Proprietary data
Volt Data Centers
Data centers operated by Volt that we have verified: location, status and capacity, each checked against its source.
In short
As of 16 November 2026, DC Market Insights tracks 1 data center operated by Volt in 1 country (0 operational).
MW = IT capacity where the source states it, otherwise total capacity. 0 of 1 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Volt data centers: key facts
- 0 of 1 facilities have a capacity stated by their source; the totals above count only those.
Facilities
1 facility matches. It is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
| Rotterdam AI GigafactoryOther | Rotterdam, Netherlands | Planned | — | — | Trade press |
Market position
How Volt compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Netherlands, Volt is one of 33 operators we track.
- Netherlands has 108 tracked data centers from 33 operators: 217 MW operational and 414 MW under construction or planned.
- Industrial electricity in Netherlands costs 148 USD/MWh (2025, latest official figure).
- Rotterdam also hosts 5 other tracked data center(s), run by NorthC, Eurofiber Cloud Infra and Smartdc.
- Our Deal Tracker lists 5 deal(s) naming Volt, the latest on 30 October 2026.
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 4 | 40 MW | 162 MW |
| CloudHQ | 1 | — | 84 MW |
| Pure DC | 1 | — | 78 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Other data centers in Rotterdam
- NorthC Rotterdam Zestienhoven 2 · NorthC · Operational · 6 MW
- NorthC Rotterdam Zestienhoven 1 · NorthC · Operational · 1.3 MW
- NorthC Rotterdam Waalhaven · NorthC · Operational · 0.5 MW
- Datacenter Rotterdam 2 · Eurofiber Cloud Infra · Operational
- Smartdc Rotterdam · Smartdc · Operational
Deals naming Volt
- TerraVolt Holdings, Inc. → 1,077-acre site outside Declo, Cassia County, Idaho (240 MW gas-powered data center campus) Land / campus
- Volta Data Centres (Arcus Infrastructure Partners) → Reynolds House Manchester data center M&A
- Nebius → VOLT Rotterdam AI Gigafactory (600MW, six buildings; phase 1 two 100MW buildings) JV / partnership
- Zain KSA; DataVolt → Data centre facilities across Saudi Arabia JV / partnership
- HUMAIN; DataVolt → 100MW of a 360MW AI-ready data centre at Oxagon JV / partnership
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Volt operate?
DC Market Insights tracks 1 Volt data center(s) in 1 country as of November 2026: 0 operational, 0 under construction and 1 planned.
Which other companies operate data centers in Netherlands?
Besides Volt, the largest operators we track in Netherlands by capacity are EdgeConneX, CloudHQ, Pure DC, Digital Realty and NorthC. The Netherlands page lists all 33 operators.
What rules apply to data centers in Netherlands?
Our Power & Policy Tracker lists 17 government actions on data centers and power in Netherlands, including 4 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Rotterdam?
Other tracked data centers in Rotterdam include NorthC Rotterdam Zestienhoven 2 (NorthC), NorthC Rotterdam Zestienhoven 1 (NorthC), NorthC Rotterdam Waalhaven (NorthC) and Datacenter Rotterdam 2 (Eurofiber Cloud Infra).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Need the full list, or a capacity view of one market?
Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.