Data Center Power & Policy in Russia

Every government action on data centers and power in Russia that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.

In short

As of 15 November 2026, DC Market Insights tracks 10 government actions on data centers and power in Russia, 9 of them in force. Russia has 2 restrictions on new data centers in force, the latest: Government Resolution 936: crypto mining banned in Moscow, Moscow Oblast and western Kursk Oblast to 2032.

10Actions tracked
9In force
—Industrial power price
17.6%Renewable share of generation

Market snapshot

Russia power and policy: key facts

  • Renewable share of electricity generation: 17.6% (2025). Rank 35 of 43 tracked countries, highest first.
  • Latest change: Rosseti: declared capacity of computing centres connected to its grid (PJSC Rosseti, 15 Oct 2026).
  • By type: 4 grid access, 3 regulation, 2 restriction and 1 power tariff.

Power indicators for Russia

Latest official figure for each indicator, with earlier years where we have them.

Renewable share of electricity generation 17.6% 2025 · Share of generation in the UES of Russia, 2025: hydro 16.7% + wind 0.6% + solar 0.3% (System Operator operating data). Nuclear (18.7%) not counted. System Operator of the UES (SO UPS): operating data for 2025

In force now in Russia

Restriction (2)

  • RestrictionIn force

    Government Resolution 936: crypto mining banned in Moscow, Moscow Oblast and western Kursk Oblast to 2032

    Government Resolution No. 936 of 25 July 2026 amends Resolution 1869 and bans digital currency mining from 15 August 2026 to 31 December 2032 in Moscow, Moscow Oblast and eight districts of Kursk Oblast (Belovsky, Bolshesoldatsky, Glushkovsky, Korenevsky, Lgovsky, Rylsky, Sudzhansky, Khomutovsky) and the town of Lgov.

    Government of the Russian Federation · Moscow, Moscow Oblast, Kursk Oblast · Effective 15 Aug 2026 · Ends 31 Dec 2032

  • RestrictionIn force

    Government Resolution 1869: ban on crypto mining in 10 regions until 15 March 2031

    Government Resolution No. 1869 of 23 December 2024 bans digital currency mining (including mining pools) in listed regions. Year-round ban from 1 January 2025 to 15 March 2031 in Dagestan, Ingushetia, Chechnya, Kabardino-Balkaria, Karachay-Cherkessia, North Ossetia, Zaporizhzhia, Kherson, Donetsk and Luhansk (points 4-13 of the list); seasonal ban (15 November to 15 March each winter) in parts of Irkutsk Oblast, Buryatia and Zabaykalsky Krai.

    Government of the Russian Federation · Effective 1 Jan 2025 · Ends 15 Mar 2031 · Rossiyskaya Gazeta (official publication): Government Resolution of 23 December 2024 No. 1869

Grid access (4)

  • Grid accessIn force

    Rosseti: declared capacity of computing centres connected to its grid

    Rosseti said 195 computing centres are already connected to its grid, with declared capacity of 2.4 GW. It said this declared capacity has tripled over the last four years. It gave the figure next to its queue of pending applications.

    2.4 GW Declared (contracted) capacity, not actual consumption. Status in_force is used only as a placeholder for a reported current figure.

    PJSC Rosseti

  • Grid accessIn force

    Rosseti: pending grid connection applications from computing centres

    At Russian Energy Week 2026, Rosseti deputy CEO Alexey Molsky said the group has 134 applications from computing centres, at various stages, totalling 3.3 GW. He said several investors often apply for capacity aimed at the same customer, so the real demand is smaller. He also backed the fourth reliability category and take-or-pay for all consumers.

    3.3 GW A queue snapshot stated by Rosseti management at Russian Energy Week. The stages range from applications to signed contracts. Rosseti covers only its own group's grids. Status in_force is used only as a placeholder for a reported current figure.

    PJSC Rosseti

  • Grid accessIn force

    First fourth-category grid connection issued to a data center in Moscow and Moscow Oblast

    Valery Seleznev, first deputy chair of the State Duma energy committee, said one connection had been issued to a data center in Moscow and Moscow Oblast under the fourth reliability category. No data center there was yet connected under it. He put the facility at about 30 MW. He said Murmansk Oblast had received two data center connection applications under this category.

    30 MW The capacity is approximate ('порядка'). The operator is not named. Status in_force is used only as a placeholder for a reported figure.

    State Duma Committee on Energy (statement)

  • Grid accessIn force

    Resolution 1300: large consumers may connect under IV category regardless of deferral conditions

    The same October 2026 government resolution lets large consumers connect under the IV reliability category even when deferral conditions apply to their connection, to speed up connection. Consumers connecting under the IV category no longer need to prepare an external power supply scheme.

    Government of the Russian Federation; Ministry of Energy

Regulation (3)

  • RegulationIn force

    Government Resolution 1932: rules for the register of data centers located in Russia

    Government Resolution No. 1932 of 28 November 2025 approves the rules for forming and keeping the register of data centers located in the Russian Federation, including the requirements a data center must meet to be included and the procedure for inclusion, changes and exclusion. Published 1 December 2025; in force from 1 March 2026.

    Government of the Russian Federation · Effective 1 Mar 2026

  • RegulationIn force

    Federal Law 244-FZ: legal definition of data centers, national data center register and mining ban in registered data centers

    Federal Law No. 244-FZ of 23 July 2025 amends the Law on Communications to define a data center (a set of buildings, parts of buildings or premises with engineering systems used to house data processing and storage equipment). The federal communications authority keeps a register of data centers located in Russia under rules set by the Government, and placing mining infrastructure in registered data centers is prohibited. The data center articles took effect on 1 March 2026.

    Federal Assembly / President of the Russian Federation · Effective 1 Mar 2026

  • RegulationIn force

    Personal data localization (Federal Law 152-FZ, Article 18 part 5, as amended by 242-FZ)

    Operators collecting personal data of Russian citizens must record, systematize, accumulate, store, update and retrieve it using databases located in Russia (Article 18 part 5 of Federal Law 152-FZ on Personal Data, added by Federal Law 242-FZ of 21 July 2014, in force since 1 September 2015).

    Federal Assembly / President of the Russian Federation · Effective 1 Sep 2015

Announced and proposed

Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.

  • Power tariffProposed

    Ministry of Energy proposal: phased take-or-pay grid transmission charges for data centers

    The Ministry of Energy has proposed to the Government that data centers move gradually to paying for electricity transmission on a share of their maximum (reserved) capacity: 70% from connection for 670 kW-5 MW; rising from 15% to 70% over four years for 5-50 MW; from 10% to 70% over six years above 50 MW. An earlier version proposed 90% of maximum capacity for data centers and miners from 2027. Not yet adopted.

    70 % minimum billed share of maximum capacity at end of phase-in

    Ministry of Energy of the Russian Federation

Timeline of data center and power policy in Russia

DateActionTypeStatusAuthority
15 Oct 2026Rosseti: declared capacity of computing centres connected to its gridGrid accessIn forcePJSC Rosseti
15 Oct 2026Rosseti: pending grid connection applications from computing centresGrid accessIn forcePJSC Rosseti
8 Oct 2026First fourth-category grid connection issued to a data center in Moscow and Moscow OblastGrid accessIn forceState Duma Committee on Energy (statement)
6 Oct 2026Resolution 1300: large consumers may connect under IV category regardless of deferral conditionsGrid accessIn forceGovernment of the Russian Federation; Ministry of Energy
25 Jul 2026Government Resolution 936: crypto mining banned in Moscow, Moscow Oblast and western Kursk Oblast to 2032 Moscow, Moscow Oblast, Kursk OblastRestrictionIn forceGovernment of the Russian Federation
26 May 2026Ministry of Energy proposal: phased take-or-pay grid transmission charges for data centersPower tariffProposedMinistry of Energy of the Russian Federation
28 Nov 2025Government Resolution 1932: rules for the register of data centers located in RussiaRegulationIn forceGovernment of the Russian Federation
23 Jul 2025Federal Law 244-FZ: legal definition of data centers, national data center register and mining ban in registered data centersRegulationIn forceFederal Assembly / President of the Russian Federation
23 Dec 2024Government Resolution 1869: ban on crypto mining in 10 regions until 15 March 2031RestrictionIn forceGovernment of the Russian Federation
21 Jul 2014Personal data localization (Federal Law 152-FZ, Article 18 part 5, as amended by 242-FZ)RegulationIn forceFederal Assembly / President of the Russian Federation

How Russia compares

Latest official figures for the countries we track.

CountryIndustrial power priceRenewable shareGrid emission factorRestrictions in forceIncentives in force
Argentina—19.6% (2025)0.28 kgCO2/kWh (2022)02
Australia—39% (2025)—02
Austria169 USD/MWh (2026)78% (2025)0.15 kgCO2/kWh (2023)00
Bangladesh—2% (2025)—00
Belgium183 USD/MWh (2025)34.3% (2025)0.19 kgCO2/kWh (2024)00
Brazil—86.8% (2025)0.07 kgCO2/kWh (2025)01
Canada—63.9% (2024)0.10 kgCO2/kWh (2022)60
Chile—66% (2025)0.24 kgCO2/kWh (2023)00
China—38% (2025)0.53 kgCO2/kWh (2023)20
Colombia——0.22 kgCO2/kWh (2024)02
Denmark134 USD/MWh (2025)81.5% (2024)0.11 kgCO2/kWh (2024)10
Ecuador——0.16 kgCO2/kWh (2024)10
Finland58.4 USD/MWh (2025)57% (2024)0.03 kgCO2/kWh (2025)00
France104 USD/MWh (2025)27% (2025)0.02 kgCO2/kWh (2025)01
Germany180 USD/MWh (2025)58.8% (2025)0.34 kgCO2/kWh (2025)10
Guatemala84.5 USD/MWh (2025)53.5% (2024)0.29 kgCO2/kWh (2024)02
Hong Kong180 USD/MWh (2026)—0.59 kgCO2/kWh (2025)02
Iceland42.9 USD/MWh (2022)100% (2026)—12
India82.1 USD/MWh (2025)28.7% (2026)0.68 kgCO2/kWh (2025)15
Indonesia62.9 USD/MWh (2024)16.3% (2025)0.68 kgCO2/kWh (2024)01
Ireland234 USD/MWh (2025)41.3% (2024)0.20 kgCO2/kWh (2025)20
Italy184 USD/MWh (2025)48% (2025)0.20 kgCO2/kWh (2025)00
Japan—23.1% (2024)0.45 kgCO2/kWh (2024)00
Kazakhstan—14.6% (2025)0.81 kgCO2/kWh (2025)00
Kyrgyzstan41.7 USD/MWh (2026)88% (2024)0.16 kgCO2/kWh (2019)11
Luxembourg165 USD/MWh (2025)23.3% (2025)—00
Malaysia105 USD/MWh (2026)21% (2025)0.74 kgCO2/kWh (2024)11
Mexico——0.44 kgCO2/kWh (2023)00
Nepal———00
Netherlands148 USD/MWh (2025)49% (2025)0.20 kgCO2/kWh (2024)40
Pakistan97.5 USD/MWh (2026)34.7% (2025)—01
Panama66.3 USD/MWh (2025)74.7% (2025)0.15 kgCO2/kWh (2024)01
Paraguay33.0 USD/MWh (2026)——12
Peru—62.6% (2025)—01
Philippines—22.2% (2024)0.71 kgCO2/kWh (2017)12
Russia—17.6% (2025)—20
Singapore189 USD/MWh (2025)2.1% (2024)0.40 kgCO2/kWh (2024)10
South Africa—9% (2024)—11
South Korea—9.8% (2025)—00
Spain113 USD/MWh (2025)55.5% (2025)—10
Sri Lanka—60.2% (2025)—00
Sweden78.5 USD/MWh (2025)—0.06 kgCO2/kWh (2023)00
Switzerland240 USD/MWh (2026)70.8% (2025)0.13 kgCO2/kWh (2022)00
Taiwan—12.7% (2025)0.47 kgCO2/kWh (2024)10
Thailand120 USD/MWh (2026)—0.48 kgCO2/kWh (2026)02
Türkiye70.3 USD/MWh (2026)—0.44 kgCO2/kWh (2022)11
United Arab Emirates120 USD/MWh (2026)8.8% (2024)0.47 kgCO2/kWh (2024)00
United Kingdom234 USD/MWh (2026)52.1% (2025)0.15 kgCO2/kWh (2026)11
United States86.2 USD/MWh (2025)24% (2025)0.35 kgCO2/kWh (2023)01
Uruguay101 USD/MWh (2026)98% (2025)0.01 kgCO2/kWh (2025)03
Uzbekistan83.3 USD/MWh (2026)19.4% (2025)—10
Venezuela—77% (2023)—01

Questions

Is there a data center moratorium in Russia?

Yes. 2 restrictions on new data centers are in force in Russia: Government Resolution 936: crypto mining banned in Moscow, Moscow Oblast and western Kursk Oblast to 2032 (Moscow, Moscow Oblast, Kursk Oblast) and Government Resolution 1869: ban on crypto mining in 10 regions until 15 March 2031.

How much of Russia’s electricity is renewable?

Renewables supplied 17.6% of electricity generation in Russia in 2025.

Where does this data come from?

Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.

What counts as a restriction or moratorium?

A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.

How are power prices compared?

We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.

How often is it updated?

Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.