Proprietary data

EdgeConneX Data Centers

Data centers operated by EdgeConneX that we have verified: location, status and capacity, each checked against its source.

In short

As of 15 November 2026, DC Market Insights tracks 60 data centers operated by EdgeConneX in 15 countries, of which 36 are operational. Stated operational capacity is 137 MW, with a further 317 MW under construction and 449 MW planned. The pipeline is 5.6 times the capacity already operating.

60Facilities tracked
15Countries
137 MWOperational (36 sites)
317 MWUnder construction (6 sites)
449 MWPlanned (18 sites)

MW = IT capacity where the source states it, otherwise total capacity. 29 of 60 facilities have a stated capacity; the others are counted as sites only.

EdgeConneX Kuala Lumpur CBD · EdgeConneX · Kuala Lumpur (approximate location)EdgeConneX Cyberjaya · EdgeConneX · Cyberjaya (approximate location)EdgeConneX Bukit Jalil · EdgeConneX · Kuala Lumpur (approximate location)EdgeConneX Heusenstamm campus · EdgeConneX · Heusenstamm (approximate location) · Cooling: Chilled water, dry coolersMUC01 · EdgeConneX · Munich (approximate location)SCL01 · EdgeConneX · Colina (approximate location)SCL02 · EdgeConneX · Colina (approximate location)SCL03 · EdgeConneX · Colina (approximate location)SCL04 · EdgeConneX · Colina (approximate location)BOG01 · EdgeConneX · Bogotá (approximate location)BOG02 · EdgeConneX · Bogotá (approximate location)BOG11 · EdgeConneX · Bogotá (approximate location)BUE · EdgeConneX · Pilar (approximate location)EdgeConneX RIC01 Richmond · EdgeConneX · Richmond (approximate location)EdgeConneX PIT01 Pittsburgh · EdgeConneX · Pittsburgh (approximate location)EdgeConneX NOR01 Norfolk · EdgeConneX · Norfolk (approximate location)EdgeConneX HOU-01 Houston · EdgeConneX · Houston (approximate location)EdgeConneX PHX01 Tempe · EdgeConneX · Tempe (approximate location)EdgeConneX LAS01 Las Vegas · EdgeConneX · Las Vegas (approximate location)EdgeConneX SVC01 Santa Clara · EdgeConneX · Santa Clara (approximate location)EdgeConneX Union City (ATL11-ATL13) · EdgeConneX · Union City (approximate location)ATL02 · EdgeConneX · Atlanta (approximate location)ATL01 · EdgeConneX · Atlanta (approximate location)SLI01 · EdgeConneX · Slidell (approximate location)MEM01 · EdgeConneX · Memphis (approximate location)EdgeConneX CHI01 · EdgeConneX · Elk Grove Village (approximate location)EdgeConneX CHI02 · EdgeConneX · Elk Grove Village (approximate location)EdgeConneX CHI03 · EdgeConneX · Elk Grove Village (approximate location)EdgeConneX New Albany · EdgeConneX · New Albany (approximate location)Amsterdam campus (AMS01) · EdgeConneX · Amsterdam (approximate location)DUB01 · EdgeConneX · Dublin (approximate location)DUB02 · EdgeConneX · Dublin (approximate location)DUB03 · EdgeConneX · Dublin (approximate location)BCN01 · EdgeConneX · Barcelona (approximate location)WAW01 · EdgeConneX · Warsaw (approximate location)BRU (Ternat) · EdgeConneX · Ternat (approximate location)Greater Jakarta Data Center Campus · EdgeConneX · Jakarta (approximate location)DEN01 · EdgeConneX · Denver (approximate location)DEN02 · EdgeConneX · Denver (approximate location)BOS01 · EdgeConneX (approximate location)SEA01 · EdgeConneX (approximate location)MSP01 · EdgeConneX · Minneapolis (approximate location)TOR-01 · EdgeConneX · Toronto (approximate location)ITM01 Kagoya Tatara Campus · EdgeConneX · Kyotanabe (approximate location)Skellefteå campus · EdgeConneX · Skellefteå (approximate location)EdgeConneX Lucan (Ballymakaily) data centres · EdgeConneX · Lucan (approximate location)AMS10 · EdgeConneX · Schiphol-Rijk (approximate location)AMS11 · EdgeConneX · Schiphol-Rijk (approximate location)AMS13 · EdgeConneX · Schiphol-Rijk (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

EdgeConneX data centers: key facts

About EdgeConneX

EdgeConneX is a Build-to-Suit and Build-to-Density data center developer and operator founded in 2009 and owned by EQT Infrastructure since 2020. Its website (October 2026) states over 90 data centers built and in development across North America, South America, Europe, the Middle East and Asia Pacific, ranging from 40 kW to 500 MW or more, with headquarters in Herndon (Northern Virginia), Schiphol-Rijk (Amsterdam) and Singapore. Large campuses under way include a 200 MW site in Greater Osaka and a planned site of up to 1 GW in Skellefteå, Sweden.

Headquarters
Herndon, United States
Founded
2009
Ownership
Private; acquired by EQT Infrastructure in 2020
Parent company
EQT Infrastructure
Tracked footprint
60 facilities in 15 countries
Website
edgeconnex.com

Data center business

  • In Jakarta, EdgeConneX bought 45,000 sqm of land in Bekasi, Cikarang, to expand its hyperscale campus to 200+ MW, tripling capacity; the campus page shows 2 MW operational.
  • EdgeConneX says it has over 90 data centers sustainably built and in development across Asia Pacific, Europe, the Middle East, North America and South America, with facilities ranging from 40 kW to 500 MW or more. It offers Build-to-Suit and Build-to-Density solutions and runs its patented EdgeOS data center operating system. (Another line on the same page still says 'over 80'.)
  • Americas: the company lists 29 data center markets in the US, Canada, Chile, Colombia and Argentina, including Atlanta, Boston, Chicago, Denver, Houston, Phoenix, Portland, Santa Clara, Seattle, Toronto, Santiago, Bogota and Buenos Aires, plus Austin (Texas) and New Albany (Ohio) marked as coming soon.
  • Europe and Middle East: data centers in Amsterdam, Barcelona, Brussels, Dublin, Munich, Tel Aviv and Warsaw, with Frankfurt, Fyresdal (Norway), Milan, Skellefteå (Sweden) and Vaasa (Finland) coming soon. In Amsterdam it operates four data centers with up to 40 MW N+1; the Dublin campus at Grange Castle has 32 MW N+1 (DUB01 18 MW, DUB02 7 MW, DUB03 7 MW planned).
  • Asia-Pacific: data centers in Beijing-Tianjin, Greater Shanghai, Chennai, Jakarta, Japan and Kuala Lumpur, with further sites coming soon in Malaysia (Bukit Jalil, Cyberjaya, Johor), India (several cities), Manila, Sydney and Melbourne. India sites are developed through the AdaniConneX joint venture with Adani Enterprises.

Ownership and investors

  • EQT's half-year report for 2026 says EQT introduced its AI Infrastructure strategy, fully seeded by EdgeConneX through the acquisition of a minority stake in the company from EQT Infrastructure IV and V.
  • EQT Infrastructure, invested in EdgeConneX since 2020, signed an agreement to sell a minority stake in the company to funds managed by Sixth Street, with EQT Infrastructure remaining the largest shareholder after closing.

Recent updates

  • Entered Australia in a partnership with Stockland: the two are advancing an initial portfolio of hyperscale data center campuses in Sydney and Melbourne, with 450MW of power secured.
  • Co-invested in the Amazon-led $32 million Colorado River Basin water stewardship collaborative.
  • Appointed an SVP of Global Construction Delivery and vice presidents for Norway and Germany; the Fyresdal (Norway) campus is in development and Munich and Frankfurt have planned expansions.
  • Joined Singapore's Sustainable Tropical Data Centre Testbed 2.0 as a top-tier anchor partner with a multi-year funding commitment.
  • Backed the Texas Governor's data center standards while developing a new technology campus in Bastrop County near Austin, committing to air-cooled or closed-loop cooling at most sites and to fund project energy costs so residential ratepayers are not burdened.
  • Opened a global training center at its Houston data center campus (ribbon-cutting 2 April 2026) for AI-era power and cooling practices.
  • Started construction of its first Japan campus, a 200 MW AI-ready hyperscale campus on 130,000 sqm in Greater Osaka (ITM01 at the Kagoya Tatara Campus, Kyotanabe), with Kagoya Asset Management; first phase ready for service in Q1 2028. The company plans 350 MW in the Greater Osaka region.
  • Agreed to acquire a site in Skellefteå, Sweden, from Lyten, with potential capacity of up to one gigawatt, subject to administrative and regulatory processes.

Company details checked against company and official sources, 3 Nov 2026.

  • Capacity under construction or planned (766 MW) is 5.6 times the operational base of 137 MW.
  • Its largest operational site is Amsterdam campus (AMS01) in Amsterdam, Netherlands at 40 MW.
  • The largest project in the pipeline is ITM01 Kagoya Tatara Campus by EdgeConneX (200 MW, under construction).
  • Malaysia accounts for 31% of tracked capacity (3 facilities).
  • By type, the tracker lists 31 colocation, 19 edge and 10 hyperscale facilities.
  • 29 of 60 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational137 MW
Under construction317 MW
Planned449 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by country, MW
Malaysia284 MW
Japan200 MW
Ireland62 MW
Chile61 MW
Colombia19.2 MW
Belgium16 MW
Spain8.4 MW
Argentina3.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation31
Edge19
Hyperscale10

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

EdgeConneX development pipeline

Under construction and planned facilities with a stated capacity, largest first. 317 MW under construction and 449 MW planned in total.

ProjectLocationStatusTypeCapacity
ITM01 Kagoya Tatara CampusEdgeConneX Kyotanabe, Japan Under construction Hyperscale 200 MW
EdgeConneX CyberjayaEdgeConneX Cyberjaya, Malaysia Planned Colocation 200 MW
AMS10EdgeConneX Schiphol-Rijk, Netherlands Under construction Colocation 108 MW
EdgeConneX Bukit JalilEdgeConneX Kuala Lumpur, Malaysia Planned Colocation 67 MW
AMS13EdgeConneX Schiphol-Rijk, Netherlands Planned Colocation 54 MW
SCL04EdgeConneX Colina, Chile Planned Colocation 33 MW
EdgeConneX Lucan (Ballymakaily) data centresEdgeConneX Lucan, Ireland Planned Colocation 30 MW
DEN02EdgeConneX Denver, United States Planned Colocation 24 MW
EdgeConneX Kuala Lumpur CBDEdgeConneX Kuala Lumpur, Malaysia Planned Colocation 17 MW
BOG01EdgeConneX Bogotá, Colombia Planned Colocation 9.6 MW
BOG02EdgeConneX Bogotá, Colombia Under construction Colocation 9.6 MW
SCL03EdgeConneX Colina, Chile Planned Colocation 7 MW

Facilities

60 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
EdgeConneX CyberjayaColocation Cyberjaya, Malaysia Planned 200 MW — Operator / official
ITM01 Kagoya Tatara CampusHyperscale
History
  1. Under construction
  2. Under construction
Kyotanabe, Japan Under construction 200 MW total — Operator / official
AMS10Colocation
History
  1. Under construction
  2. Under construction
  3. Under construction
  4. Under construction
Schiphol-Rijk, Netherlands Under construction 108 MW total — Trade press
EdgeConneX Bukit JalilColocation Kuala Lumpur, Malaysia Planned 67 MW IT — Operator / official
AMS13Colocation
History
  1. Planned
  2. Planned
Schiphol-Rijk, Netherlands Planned 54 MW total — Trade press
Amsterdam campus (AMS01)Colocation Amsterdam, Netherlands Operational 40 MW total — Operator / official
SCL04Colocation Colina, Chile Planned 33 MW IT — Operator / official
EdgeConneX Lucan (Ballymakaily) data centresColocation Lucan, Ireland Planned 30 MW total — Operator / official
DEN02Colocation Denver, United States Planned 24 MW total — Operator / official
DUB01Colocation Dublin, Ireland Operational 18 MW total — Operator / official
EdgeConneX Kuala Lumpur CBDColocation Kuala Lumpur, Malaysia Planned 17 MW IT — Operator / official
BRU (Ternat)Hyperscale Ternat, Belgium Operational 16 MW total — Operator / official
SCL02Colocation Colina, Chile Operational 14 MW IT — Operator / official
BOG01Colocation Bogotá, Colombia Planned 9.6 MW IT — Operator / official
BOG02Colocation Bogotá, Colombia Under construction 9.6 MW IT — Operator / official
ATL02Edge Atlanta, United States Operational 9 MW IT — Operator / official
BCN01Colocation Barcelona, Spain Operational 8.4 MW total — Operator / official
DUB02Colocation Dublin, Ireland Operational 7 MW total — Operator / official
DUB03Colocation Dublin, Ireland Planned 7 MW total — Operator / official
SCL01Colocation Colina, Chile Operational 7 MW IT — Operator / official
SCL03Colocation Colina, Chile Planned 7 MW IT — Operator / official
BUEEdge Pilar, Argentina Operational 3.5 MW IT — Operator / official
DEN01Colocation Denver, United States Operational 3 MW total — Operator / official
EdgeConneX POR02 PortlandColocation United States Operational 3 MW IT — Operator / official
MUC01Colocation Munich, Germany Operational 2.4 MW total — Operator / official
ATL01Edge Atlanta, United States Operational 2.1 MW IT — Operator / official
Greater Jakarta Data Center CampusHyperscale
History
  1. Planned
  2. Operational
Jakarta, Indonesia Operational 2 MW total — Operator / official
EdgeConneX LAS01 Las VegasEdge Las Vegas, United States Operational 0.8 MW IT — Operator / official
EdgeConneX NOR01 NorfolkEdge Norfolk, United States Operational 0.8 MW IT — Operator / official
AMS11Colocation
History
  1. Planned
  2. Planned
Schiphol-Rijk, Netherlands Planned — — Operator / official
BOG11Colocation Bogotá, Colombia Under construction — — Operator / official
BOS01Edge United States Operational — — Operator / official
EdgeConneX AUS02 BastropHyperscale United States Under construction — — Trade press
EdgeConneX CHI01Colocation Elk Grove Village, United States Operational — — Operator / official
EdgeConneX CHI02Colocation Elk Grove Village, United States Operational — — Operator / official
EdgeConneX CHI03Colocation Elk Grove Village, United States Planned — — Operator / official
EdgeConneX DET01Edge United States Operational — — Operator / official
EdgeConneX EDCAUS11 Cedar CreekHyperscale Cedar Creek, United States Planned — — Trade press
EdgeConneX EDCAUS12 Cedar CreekHyperscale Cedar Creek, United States Planned — — Trade press
EdgeConneX Heusenstamm campusHyperscale Cooling: Chilled water, dry coolers
History
  1. Planned
  2. Under construction
  3. Under construction
  4. Under construction
Heusenstamm, Germany Under construction — — Operator / official
EdgeConneX HOU-01 HoustonColocation Houston, United States Operational — — Operator / official
EdgeConneX New AlbanyHyperscale New Albany, United States Planned — — Operator / official
EdgeConneX PHX01 TempeColocation Tempe, United States Operational — — Operator / official
EdgeConneX PIT01 PittsburghEdge Pittsburgh, United States Operational — — Operator / official
EdgeConneX POR01 PortlandColocation United States Operational — — Operator / official
EdgeConneX POR03 PortlandColocation United States Planned — — Operator / official
EdgeConneX RIC01 RichmondEdge Richmond, United States Operational — — Operator / official
EdgeConneX SVC01 Santa ClaraEdge Santa Clara, United States Operational — — Operator / official
EdgeConneX Union City (ATL11-ATL13)Hyperscale Union City, United States Planned — — Operator / official
JAX01Edge United States Operational — — Operator / official

Market position

How EdgeConneX compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In United States, EdgeConneX ranks #49 of 171 tracked operators by capacity, with 0.1% of the country’s tracked MW.
  • United States has 1,315 tracked data centers from 171 operators: 11,392 MW operational and 66,365 MW under construction or planned.
  • Industrial electricity in United States costs 86.2 USD/MWh (2025, latest official figure).
  • In Netherlands, EdgeConneX ranks #1 of 33 tracked operators by capacity, with 32% of the country’s tracked MW.
  • In Ireland, EdgeConneX ranks #7 of 15 tracked operators by capacity, with 4.7% of the country’s tracked MW.
  • Our Deal Tracker lists 1 deal(s) naming EdgeConneX, the latest on 14 October 2026.

Data center operators in United States

Tracked facilities1,315171 operators
Operational capacity11,392 MW66,365 MW in the pipeline
EdgeConneX rank by capacity#49of 171 operators · 0.1%
Industrial power price86.2 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Tract19—17,275 MW
PowerHouse Data Centers1760 MW8,807 MW
Meta311,000 MW7,000 MW
Vantage Data Centers22194 MW3,804 MW
Beale Infrastructure6—3,650 MW
OpenAI1—3,200 MW
Aligned Data Centers29154 MW2,648 MW
STACK Infrastructure20480 MW1,848 MW

All data centers in United States Power and policy in United States

Data center operators in Netherlands

Tracked facilities10833 operators
Operational capacity217 MW414 MW in the pipeline
EdgeConneX rank by capacity#1of 33 operators · 32%
Industrial power price148 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
CloudHQ1—84 MW
Pure DC1—78 MW
Digital Realty13—70 MW
NorthC1457 MW—
CyrusOne154 MW—
Iron Mountain213.1 MW20 MW
NTT DATA120.7 MW—
Colt DCS215 MW—

All data centers in Netherlands Power and policy in Netherlands

Data center operators in Ireland

Tracked facilities3915 operators
Operational capacity53 MW1,278 MW in the pipeline
EdgeConneX rank by capacity#7of 15 operators · 4.7%
Industrial power price234 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Red Admiral DC1—250 MW
Echelon Data Centres2—200 MW
Art Data Centres1—200 MW
Herbata1—180 MW
Amazon Web Services6—169 MW
Huntstown Power Company1—150 MW
Pure DC314 MW40 MW
Vantage Data Centers1—52 MW

All data centers in Ireland Power and policy in Ireland

Deals naming EdgeConneX

  • EdgeConneX; Stockland → Hyperscale data center campus JV, Australia (initial campuses Sydney and Melbourne, 450 MW power secured) JV / partnership

Open in the Deal Tracker

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does EdgeConneX operate?

DC Market Insights tracks 60 EdgeConneX data center(s) in 15 countries as of November 2026: 36 operational, 6 under construction and 18 planned.

Where is EdgeConneX headquartered?

EdgeConneX is headquartered in Herndon, United States. Ownership: Private; acquired by EQT Infrastructure in 2020.

Which other companies operate data centers in United States?

Besides EdgeConneX, the largest operators we track in United States by capacity are Tract, PowerHouse Data Centers, Meta, Vantage Data Centers and Beale Infrastructure. The United States page lists all 171 operators.

What rules apply to data centers in United States?

Our Power & Policy Tracker lists 15 government actions on data centers and power in United States, including 0 restriction(s) and 1 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst