MERLIN Edged (MERLIN Properties / Edged Energy) Data Centers

Data centers operated by MERLIN Edged (MERLIN Properties / Edged Energy) that we have verified: location, status and capacity, each checked against its source.

In short

As of 15 November 2026, DC Market Insights tracks 5 data centers operated by MERLIN Edged (MERLIN Properties / Edged Energy) in 1 country, of which 1 are operational.

5Facilities tracked
1Countries
—Operational (1 site)
—Under construction (2 sites)
—Planned (2 sites)

MW = IT capacity where the source states it, otherwise total capacity. 0 of 5 facilities have a stated capacity; the others are counted as sites only.

Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

MERLIN Edged (MERLIN Properties / Edged Energy) data centers: key facts

  • By type, the tracker lists 3 other and 2 hyperscale facilities.
  • 0 of 5 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Other3
Hyperscale2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Facilities

5 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
ARA 01Other Arasur, Spain Under construction — — Operator / official
ARA 02Other Arasur, Spain Under construction — — Operator / official
ARA 03Other Arasur, Spain Operational — — Operator / official
Navalmoral de la Mata campusHyperscale Navalmoral de la Mata, Spain Planned — — Operator / official
Valdecaballeros campusHyperscale Valdecaballeros, Spain Planned — — Operator / official

Market position

How MERLIN Edged (MERLIN Properties / Edged Energy) compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Spain, MERLIN Edged (MERLIN Properties / Edged Energy) is one of 11 operators we track.
  • Spain has 19 tracked data centers from 11 operators: 29.4 MW operational and 125 MW under construction or planned.
  • Industrial electricity in Spain costs 113 USD/MWh (2025, latest official figure).

Data center operators in Spain

Tracked facilities1911 operators
Operational capacity29.4 MW125 MW in the pipeline
MERLIN Edged (MERLIN Properties / Edged Energy) rank by capacity#6of 11 operators
Industrial power price113 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Ark Data Centres1—65 MW
Prime Data Centers1—40 MW
Iron Mountain33 MW20 MW
CyrusOne118 MW—
EdgeConneX18.4 MW—
Microsoft3——
DayOne1——
Cogent1——

All data centers in Spain Power and policy in Spain

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does MERLIN Edged (MERLIN Properties / Edged Energy) operate?

DC Market Insights tracks 5 MERLIN Edged (MERLIN Properties / Edged Energy) data center(s) in 1 country as of November 2026: 1 operational, 2 under construction and 2 planned.

Which other companies operate data centers in Spain?

Besides MERLIN Edged (MERLIN Properties / Edged Energy), the largest operators we track in Spain by capacity are Ark Data Centres, Prime Data Centers, Iron Mountain, CyrusOne and EdgeConneX. The Spain page lists all 11 operators.

What rules apply to data centers in Spain?

Our Power & Policy Tracker lists 9 government actions on data centers and power in Spain, including 1 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst