Proprietary data

Datum Datacentres Data Centers

Data centers operated by Datum Datacentres that we have verified: location, status and capacity, each checked against its source.

In short

As of 9 November 2026, DC Market Insights tracks 4 data centers operated by Datum Datacentres in 1 country, of which 3 are operational.

4Facilities tracked
1Countries
—Operational (3 sites)
—Under construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 4 facilities have a stated capacity; the others are counted as sites only.

Datum FRN1 · Datum Datacentres · Farnborough (approximate location)Datum FRN2 · Datum Datacentres · Farnborough (approximate location)Datum MCR1 · Datum Datacentres · Manchester (approximate location)Datum MCR2 · Datum Datacentres · Manchester (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Datum Datacentres data centers: key facts

About Datum Datacentres

Datum Datacentres is a UK colocation provider with three operational enterprise-grade data centres across two sites, FRN1 at Cody Technology Park in Farnborough (London and south east) and MCR1 and MCR2 in Wythenshawe, Manchester, plus a fourth data centre, FRN2 in Farnborough, under construction and targeted to be operational in 2027. Each site offers up to 1,200 racks at an average 3.5 kW per rack and up to 30 kW per rack.

Headquarters
Farnborough, United Kingdom
Founded
2012
Ownership
Private; Amphora Topco Limited holds 75% or more of shares and votes
Parent company
Amphora Topco Limited
Tracked footprint
4 facilities in 1 country
Website
datum.co.uk

Data center business

  • Datum runs two data centre sites, in the south east (Farnborough) and the north west (Manchester). Its website describes three built and operational data centres across the two UK sites and a fourth data centre under construction. The facilities are carrier neutral and offer colocation, network services, connection to public cloud, service management and engineering services.
  • FRN1, the flagship facility, sits inside the high-security Cody Technology Park in Farnborough, Hampshire. It is built to a Tier 3+ enterprise-grade standard with 22,000 sq ft of technical space and up to 1,200 racks across four data halls, an average rack density of 3.5 kW and support for up to 30 kW per rack, 2N UPS, a design PUE of 1.25 and a pressurised free cooling design. It is accredited to ISO 9001, 14001, 27001 and 50001, PCI DSS and Police-Assured Secure Facilities.
  • In September 2022 Datum bought Teledata, a Manchester colocation and cloud hosting business established in 2004, as its first regional acquisition. The deal added 22,000 sq ft of technical space at the MCR1 data centre, Teledata's network services and its CloudActiv active-active cloud platform, and the site has an NSI Gold approved BS5979 security centre on site.
  • The Manchester campus near Manchester Airport has two buildings: MCR1, launched in 2007, with 22,000 sq ft and 320 racks across five data halls, and MCR2, launched in June 2025, with 24,000 sq ft and up to 1,200 racks. Datum gives the two buildings a combined 50,000+ sq ft of technical space, built to a minimum Tier 3+ standard.
  • MCR2 has a design PUE of 1.25, rooftop solar PV, standby generators in N+1 that run on HVO fuel with at least 72 hours of fuel at full load, power from independent dedicated transformers and a chilled-water system with free cooling. It is designed to support future local heat networks.
  • FRN2 is being built next to FRN1 at Cody Technology Park and will mirror FRN1: up to 1,200 racks across four data halls on two floors, 22,000 sq ft of technical space, 3.5 kW average and up to 30 kW per rack, 2N UPS and a Tier 3+ standard. Construction began in December 2025.
  • The Manchester site has been a LINX point of presence since 2019, and Datum has partnered with LINX for a decade. Datum does not publish megawatt capacity for any of its data centres.

Recent updates

  • FRN2 progress: Alex Baker, MP for Aldershot, toured the Cody Technology Park campus. The steel frame of FRN2 is complete and work has moved to the roof; the building is targeted to be operational in 2027 and will add 22,000 sq ft of technical space.
  • A group from the RICS North West Regional Advisory Board toured MCR2, Datum's newest Manchester data centre, as part of a programme on digital infrastructure skills.
  • FRN2 construction update: the steel structure is up, stair steelwork and precast units are nearly in place and the faceted roof structure is taking shape; drainage, utility corridors and foundations were completed earlier.
  • Datum described the cooling in its new data centres: a fan wall (room-flood) airflow design with N+1 310 kW fan wall cooling units in the service corridor, hot-air return through a ceiling void and automated pressure and temperature sensor control.
  • At a Manchester Tech Week event at its Manchester campus, Datum marked its developments and its LINX partnership; LINX said peak network traffic in Manchester grew 28% in 2025. MCR2 was designed and built with Salute as key partner.
  • MCR2 launched in June 2025 in Manchester with 24,000 sq ft of technical space and up to 1,200 racks across four data halls.

Company details checked against company and official sources, 9 Nov 2026.

  • 0 of 4 facilities have a capacity stated by their source; the totals above count only those.

Facilities

4 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Datum FRN1Colocation Farnborough, United Kingdom Operational — 2012 Operator / official
Datum FRN2Colocation
History
  1. Under construction
  2. Under construction
  3. Under construction
Farnborough, United Kingdom Under construction — — Operator / official
Datum MCR1Colocation
History
  1. Operational
  2. Operational
Manchester, United Kingdom Operational — 2007 Operator / official
Datum MCR2Colocation
History
  1. Operational
  2. Operational
Manchester, United Kingdom Operational — 2025 Operator / official

Market position

How Datum Datacentres compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, Datum Datacentres is one of 54 operators we track.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • Manchester also hosts 7 other tracked data center(s), run by Pulsant, Equinix and iomart.

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
Datum Datacentres rank by capacity#44of 54 operators
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Other data centers in Manchester

  • Manchester NW-1 · Pulsant · Operational · 1 MW
  • Equinix MA1 · Equinix · Operational
  • Equinix MA3 · Equinix · Operational
  • Equinix MA4 · Equinix · Operational
  • Equinix MA5 · Equinix · Operational
  • iomart DC13 Manchester Trafford Wharf · iomart · Operational
  • iomart DC6 and DC7 Manchester City · iomart · Operational

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Datum Datacentres operate?

DC Market Insights tracks 4 Datum Datacentres data center(s) in 1 country as of November 2026: 3 operational, 1 under construction and 0 planned.

Where is Datum Datacentres headquartered?

Datum Datacentres is headquartered in Farnborough, United Kingdom. Ownership: Private; Amphora Topco Limited holds 75% or more of shares and votes.

Which other companies operate data centers in United Kingdom?

Besides Datum Datacentres, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Manchester?

Other tracked data centers in Manchester include Manchester NW-1 (Pulsant), Equinix MA1 (Equinix), Equinix MA3 (Equinix) and Equinix MA4 (Equinix).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst