Proprietary data

iomart Data Centers

Data centers operated by iomart that we have verified: location, status and capacity, each checked against its source.

In short

As of 4 November 2026, DC Market Insights tracks 11 data centers operated by iomart in 1 country, of which 11 are operational.

11Facilities tracked
1Countries
—Operational (11 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 11 facilities have a stated capacity; the others are counted as sites only.

iomart DC1 Glasgow · iomart · Glasgow (approximate location)iomart DC2 Central London · iomart · London (approximate location)iomart DC12 North London · iomart · London (approximate location)iomart DC5 Maidenhead · iomart · Maidenhead (approximate location)iomart DC6 and DC7 Manchester City · iomart · Manchester (approximate location)iomart DC13 Manchester Trafford Wharf · iomart · Manchester (approximate location)iomart DC3 Nottingham · iomart · Nottingham (approximate location)iomart DC4 Leicester · iomart · Leicester (approximate location)iomart DC9 Gosport · iomart · Gosport (approximate location)iomart DC11 York · iomart · York (approximate location)iomart DC8 St Asaph · iomart · Saint Asaph (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

iomart data centers: key facts

About iomart

iomart (Iomart Group plc, AIM: IOM) is a Glasgow-based secure cloud services company that runs a network of 12 wholly-owned UK data centres in 11 locations, from Glasgow and York to Manchester, Nottingham, Leicester, Maidenhead, London, Gosport and St Asaph, linked by about 2,500 km of its own dark fibre (company website, November 2026). The data centres support its colocation, private cloud, backup and disaster recovery services; in Q1 FY27 the Group set up its data centre infrastructure operations as a separate trading entity.

Headquarters
Glasgow, United Kingdom
Founded
1998
Ownership
Listed on AIM (IOM)
Tracked footprint
11 facilities in 1 country
Website
iomart.com

Data center business

  • iomart states it has 12 strategically located, wholly-owned data centres across the UK, each owned and operated by iomart and connected by 2,500 km of dark fibre. Its site list has 11 locations: Glasgow (DC1), Central London (DC2), Nottingham (DC3), Leicester (DC4), Maidenhead (DC5), Manchester City (DC6 Turing House and DC7 Reynolds House), St Asaph (DC8), Gosport (DC9), York (DC11), North London (DC12) and Manchester Trafford Wharf (DC13).
  • Two sites are Tier 3 and the rest Tier 2. Maidenhead DC5 (Spectrum House) is the largest at 2,800 m2 across eleven data halls, with dual 11 kV feeds, six 600 kVA and four 500 kVA UPS units and six 1.5 MVA generators. Central London DC2, in the City of London, is a 1,517 m2 Tier 3 site with six 500 kVA UPS units. iomart does not publish MW per site.
  • Site sizes stated by iomart: North London DC12 (Brent Cross) 1,600 m2 in four data halls; Manchester City DC6 and DC7 1,080 m2 combined; Glasgow DC1 768 m2; Gosport DC9 631 m2; Leicester DC4 620 m2 in two halls; Manchester Trafford Wharf DC13 540 m2; Nottingham DC3 400 m2; York DC11 334 m2; St Asaph DC8 130 m2. Site PUE ranges from 1.2 (Nottingham) to 2.1 (Central London); the network average is given as 1.9.
  • The data centres sit in the Iomart Cloud Services segment, which provides managed cloud hosting, colocation and connectivity through owned UK data centres, including the Oriium and RapidSwitch brands. The Group's other segments are Atech (Microsoft solutions) and Domain & Mass Hosting (Easyspace, Hosting UK, Sonassi). Group revenue was GBP 154.9m in the year to 31 March 2026.
  • Since 2021 iomart has bought REGO-certified renewable electricity for its UK data centre estate. Energy used for its reported emissions was 43,384,336 kWh in 2025-26, down from 47,264,798 kWh in 2024-25. The Group has a data centre PUE target of 1.55. A rooftop solar installation at the Maidenhead data centre, completed in May 2024, produced 245,738 kWh in the year to March 2026.
  • The Board evaluated strategic options for the data centre estate, including consolidation and structural changes, and approved a separate subsidiary to manage the data centre infrastructure assets. The Group says this positions it to maximise long-term value from its infrastructure platform. In colocation it has added High Performance Computing (HPC) hosting, with initial customer wins.

