Every data center in Spain that we have verified: operator, location, status and capacity, each checked against its source.
By Amit JainReviewed by Deepti AgrawalUpdated 26 Nov 2026
In short
As of 26 November 2026, DC Market Insights tracks 41 data centers in Spain run by 19 operators: 20 operational, 3 under construction and 18 planned. Stated operational capacity is 79.4 MW, with a further 65 MW under construction and 750 MW planned. Data4 holds the largest share of tracked operational capacity (63%).
41Facilities tracked
19Operators
79.4 MWOperational (20 sites)
65 MWUnder construction (3 sites)
750 MWPlanned (18 sites)
MW = IT capacity where the source states it, otherwise total capacity. 13 of 41 facilities have a stated capacity; the others are counted as sites only.
OperationalUnder constructionPlannedPin = exact site location; dot = city (approximate)
Market snapshot
Spain data center market: key facts
Capacity under construction or planned (815 MW) is 10.3 times the operational base of 79.4 MW.
The three largest operators by operational capacity, Data4, CyrusOne and EdgeConneX, hold 96% of tracked operational MW.
Tillion has the largest development pipeline in Spain: 300 MW under construction or planned.
The largest operational facility we track is Data4 MAD01 Alcobendas (Data4, Alcobendas) at 50 MW.
The largest project in the pipeline is Tillion Aragón campus (300 MW, planned).
Zaragoza is the largest cluster: 11 of 41 facilities and 69% of tracked capacity.
By type, the tracker lists 20 colocation, 17 hyperscale and 4 other facilities.
13 of 41 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational79.4 MW
Under construction65 MW
Planned750 MW
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Largest operators in Spain by tracked capacity, MW
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Market context
What shapes the Spain data center market
Policy, power, land and demand, each statement checked against its source. Reviewed 19 October 2026. Government sources are linked; the full source list comes with the Excel data.
Spain is drafting one of Europe's strictest data centre rules: a MITECO Royal Decree (consultation Aug-Sep 2026) would require data centres of 1 MW or more to cover at least 80% of each hour's consumption with same-hour renewable power, meet EU category A for PUE and WUE and keep data in the EU. Grid access for large loads is tight: more than 6 GW of transmission access has been granted, with about 6 GW more on distribution, and crowded nodes are allocated by tender. MITECO, MAIN of the draft Royal Decree on data centres
Policy and incentives
MITECO's draft Royal Decree on data centre sustainability, resilience and digital sovereignty sets an 80% hourly renewable cover, additionality (new renewable MW within 18 months before start-up), EU rating category A for PUE and WUE, and EU establishment and data residency for operators of data centres above 1 MW. MITECO
Non-compliance under the draft decree would bring surcharges on access tolls and system charges starting at 65% and rising 10 points per consecutive year, and in serious repeated cases loss of grid access and connection permits. MITECO MAIN
Royal Decree-law 7/2026 (in force 22 Mar 2026) includes an additional provision on energy, environmental, resilience and digital sovereignty requirements for data processing centres, which the draft Royal Decree develops. Ministerio de Hacienda normative repository
Power and grid
MITECO's impact report counts more than 6 GW of transmission access capacity granted, plus about 6 GW on distribution grids; the national AI strategy expects 2.5 GW of computing by 2030, or 3.5 to 4 GW of electricity demand. MITECO MAIN
Since 22 Mar 2026 demand access permits at 1 kV or more carry a capacity-reservation charge until the load starts, and applicants must declare the CNAE activity code (RDL 7/2026). Ministerio de Hacienda normative repository
The first demand access tender at congested transmission nodes, resolved on 24 Feb 2026, awarded capacity at five nodes, the largest 500 MW at Brazatortas 400 kV. BOE-A-2026-4357
Power prices and tariffs
Large industrial users (band ID, excl. taxes) paid EUR 0.1016/kWh in 2025-S1, EUR 0.0991/kWh in 2025-S2 and EUR 0.0959/kWh in 2026-S1 (Eurostat). Eurostat
2026 network tolls for the 6.4TD tariff (145 kV and above) are EUR 6.606205/kW-year (P1 power) and EUR 0.008427/kWh (P1 energy), set by the CNMC on 18 Dec 2025, plus system charges under Order TED/1524/2025. BOE-A-2025-26348
Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
A second analyst re-opens each source before a facility is published.
Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers are there in Spain?
DC Market Insights tracks 41 data centers in Spain as of November 2026: 20 operational, 3 under construction and 18 planned, run by 19 operators. The count grows as we verify more sites.
What is the data center capacity of Spain?
Tracked operational capacity in Spain is 79.4 MW, with 65 MW under construction and 750 MW planned. These totals use the capacity each source states (IT load where given) and cover 13 of 41 tracked facilities.
Which companies operate the most data center capacity in Spain?
By tracked operational capacity, the largest operators in Spain are Data4 (50 MW), CyrusOne (18 MW) and EdgeConneX (8.4 MW).
Where are the data centers in Spain located?
The largest clusters by tracked capacity are Zaragoza (11 facilities), Madrid (14 facilities) and Barcelona (6 facilities). The map above shows every site.
Which new data centers are being built in Spain?
We track 65 MW under construction and 750 MW planned. The largest projects are Tillion Aragón campus (300 MW), Green It Aragón campus (Ribera Alta del Ebro) by Grupo SAMCA (216 MW) and ACS DC La Puebla (100 MW).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity does Spain have?
Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.