In short
As of 9 November 2026, DC Market Insights tracks 6 data centers operated by Key Point Group in 1 country, of which 3 are operational. Stated operational capacity is 10 MW, with a further 20 MW under construction and — planned. The pipeline is 2.0 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 2 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Key Point Group data centers: key facts
- Capacity under construction or planned (20 MW) is 2.0 times the operational base of 10 MW.
- Its largest operational site is Key Point Vladivostok (TOR Nadezhdinskaya) in Vladivostok, Russia at 10 MW.
- The largest project in the pipeline is Key Point Saint Petersburg (20 MW, under construction).
- 2 of 6 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Key Point Group development pipeline
Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and — planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Key Point Saint PetersburgKey Point Group | Saint Petersburg, Russia | Under construction | Colocation | 20 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Key Point Saint PetersburgColocation
History
|
Saint Petersburg, Russia | Under construction | 20 MW total | — | Trade press |
| Key Point Vladivostok (TOR Nadezhdinskaya)Colocation | Vladivostok, Russia | Operational | 10 MW total | 2023 | Trade press |
Key Point Craft (Sverdlovsk Oblast)Colocation
History
|
Russia | Operational | — | — | Operator / official |
| Key Point MakhachkalaColocation | Makhachkala, Russia | Planned | — | — | Trade press |
| Key Point NovosibirskColocation | Novosibirsk, Russia | Operational | — | 2024 | Trade press |
| Key Point Rostov-on-DonColocation | Rostov-on-Don, Russia | Planned | — | — | Trade press |
Market position
How Key Point Group compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Russia, Key Point Group ranks #9 of 21 tracked operators by capacity, with 3.6% of the country’s tracked MW.
- Russia has 111 tracked data centers from 21 operators: 466 MW operational and 375 MW under construction or planned.
- Vladivostok also hosts 1 other tracked data center(s), run by Rostelecom-DPC (RTK-DPC).
Data center operators in Russia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| IXcellerate | 10 | 128 MW | 74 MW |
| Yandex | 5 | 63 MW | 40 MW |
| Atomdata (Rosatom) | 7 | 102 MW | — |
| MonArch group of companies | 1 | — | 100 MW |
| Sber | 3 | 29.9 MW | 60 MW |
| MTS Web Services (MWS) | 6 | 32 MW | 20 MW |
| Rostelecom-DPC (RTK-DPC) | 24 | 50.2 MW | — |
| Selectel | 7 | 11 MW | 20 MW |
All data centers in Russia Power and policy in Russia
Other data centers in Vladivostok
- RTK-DPC Vladivostok · Rostelecom-DPC (RTK-DPC) · Operational
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Key Point Group operate?
DC Market Insights tracks 6 Key Point Group data center(s) in 1 country as of November 2026: 3 operational, 1 under construction and 2 planned.
Which other companies operate data centers in Russia?
Besides Key Point Group, the largest operators we track in Russia by capacity are IXcellerate, Yandex, Atomdata (Rosatom), MonArch group of companies and Sber. The Russia page lists all 21 operators.
What rules apply to data centers in Russia?
Our Power & Policy Tracker lists 10 government actions on data centers and power in Russia, including 2 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Vladivostok?
Other tracked data centers in Vladivostok include RTK-DPC Vladivostok (Rostelecom-DPC (RTK-DPC)).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?