Proprietary data

Selectel Data Centers

Data centers operated by Selectel that we have verified: location, status and capacity, each checked against its source.

In short

As of 18 November 2026, DC Market Insights tracks 7 data centers operated by Selectel in 1 country, of which 6 are operational. Stated operational capacity is 11 MW, with a further 20 MW under construction and — planned. The pipeline is 1.8 times the capacity already operating.

7Facilities tracked
1Countries
11 MWOperational (6 sites)
20 MWUnder construction (1 site)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 2 of 7 facilities have a stated capacity; the others are counted as sites only.

Selectel Berzarina · Selectel · Moscow (approximate location)Selectel Yurlovsky · Selectel · Moscow (approximate location)Selectel Tsvetochnaya 1 · Selectel · Saint Petersburg (approximate location)Selectel Tsvetochnaya 2 · Selectel · Saint Petersburg (approximate location)Selectel Dubrovka 1 · Selectel · Dubrovka (approximate location)Selectel Dubrovka 2 · Selectel · Dubrovka (approximate location)Selectel Dubrovka 3 · Selectel · Dubrovka (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Selectel data centers: key facts

About Selectel

Selectel (JSC Selectel) is a Russian IT-infrastructure and cloud provider founded in 2008 in Saint Petersburg. Its investor site states four own data center sites (ЦОД) in Moscow, Saint Petersburg and the Leningrad Region, 1,400 staff and 53,500 clients; the company had 3,612 racks at the end of 2025. Its company blog names six Tier III-standard data centers: Berzarina (Moscow), Tsvetochnaya 1 and 2 (Saint Petersburg) and Dubrovka 1, 2 and 3 (Leningrad Region), with a fourth site, Yurlovsky in Moscow, in development since 2022.

Headquarters
Saint Petersburg, Russia
Founded
2008
Ownership
Private (JSC Selectel); 25% bought by Catalytic People, a T-Technologies/Interros JV, Dec 2025
Tracked footprint
7 facilities in 1 country
Website
selectel.ru

Data center business

  • Data center services (colocation and rack rental) were RUB 1.2bn or 8% of revenue in the first nine months of 2026, up 10% year on year; cloud infrastructure services were 87%. Capital spending in the period was RUB 11.4bn, of which RUB 2.9bn went to data center infrastructure and RUB 8.2bn to servers.
  • Tsvetochnaya 2 in Saint Petersburg was launched on 17 December 2015 in a former 'Pozitiv' photo-materials factory building. Two of its four floors hold server halls; it is fed from a district substation through eight 2,000 kVA and two 2,500 kVA transformers. Dubrovka 1 replaced its chillers with free cooling.
  • The company blog lists six Selectel data centers that meet the Uptime Institute Tier III standard: Berzarina (Moscow), Tsvetochnaya 1, Tsvetochnaya 2, Dubrovka 1, Dubrovka 2 and Dubrovka 3 (Saint Petersburg and Leningrad Region). Berzarina uses free cooling with adiabatic chilling; Dubrovka 1 has four Gesan diesel generators in a 3+1 scheme; Dubrovka 3 uses free cooling.
  • Berzarina (Moscow): 7,000 m2 with space for 1,500 racks and 11 MW total supplied power, Tier III level, three server halls on three floors. Selectel bought the whole Berzarina building complex in 2022 for RUB 1.312bn, after which it owned all buildings housing its data centers. The second phase of Berzarina (1,200 m2, 350 racks, 2.5 MW design power, design PUE 1.15) opened in March 2019.
  • Selectel's investor site gives the company four own data center sites ("4 собственные площадки ЦОД"), 50+ products, 53,500 clients and 1,400 employees, of whom more than 800 work on product development. Its investor presentation for 2025 describes the four sites as Tier III-standard data centers, except the Tsvetochnaya-1 building.
  • Company history (investor site): 2008 – Selectel founded and its first data center opened in Saint Petersburg (Tsvetochnaya), with rack rental and server colocation; 2009 – second data center opened in Moscow (Berzarina); 2010 – third data center opened in the Leningrad Region (Dubrovka); 2015 – Tsvetochnaya site expanded; 2022 – development of a fourth site in Moscow (Yurlovsky) began.
  • Rack count stated by the company: 1,530 racks in 2018, 3,500 in 2023 and 3,612 in 2025. Clients over the same years: 15,100, 24,000 and 32,900; revenue RUB 1.8bn, 10.2bn and 18.3bn.

Recent updates

  • 11 Nov 2026: 9M 2026 results – revenue RUB 15.9bn (+18%), adjusted EBITDA RUB 8.6bn, net profit RUB 2.8bn, 53,500 clients at end-September; net debt to LTM adjusted EBITDA 2.6x as investment rose.
  • 8 Oct 2026: Selectel raised its planned investment in products for AI projects to RUB 25bn up to 2031 (from RUB 10bn announced in 2025); cloud GPU revenue for 9M 2026 grew 2.6 times year on year.
  • 6 Oct 2026: Selectel placed two bond issues on the Moscow Exchange (001P-09R floating, RUB 8bn; 001P-10R fixed 16.25%, RUB 2bn), RUB 10bn in total, to fund its investment programme.
  • 17 Sep 2026: Selectel agreed to buy 100% of cloud provider M1Cloud (OOO Stek Grupp) for up to RUB 2.6bn; M1Cloud runs private clouds in partner data centers in Moscow. The 9M 2026 presentation says the deal closed in September.
  • 21 Aug 2026: 1H 2026 revenue RUB 10.2bn (+14%), with 44,500 clients at end-June.
  • 29 Dec 2025: Catalytic People, a joint venture of T-Technologies and Interros, bought 25% of JSC Selectel from existing shareholders for about RUB 16bn.

Company details checked against company and official sources, 18 Nov 2026.

  • Capacity under construction or planned (20 MW) is 1.8 times the operational base of 11 MW.
  • Its largest operational site is Selectel Berzarina in Moscow, Russia at 11 MW.
  • The largest project in the pipeline is Selectel Yurlovsky (20 MW, under construction).
  • 2 of 7 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational11 MW
Under construction20 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Selectel development pipeline

Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and — planned in total.

ProjectLocationStatusTypeCapacity
Selectel YurlovskySelectel Moscow, Russia Under construction Colocation 20 MW

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Selectel YurlovskyColocation Moscow, Russia Under construction 20 MW total — Trade press
Selectel BerzarinaColocation
History
  1. Operational
  2. Operational
  3. Operational
  4. Operational
Moscow, Russia Operational 11 MW total 2009 Operator / official
Selectel Dubrovka 1Colocation
History
  1. Operational
  2. Operational
Dubrovka, Russia Operational — 2010 Operator / official
Selectel Dubrovka 2Colocation Dubrovka, Russia Operational — — Operator / official
Selectel Dubrovka 3Colocation Dubrovka, Russia Operational — — Operator / official
Selectel Tsvetochnaya 1Colocation
History
  1. Operational
  2. Operational
Saint Petersburg, Russia Operational — 2008 Operator / official
Selectel Tsvetochnaya 2Colocation
History
  1. Operational
  2. Operational
Saint Petersburg, Russia Operational — 2015 Operator / official

Market position

How Selectel compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Russia, Selectel ranks #8 of 21 tracked operators by capacity, with 3.7% of the country’s tracked MW.
  • Russia has 111 tracked data centers from 21 operators: 466 MW operational and 375 MW under construction or planned.

Data center operators in Russia

Tracked facilities11121 operators
Operational capacity466 MW375 MW in the pipeline
Selectel rank by capacity#8of 21 operators · 3.7%
Renewable share of generation17.6%2025
OperatorFacilitiesOperational MWPipeline MW
IXcellerate10128 MW74 MW
Yandex563 MW40 MW
Atomdata (Rosatom)7102 MW—
MonArch group of companies1—100 MW
Sber329.9 MW60 MW
MTS Web Services (MWS)632 MW20 MW
Rostelecom-DPC (RTK-DPC)2450.2 MW—
Key Point Group610 MW20 MW

All data centers in Russia Power and policy in Russia

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Selectel operate?

DC Market Insights tracks 7 Selectel data center(s) in 1 country as of November 2026: 6 operational, 1 under construction and 0 planned.

Where is Selectel headquartered?

Selectel is headquartered in Saint Petersburg, Russia. Ownership: Private (JSC Selectel); 25% bought by Catalytic People, a T-Technologies/Interros JV, Dec 2025.

Which other companies operate data centers in Russia?

Besides Selectel, the largest operators we track in Russia by capacity are IXcellerate, Yandex, Atomdata (Rosatom), MonArch group of companies and Sber. The Russia page lists all 21 operators.

What rules apply to data centers in Russia?

Our Power & Policy Tracker lists 10 government actions on data centers and power in Russia, including 2 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst