Pure DC Data Centers
Data centers operated by Pure DC that we have verified: location, status and capacity, each checked against its source.
In short
As of 22 October 2026, DC Market Insights tracks 6 data centers operated by Pure DC in 3 countries, of which 2 are operational. Stated operational capacity is 34 MW, with a further 148 MW under construction and 40 MW planned. The pipeline is 5.5 times the capacity already operating.
MW = IT capacity where the source states it, otherwise total capacity. 6 of 6 facilities have a stated capacity; the others are counted as sites only.
Market snapshot
Pure DC data centers: key facts
- Capacity under construction or planned (188 MW) is 5.5 times the operational base of 34 MW.
- Its largest operational site is Pure DC London Brent Cross (LON01) Building 1 in London, United Kingdom at 20 MW.
- The largest project in the pipeline is Amsterdam Westpoort (AMS01) by Pure DC (78 MW, under construction).
- United Kingdom accounts for 41% of tracked capacity (2 facilities).
- By type, the tracker lists 3 hyperscale and 3 colocation facilities.
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
OperationalUnder construction or planned
Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.
Pure DC development pipeline
Under construction and planned facilities with a stated capacity, largest first. 148 MW under construction and 40 MW planned in total.
| Project | Location | Status | Type | Capacity |
|---|---|---|---|---|
| Amsterdam Westpoort (AMS01)Pure DC | Amsterdam, Netherlands | Under construction | Hyperscale | 78 MW |
| Pure DC London Brent Cross (LON01) Building 2Pure DC | London, United Kingdom | Under construction | Hyperscale | 70 MW |
| Pure DC Dublin DUB02 (Ballycoolin)Pure DC | Dublin, Ireland | Planned | Colocation | 24 MW |
| Pure DC Dublin DUB03 (Ballycoolin)Pure DC | Dublin, Ireland | Planned | Colocation | 16 MW |
Facilities
6 facilities match. Each is checked against its source; source links come with the Excel data.
| Facility | Location | Status | Capacity | Year | Source |
|---|---|---|---|---|---|
Amsterdam Westpoort (AMS01)Hyperscale
History
|
Amsterdam, Netherlands | Under construction | 78 MW total | — | Operator / official |
| Pure DC London Brent Cross (LON01) Building 2Hyperscale | London, United Kingdom | Under construction | 70 MW total | — | Operator / official |
| Pure DC Dublin DUB02 (Ballycoolin)Colocation | Dublin, Ireland | Planned | 24 MW total | — | Operator / official |
| Pure DC London Brent Cross (LON01) Building 1Hyperscale | London, United Kingdom | Operational | 20 MW total | — | Operator / official |
| Pure DC Dublin DUB03 (Ballycoolin)Colocation | Dublin, Ireland | Planned | 16 MW total | — | Operator / official |
Pure DC Dublin DUB01 (Ballycoolin)Colocation
History
|
Dublin, Ireland | Operational | 14 MW total | — | Operator / official |
Market position
How Pure DC compares
Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.
- In Ireland, Pure DC ranks #8 of 15 tracked operators by capacity, with 4.1% of the country’s tracked MW.
- Ireland has 39 tracked data centers from 15 operators: 53 MW operational and 1,278 MW under construction or planned.
- Industrial electricity in Ireland costs 234 USD/MWh (2025, latest official figure).
- In United Kingdom, Pure DC ranks #20 of 54 tracked operators by capacity, with 1% of the country’s tracked MW.
- In Netherlands, Pure DC ranks #3 of 33 tracked operators by capacity, with 12% of the country’s tracked MW.
- Dublin also hosts 10 other tracked data center(s), run by Huntstown Power Company, Amazon Web Services, Vantage Data Centers and EdgeConneX.
- Our Deal Tracker lists 1 deal(s) naming Pure DC, the latest on 4 November 2026.
Data center operators in Ireland
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Red Admiral DC | 1 | — | 250 MW |
| Echelon Data Centres | 2 | — | 200 MW |
| Art Data Centres | 1 | — | 200 MW |
| Herbata | 1 | — | 180 MW |
| Amazon Web Services | 6 | — | 169 MW |
| Huntstown Power Company | 1 | — | 150 MW |
| EdgeConneX | 4 | 25 MW | 37 MW |
| Vantage Data Centers | 1 | — | 52 MW |
All data centers in Ireland Power and policy in Ireland
Data center operators in United Kingdom
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| Apatura | 7 | — | 2,100 MW |
| Elsham Tech Park Ltd (Greystoke) | 1 | — | 1,000 MW |
| QTS | 1 | — | 720 MW |
| ILI Group | 1 | — | 600 MW |
| Ark Data Centres | 10 | 275 MW | 314 MW |
| Humber Tech Park | 1 | — | 386 MW |
| Slough Holdings UK | 1 | — | 300 MW |
| Equinix | 15 | — | 250 MW |
All data centers in United Kingdom Power and policy in United Kingdom
Data center operators in Netherlands
| Operator | Facilities | Operational MW | Pipeline MW |
|---|---|---|---|
| EdgeConneX | 4 | 40 MW | 162 MW |
| CloudHQ | 1 | — | 84 MW |
| Digital Realty | 13 | — | 70 MW |
| NorthC | 14 | 57 MW | — |
| CyrusOne | 1 | 54 MW | — |
| Iron Mountain | 2 | 13.1 MW | 20 MW |
| NTT DATA | 1 | 20.7 MW | — |
| Colt DCS | 2 | 15 MW | — |
All data centers in Netherlands Power and policy in Netherlands
Other data centers in Dublin
- Huntstown data centre campus (Finglas) · Huntstown Power Company · Planned · 150 MW
- AWS Cruiserath Buildings E, F and G (Mulhuddart) · Amazon Web Services · Planned · 73.1 MW
- Vantage Dublin (DUB1) campus · Vantage Data Centers · Planned · 52 MW
- DUB01 · EdgeConneX · Operational · 18 MW
- CyrusOne DUB1 Dublin · CyrusOne · Operational · 14 MW
- DUB02 · EdgeConneX · Operational · 7 MW
- DUB03 · EdgeConneX · Planned · 7 MW
- AWS Cruiserath Building A (Mulhuddart) · Amazon Web Services · Operational
- AWS Cruiserath Building B (Mulhuddart) · Amazon Web Services · Operational
- AWS Cruiserath Building C (Mulhuddart) · Amazon Web Services · Operational
Deals naming Pure DC
- Citigroup Global Markets, First Abu Dhabi Bank, Infranity, ABN AMRO, Allianz Global Investors, SMBC → Pure DC (Pure Data Centres Group) development pipeline and future sites, Europe and Middle East Financing $780.0M
How we build the tracker
- Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
- A second analyst re-opens each source before a facility is published.
- Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
- Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
- Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
- Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
- Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.
Questions
How many data centers does Pure DC operate?
DC Market Insights tracks 6 Pure DC data center(s) in 3 countries as of October 2026: 2 operational, 2 under construction and 2 planned.
Which other companies operate data centers in Ireland?
Besides Pure DC, the largest operators we track in Ireland by capacity are Red Admiral DC, Echelon Data Centres, Art Data Centres, Herbata and Amazon Web Services. The Ireland page lists all 15 operators.
What rules apply to data centers in Ireland?
Our Power & Policy Tracker lists 9 government actions on data centers and power in Ireland, including 2 restriction(s) and 0 incentive scheme(s) in force.
Which other data centers are in Dublin?
Other tracked data centers in Dublin include Huntstown data centre campus (Finglas) (Huntstown Power Company), AWS Cruiserath Buildings E, F and G (Mulhuddart) (Amazon Web Services), Vantage Dublin (DUB1) campus (Vantage Data Centers) and DUB01 (EdgeConneX).
Where does this data come from?
Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.
What does the MW figure mean?
We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.
How exact are the map locations?
When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.
How often is it updated?
The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.
Can I get the data in Excel?
Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.