
All data centers in India Power and policy in India
Other data centers in Noida
- AdaniConneX Noida · AdaniConneX · Operational · 150 MW
- STT Noida 3 · STT GDC India · Planned · 28 MW
- Sify Noida 02 · Sify · Operational · 25.9 MW
- Noida 2 · NTT DATA · Operational · 22.4 MW
- STT Noida 2 · STT GDC India · Planned · 22 MW
- STT Noida 1 · STT GDC India · Operational · 17 MW
- Sify Noida 01 · Sify · Operational · 11 MW
- Noida DC1 · CtrlS · Operational · 8 MW
- Noida 1 · NTT DATA · Operational · 1.5 MW
- Delhi-NCR Data Center · iron-mountain · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Cyfuture operate?
DC Market Insights tracks 6 Cyfuture data center(s) in 1 country as of November 2026: 5 operational, 1 under construction and 0 planned.
Where is Cyfuture headquartered?
Cyfuture is headquartered in Noida, India. Ownership: Privately held company (Cyfuture India Pvt Ltd); founded and led by Anuj Bairathi, Founder and CEO.
Which other companies operate data centers in India?
Besides Cyfuture, the largest operators we track in India by capacity are AdaniConneX, CtrlS, HyperVault, STT GDC India and Sify. The India page lists all 31 operators.
What rules apply to data centers in India?
Our Power & Policy Tracker lists 17 government actions on data centers and power in India, including 1 restriction(s) and 5 incentive scheme(s) in force.
Which other data centers are in Noida?
Other tracked data centers in Noida include AdaniConneX Noida (AdaniConneX), STT Noida 3 (STT GDC India), Sify Noida 02 (Sify) and Noida 2 (NTT DATA).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.