DayOne Data Centers
Data centers operated by DayOne that we have verified: location, status and capacity, each checked against its source.
In short
As of 3 November 2026, DC Market Insights tracks 15 data centers operated by DayOne in 8 countries, of which 5 are operational.
MW = IT capacity where the source states it, otherwise total capacity. 3 of 15 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
DayOne data centers: key facts
About DayOne
DayOne Data Centers is a Singapore-headquartered developer and operator of hyperscale data center campuses, spun out of GDS Holdings. As of 20 September 2026 it reported 962 MW Capacity In Service, 1,328 MW Capacity Under Construction and about 2.3 GW of Bookings across Johor and Kuala Lumpur (Malaysia), Batam (Indonesia), Singapore, Greater Bangkok, Tokyo, Kyushu, Hong Kong, Greater Helsinki (Finland) and Zaragoza (Spain).
- Headquarters
- Singapore, Singapore
- Founded
- 2022
- Ownership
- Private (pre-IPO); GDS Holdings holds 19.4%; Nasdaq listing (DODC) applied for
- Tracked footprint
- 15 facilities in 8 countries
- Website
- dayonedc.com
Data center business
- DayOne was incorporated in the Cayman Islands on 18 May 2022 as DigitalLand Holdings Limited and renamed DayOne Data Centers Limited on 1 January 2025. It is headquartered at Suntec Tower 5, Singapore. It began as a consolidated subsidiary of GDS Holdings, the Chinese data center operator, and was deconsolidated from GDS on 31 December 2024; GDS now holds 19.4% of its shares.
- Footprint as of 20 September 2026: 962 MW Capacity In Service, 1,328 MW Capacity Under Construction (99.3% pre-committed), 2,308 MW Secured Powered Land and 4,597 MW total resources, plus 1.3 GW Powered Land Pipeline. Bookings were about 2.3 GW, substantially all due for delivery by 31 December 2028, with a further 1.1 GW of customer Reservations.
- Johor, Malaysia is the core market: the Nusajaya Tech Park (NTP) campus was delivered in 2023 and Kempas Tech Park (KTP), about 21 km from NTP and 14 km from Singapore, was bought in 2024. Johor had 789 MW in service and 616 MW under construction on 20 September 2026, about 1.4 GW of Bookings and ten customers. Malaysia gave 87.0% of revenue in the first half of 2026.
- Batam, Indonesia: the flagship Nongsa Digital Park (NDP) campus opened with a 34 MW anchor commitment, and the first Batam data center was delivered in 2025. A second campus at Kabil Industrial Tech Park (KITP), secured in 2026, has 360 MW of IT power capacity, of which 240 MW is contracted. Batam had 72 MW in service and 240 MW under construction. A sovereign wealth fund holds 40% of the Indonesian subsidiary.
- Singapore: DayOne won about 20 MW under the Data Centre-Call for Application (DC-CFA), one of four winners of the 80 MW on offer. The 20 MW, about 40,000 sq m SG1 facility broke ground on 25 July 2025, with Phase One due ready for service in 2026. Singapore Economic Development Board
- Newer markets: Greater Bangkok (Chonburi Tech Park, 73 MW in service and 47 MW under construction), Kuala Lumpur (Klang Valley and Banting Tech Parks, 128 MW under construction, 1.3 GW powered land), Greater Helsinki (Kouvola and Lahti, 281 MW under construction for one hyperscale customer; Hyperco Oy holds 45% of the Kouvola company), Tokyo (Fuchu Intelligent Park and Kodaira, 60 MW powered land), Kyushu (Imari Tech Park, ~160 MW), Zaragoza (Escatrón, 304 MW powered land) and Hong Kong (four West Kowloon buildings, 27 MW in service).
- Customers are mainly global hyperscalers. The anchor customer of the Johor NTP campus grew its commitment from an initial 64 MW to 838 MW across Johor, Greater Bangkok and Greater Helsinki by 20 September 2026. DayOne says it generally avoids speculative development and builds to contracted demand. It had 1,280 employees on 30 June 2026.
Recent updates
- DayOne filed a Form F-1 with the SEC for an initial public offering of American depositary shares and applied to list on the Nasdaq Stock Market under the symbol DODC.
- Funding (F-1): DayOne raised US$1.9 billion in Series A and B rounds in 2024, US$1.3 billion in 2025 and US$3.2 billion in 2026 in its Series C equity financing; Series C shares worth US$2,440.3 million were issued from February to June 2026.
- DayOne signed a power purchase agreement of about 511 MVA, around 450 MW of grid capacity, with PLN Batam for its new Kabil Industrial Tech Park campus in Batam, with power phased in during 2026 and 2027.
- On 26 February 2026 DayOne finalised the shareholders' agreement with Hyperco Oy for Hyperco Data Systems Top Oy, taking a 55% stake; Hyperco Oy holds the other 45%.
- DayOne broke ground on its first Singapore data center, a 20 MW facility of about 40,000 sq m, with Phase One scheduled for ready for service in 2026. Singapore Economic Development Board
Company details checked against company and official sources, 3 Nov 2026.
- The largest project in the pipeline is DayOne Nurmijärvi (Sudentulli, Klaukkala) (560 MW, planned).
- Finland accounts for 60% of tracked capacity (1 facilities).
- By type, the tracker lists 13 hyperscale, 1 other and 1 colocation facilities.
- 3 of 15 facilities have a capacity stated by their source; the totals above count only those.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
DayOne development pipeline
Under construction and planned facilities with a stated capacity, largest first. 20 MW under construction and 920 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| DayOne Nurmijärvi (Sudentulli, Klaukkala)DayOne | Nurmijärvi, Finland | Planned | Other | 560 MW |
| Kabil Industrial Tech Park (KITP)DayOne | Batam, Indonesia | Planned | Hyperscale | 360 MW |
| SG1DayOne | Singapore, Singapore | Under construction | Hyperscale | 20 MW |
Facilities
15 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
DayOne Nurmijärvi (Sudentulli, Klaukkala)Other
History
|
Nurmijärvi, Finland | Planned | 560 MW total | — | Operator / official |
Kabil Industrial Tech Park (KITP)Hyperscale
History
|
Batam, Indonesia | Planned | 360 MW IT | — | Operator / official |
SG1Hyperscale
History
|
Singapore, Singapore | Under construction | 20 MW total | — | Operator / official |
| Banting Tech Park (BTP) campusHyperscale | Banting, Malaysia | Planned | — | — | Operator / official |
| Chonburi Tech Park (CTP) campusHyperscale | Chonburi, Thailand | Operational | — | — | Operator / official |
| Escatrón campusHyperscale | Escatrón, Spain | Planned | — | — | Operator / official |
| Fuchu Intelligent Park (FIP)Hyperscale | Fuchu, Japan | Planned | — | — | Operator / official |
| Imari Tech Park (ITP)Hyperscale | Imari, Japan | Planned | — | — | Operator / official |
| Kempas Tech Park (KTP) campusHyperscale | Kempas, Malaysia | Operational | — | — | Operator / official |
| Klang Valley Tech Park (KVTP) campusHyperscale | Kuala Lumpur, Malaysia | Planned | — | — | Operator / official |
| Kodaira siteHyperscale | Kodaira, Japan | Planned | — | — | Operator / official |
| Nongsa Digital Park (NDP) campusHyperscale | Batam, Indonesia | Operational | — | 2025 | Operator / official |
| Nusajaya Tech Park (NTP) campusHyperscale | Iskandar Puteri, Malaysia | Operational | — | 2023 | Operator / official |
Tanjung Kupang siteHyperscale
History
|
Tanjung Kupang, Malaysia | Planned | — | — | Trade press |
| West Kowloon virtual campus (four buildings)Colocation | Hong Kong, Hong Kong | Operational | — | — | Operator / official |
Market position
How DayOne compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Malaysia, DayOne is one of 31 operators we track.
- Malaysia has 81 tracked data centers from 31 operators: 1,248 MW operational and 3,511 MW under construction or planned.
- Industrial electricity in Malaysia costs 105 USD/MWh (2026, latest official figure).
- In Japan, DayOne is one of 20 operators we track.
- In Indonesia, DayOne ranks #4 of 8 tracked operators by capacity, with 20% of the country’s tracked MW.
- Our Deal Tracker lists 4 deal(s) naming DayOne, the latest on 5 November 2026.
Data center operators in Malaysia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Vantage Data Centers | 3 | 331 MW | 436 MW |
| AirTrunk | 4 | 150 MW | 550 MW |
| Bridge Data Centres | 5 | 146 MW | 500 MW |
| Princeton Digital Group | 2 | 200 MW | 300 MW |
| Vena Nexus | 1 | — | 350 MW |
| YTL Data Centers | 8 | 97 MW | 240 MW |
| MSFusion | 1 | — | 300 MW |
| EdgeConneX | 3 | — | 284 MW |
All data centers in Malaysia Power and policy in Malaysia
Data center operators in Japan
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| AirTrunk | 4 | 410 MW | 120 MW |
| Colt DCS | 9 | 101 MW | 262 MW |
| EdgeConneX | 1 | — | 200 MW |
| NTT DATA | 3 | 30 MW | 136 MW |
| CloudHQ | 1 | — | 96.4 MW |
| ST Telemedia Global Data Centres | 1 | — | 70.8 MW |
| Vantage Data Centers | 1 | — | 68 MW |
| Equinix | 18 | 54 MW | — |
All data centers in Japan Power and policy in Japan
Data center operators in Indonesia
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Digital Edge | 3 | 29 MW | 500 MW |
| Princeton Digital Group | 3 | 26 MW | 360 MW |
| ST Telemedia Global Data Centres | 9 | 42 MW | 332 MW |
| BDx | 1 | — | 120 MW |
| EdgeConneX | 1 | 2 MW | — |
| Equinix | 1 | — | — |
| NeutraDC Nxera Batam | 1 | — | — |
All data centers in Indonesia Power and policy in Indonesia
Deals naming DayOne
- Lenders (not named in quote) → DayOne Data Centers Hong Kong project Financing $237.0M
- CIMB; Crédit Agricole CIB; DBS; Maybank; OCBC; Standard Chartered; UOB → DayOne Data Centers, Johor data centre expansion Financing $3.67B
- Public investors (Nasdaq IPO) → DayOne Data Centers (ADS, ticker DODC) Financing
- DayOne → Planned DayOne data centre in Selangor (Greater Kuala Lumpur), up to 1.5GW on-site generation plus BESS Power deal
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does DayOne operate?
DC Market Insights tracks 15 DayOne data center(s) in 8 countries as of November 2026: 5 operational, 1 under construction and 9 planned.
Where is DayOne headquartered?
DayOne is headquartered in Singapore, Singapore. Ownership: Private (pre-IPO); GDS Holdings holds 19.4%; Nasdaq listing (DODC) applied for.
Which other companies operate data centers in Malaysia?
Besides DayOne, the largest operators we track in Malaysia by capacity are Vantage Data Centers, AirTrunk, Bridge Data Centres, Princeton Digital Group and Vena Nexus. The Malaysia page lists all 31 operators.
What rules apply to data centers in Malaysia?
Our Power & Policy Tracker lists 8 government actions on data centers and power in Malaysia, including 1 restriction(s) and 1 incentive scheme(s) in force.
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.