Recent updates

  • Annual report for the year to 31 March 2026 posted to shareholders; it records the Board's decision to set up a separate subsidiary for the data centre infrastructure assets, being actioned in the first half of FY27.
  • Matthew Waymark appointed Chief Financial Officer and Director, effective 14 September 2026, succeeding Scott Cunningham.
  • FY2026 results: revenue up 8% to GBP 154.9m, adjusted EBITDA down to GBP 25.6m, net debt GBP 108.6m. Data Centre Infrastructure operations established as a separate trading entity in Q1 FY27; colocation expanded into HPC hosting.
  • Cooling works completed at the Gosport data centre and a similar replacement started at Glasgow, each expected to cut cooling energy by at least 30%; the Glasgow project received a GBP 0.3m grant from the Scottish Government.
  • On 5 June 2026 iomart extended its GBP 115m revolving credit facility to 30 June 2028.
  • Trading update: softer trading in December and January with higher churn; CFO Scott Cunningham to step down in June 2026; annualised cost savings of over GBP 5.0m achieved.

Company details checked against company and official sources, 4 Nov 2026.

  • 11 facilities publish a PUE figure; the lowest is 1.20 at iomart DC3 Nottingham (iomart) and the median is 1.50.
  • 0 of 11 facilities have a capacity stated by their source; the totals above count only those.

Facilities

11 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
iomart DC1 GlasgowColocation
History
  1. Operational
  2. Operational
Glasgow, United Kingdom Operational — — Operator / official
iomart DC11 YorkColocation York, United Kingdom Operational — — Operator / official
iomart DC12 North LondonColocation London, United Kingdom Operational — — Operator / official
iomart DC13 Manchester Trafford WharfColocation Manchester, United Kingdom Operational — — Operator / official
iomart DC2 Central LondonColocation London, United Kingdom Operational — — Operator / official
iomart DC3 NottinghamColocation Nottingham, United Kingdom Operational — — Operator / official
iomart DC4 LeicesterColocation Leicester, United Kingdom Operational — — Operator / official
iomart DC5 MaidenheadColocation
History
  1. Operational
  2. Operational
Maidenhead, United Kingdom Operational — — Operator / official
iomart DC6 and DC7 Manchester CityColocation Manchester, United Kingdom Operational — — Operator / official
iomart DC8 St AsaphColocation Saint Asaph, United Kingdom Operational — — Operator / official
iomart DC9 GosportColocation
History
  1. Operational
  2. Operational
Gosport, United Kingdom Operational — — Operator / official

Market position

How iomart compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United Kingdom, iomart is one of 54 operators we track.
  • United Kingdom has 197 tracked data centers from 54 operators: 1,025 MW operational and 7,741 MW under construction or planned.
  • Industrial electricity in United Kingdom costs 234 USD/MWh (2026, latest official figure).
  • Manchester also hosts 7 other tracked data center(s), run by Pulsant, Datum Datacentres and Equinix.

Data center operators in United Kingdom

Tracked facilities19754 operators
Operational capacity1,025 MW7,741 MW in the pipeline
iomart rank by capacity#42of 54 operators
Industrial power price234 USD/MWh2026
OperatorFacilitiesOperational MWPipeline MW
Apatura7—2,100 MW
Elsham Tech Park Ltd (Greystoke)1—1,000 MW
QTS1—720 MW
ILI Group1—600 MW
Ark Data Centres10275 MW314 MW
Humber Tech Park1—386 MW
Slough Holdings UK1—300 MW
Equinix15—250 MW

All data centers in United Kingdom Power and policy in United Kingdom

Other data centers in Manchester

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does iomart operate?

DC Market Insights tracks 11 iomart data center(s) in 1 country as of November 2026: 11 operational, 0 under construction and 0 planned.

Where is iomart headquartered?

iomart is headquartered in Glasgow, United Kingdom. Ownership: Listed on AIM (IOM).

Which other companies operate data centers in United Kingdom?

Besides iomart, the largest operators we track in United Kingdom by capacity are Apatura, Elsham Tech Park Ltd (Greystoke), QTS, ILI Group and Ark Data Centres. The United Kingdom page lists all 54 operators.

What rules apply to data centers in United Kingdom?

Our Power & Policy Tracker lists 13 government actions on data centers and power in United Kingdom, including 1 restriction(s) and 1 incentive scheme(s) in force.

Which other data centers are in Manchester?

Other tracked data centers in Manchester include Manchester NW-1 (Pulsant), Datum MCR1 (Datum Datacentres), Datum MCR2 (Datum Datacentres) and Equinix MA1 (Equinix).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst