Proprietary data
Prime Data Centers Data Centers
Data centers operated by Prime Data Centers that we have verified: location, status and capacity, each checked against its source.
In short
As of 9 November 2026, DC Market Insights tracks 22 data centers operated by Prime Data Centers in 4 countries, of which 7 are operational. Stated operational capacity is 160 MW, with a further 222 MW under construction and 778 MW planned. The pipeline is 6.3 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 22 of 22 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Prime Data Centers data centers: key facts
About Prime Data Centers
Prime Data Centers is a US developer and operator of hyperscale and purpose-built data centers, founded in California in 2017 and based in Dallas, Texas. In its 2026 Sustainability Report release (24 August 2026) it stated 5.6GW of operational and planned capacity across 14 campuses and 29 projects in 16 markets in North America and Europe. Its website lists campuses in Austin, Chicago, Dallas, Los Angeles, Phoenix, Sacramento, Silicon Valley, Frankfurt and Madrid.
- Headquarters
- Dallas, United States
- Founded
- 2017
- Ownership
- Private; Data Realty Holding Corp. is the founding and controlling shareholder, with a preferred equity investment from Grain Management (April 2026)
- Parent company
- Data Realty Holding Corp.
- Tracked footprint
- 22 facilities in 4 countries
- Website
- primedatacenters.com
Data center business
- The company's About page states 28 data centers on 13 campuses and an expansion pipeline of more than 4GW. Founder and CEO is Nicholas Laag; the leadership team also lists CFO Ulrich Pelz, Chief Legal Officer Donncha Ó Tuama, EVP Product Delivery Michael Wall and EVP Commercial Strategy and Revenue Gabby Ascione.
- Chicago (ORD01, Elk Grove Village): three hyperscale data centers planned to deliver 270MW of critical IT load on 29.75 acres. ORD01-01 at 1650 E Higgins (72MW) is operational and leased; ORD01-02 (54MW) and ORD01-03 (54MW) are in development and leased.
- Phoenix (PHX01, Avondale, Arizona): a five-building hyperscale campus of 240MW critical IT load on 66.5 acres and 1.3 million sq ft, 48MW per building, powered by an on-site substation whose first phase has been commissioned. Buildings 1-3 have been secured by a leading hyperscaler.
- Austin (AUS01, Lockhart, Texas): a 205-acre campus planned for 384MW of critical IT load across eight hyperscale data centers of about 250,000 sq ft each, served by Bluebonnet Electric Cooperative. The first building, AUS01-01 (144MW), is leased.
- California: five enterprise data centers in Silicon Valley total 57MW and 540,000 sq ft (SJC01 20MW and SJC06 10MW operational; SJC02 9MW powered shell; SJC03 and SJC04 9MW each in development). The Sacramento McClellan Park campus has 26MW across SMF01-01 (8MW, operational) and SMF01-02 (18MW, under construction). LAX01 in Vernon delivers 33MW across six data halls.
- Dallas (DFW01): two enterprise data centers totalling 20MW critical, DFW01-01 at 1515 Round Table (8MW, operational) and DFW01-02 at 1455 Round Table (12MW, under construction), both leased.
- Europe: MAD01 in Alcobendas, Madrid is a 40MW hyperscale building in development (25,810 sq m, Iberdrola utility), and FRA01 in the Main-Taunus-Kreis near Frankfurt is a 20MW hyperscale building in development. In Denmark the company plans the ESB01 campus in Esbjerg with Brunswick Real Estate.
- Sustainability: Prime matched 100% of its 2025 Scope 2 electricity use with renewable energy certificates, reported a company-wide WUE of near zero from closed-loop cooling, and buys water restoration certificates equal to 120% of operating water withdrawals. It published its first TCFD-aligned report in 2026.
Recent updates
- Released its 2026 Sustainability Report and first TCFD report, stating 5.6GW of operational and planned capacity across 14 campuses and 29 projects in 16 markets.
- Broke ground on the first three 48MW buildings of the 240MW PHX01 campus in Avondale, Arizona, part of a more than $3 billion investment; ARCOMurray is the builder.
- Broke ground on SMF02, a 150,000 sq ft, 18MW second data center on its Sacramento campus, with Clune Construction as general contractor.
- Announced the ESB01 campus at Nordre Tovrupvej, Esbjerg, Denmark, with Brunswick Real Estate: a first phase of 160MW IT (about EUR 2 billion) on a 640,000 sq m site, entering an EIA for up to 550MW IT (about EUR 6 billion at full build-out).
- Appointed John Bates as Executive Vice President of Development and Power, leading acquisitions, development and power for grid-connected and behind-the-meter assets.
- DFW01-01 in Dallas and SMF01-01 in Sacramento earned US EPA ENERGY STAR certification.
- Lambda will lease 21MW of the 33MW LAX01 data center in Vernon, California for NVIDIA Blackwell AI infrastructure.
Company details checked against company and official sources, 20 Oct 2026.
- Capacity under construction or planned (1,000 MW) is 6.3 times the operational base of 160 MW.
- Its largest operational site is Prime ORD01-01 in Elk Grove Village, United States at 72 MW.
- The largest project in the pipeline is Prime AUS01 Lockhart Campus (384 MW, planned).
- United States accounts for 81% of tracked capacity (19 facilities).
- By type, the tracker lists 13 hyperscale, 6 enterprise and 3 colocation facilities.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Prime Data Centers development pipeline
Under construction and planned facilities with a stated capacity, largest first. 222 MW under construction and 778 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Prime AUS01 Lockhart CampusPrime Data Centers | Lockhart, United States | Planned | Hyperscale | 384 MW |
| Prime Data Centers Esbjerg campusPrime Data Centers | Esbjerg, Denmark | Planned | Hyperscale | 160 MW |
| Prime ORD01-02Prime Data Centers | Elk Grove Village, United States | Planned | Hyperscale | 54 MW |
| Prime ORD01-03Prime Data Centers | Elk Grove Village, United States | Planned | Hyperscale | 54 MW |
| Prime PHX01-01 AvondalePrime Data Centers | Avondale, United States | Under construction | Hyperscale | 48 MW |
| Prime PHX01-02 AvondalePrime Data Centers | Avondale, United States | Under construction | Hyperscale | 48 MW |
| Prime PHX01-03 AvondalePrime Data Centers | Avondale, United States | Under construction | Hyperscale | 48 MW |
| Prime PHX01-04 AvondalePrime Data Centers | Avondale, United States | Under construction | Hyperscale | 48 MW |
| Prime PHX01-05 AvondalePrime Data Centers | Avondale, United States | Planned | Hyperscale | 48 MW |
| Prime MAD01-01 MadridPrime Data Centers | Alcobendas, Spain | Planned | Hyperscale | 40 MW |
| FRA01-01Prime Data Centers | Hofheim am Taunus, Germany | Planned | Hyperscale | 20 MW |
| Prime SMF02 SacramentoPrime Data Centers | Sacramento, United States | Under construction | Colocation | 18 MW |
Facilities
22 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Prime AUS01 Lockhart CampusHyperscale | Lockhart, United States | Planned | 384 MW IT | — | Operator / official |
Prime Data Centers Esbjerg campusHyperscale
History
|
Esbjerg, Denmark | Planned | 160 MW IT | — | Operator / official |
| Prime ORD01-01Hyperscale | Elk Grove Village, United States | Operational | 72 MW IT | — | Operator / official |
| Prime ORD01-02Hyperscale | Elk Grove Village, United States | Planned | 54 MW IT | — | Operator / official |
| Prime ORD01-03Hyperscale | Elk Grove Village, United States | Planned | 54 MW IT | — | Operator / official |
Prime PHX01-01 AvondaleHyperscale
History
|
Avondale, United States | Under construction | 48 MW IT | — | Operator / official |
Prime PHX01-02 AvondaleHyperscale
History
|
Avondale, United States | Under construction | 48 MW IT | — | Operator / official |
Prime PHX01-03 AvondaleHyperscale
History
|
Avondale, United States | Under construction | 48 MW IT | — | Operator / official |
| Prime PHX01-04 AvondaleHyperscale | Avondale, United States | Under construction | 48 MW IT | — | Operator / official |
| Prime PHX01-05 AvondaleHyperscale | Avondale, United States | Planned | 48 MW IT | — | Operator / official |
| Prime MAD01-01 MadridHyperscale | Alcobendas, Spain | Planned | 40 MW IT | — | Operator / official |
| Prime LAX01 VernonHyperscale | Vernon, United States | Operational | 33 MW IT | — | Operator / official |
| FRA01-01Hyperscale | Hofheim am Taunus, Germany | Planned | 20 MW IT | — | Trade press |
| Prime SJC01 Silicon ValleyEnterprise | United States | Operational | 20 MW IT | — | Operator / official |
| Prime SMF02 SacramentoColocation | Sacramento, United States | Under construction | 18 MW IT | — | Operator / official |
| Prime DFW01-02 DallasColocation | Dallas, United States | Under construction | 12 MW IT | — | Operator / official |
| Prime SJC06 Silicon ValleyEnterprise | United States | Operational | 10 MW IT | — | Operator / official |
| Prime SJC02 Silicon ValleyEnterprise | United States | Operational | 9 MW IT | — | Operator / official |
| Prime SJC03 Silicon ValleyEnterprise | United States | Planned | 9 MW IT | — | Operator / official |
| Prime SJC04 Santa ClaraEnterprise | Santa Clara, United States | Planned | 9 MW IT | — | Operator / official |
| Prime DFW01-01 DallasColocation | Dallas, United States | Operational | 8 MW IT | — | Operator / official |
| Prime SMF01 SacramentoEnterprise | Sacramento, United States | Operational | 8 MW IT | — | Operator / official |
Market position
How Prime Data Centers compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In United States, Prime Data Centers ranks #22 of 171 tracked operators by capacity, with 1.2% of the country’s tracked MW.
- United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
- Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
- In Germany, Prime Data Centers ranks #27 of 56 tracked operators by capacity, with 0.4% of the country’s tracked MW.
- In Denmark, Prime Data Centers ranks #3 of 14 tracked operators by capacity, with 18% of the country’s tracked MW.
- Avondale also hosts 1 other tracked data center(s), run by STACK Infrastructure.
Data center operators in United States
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Tract | 19 | — | 17,275 MW |
| PowerHouse Data Centers | 17 | 60 MW | 8,807 MW |
| Meta | 31 | 1,000 MW | 7,000 MW |
| Vantage Data Centers | 22 | 194 MW | 3,804 MW |
| Beale Infrastructure | 6 | — | 3,650 MW |
| OpenAI | 1 | — | 3,200 MW |
| Aligned Data Centers | 29 | 154 MW | 2,648 MW |
| STACK Infrastructure | 20 | 480 MW | 1,848 MW |
All data centers in United States Power and policy in United States
Data center operators in Germany
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| NTT DATA | 12 | 223 MW | 658 MW |
| CloudHQ | 4 | 112 MW | 407 MW |
| AM:PM Grund | 1 | — | 500 MW |
| Telis Energie Deutschland | 1 | — | 500 MW |
| Schwarz Digits (STACKIT) | 2 | — | 440 MW |
| Amazon Web Services | 2 | — | 300 MW |
| CyrusOne | 7 | 60 MW | 219 MW |
| maincubes | 6 | 39 MW | 226 MW |
All data centers in Germany Power and policy in Germany
Data center operators in Denmark
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| GARBE Data Centers | 1 | — | 350 MW |
| atNorth | 2 | 30 MW | 250 MW |
| STACK Infrastructure | 1 | — | 72 MW |
| Digital Realty | 4 | 23 MW | — |
| Thylander | 1 | — | 11.5 MW |
| Penta Infra | 1 | 1.6 MW | — |
| Microsoft | 5 | — | — |
| Kolo | 5 | — | — |
All data centers in Denmark Power and policy in Denmark
Other data centers in Avondale
- STACK PHX01 Avondale · STACK Infrastructure · Under construction · 225 MW
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Prime Data Centers operate?
DC Market Insights tracks 22 Prime Data Centers data center(s) in 4 countries as of November 2026: 7 operational, 6 under construction and 9 planned.
Where is Prime Data Centers headquartered?
Prime Data Centers is headquartered in Dallas, United States. Ownership: Private; Data Realty Holding Corp. is the founding and controlling shareholder, with a preferred equity investment from Grain Management (April 2026).
Which other companies operate data centers in United States?
Besides Prime Data Centers, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.
What rules apply to data centers in United States?
Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.
Which other data centers are in Avondale?
Other tracked data centers in Avondale include STACK PHX01 Avondale (STACK Infrastructure).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.