Data Center Power & Policy in Finland
Every government action on data centers and power in Finland that we have verified: moratoriums, grid rules, incentives, tariffs and plans, with the power indicators that drive site selection.
In short
As of 15 October 2026, DC Market Insights tracks 6 government actions on data centers and power in Finland, 3 of them in force. We have found no moratorium or restriction on new data centers in force in Finland.
Market snapshot
Finland power and policy: key facts
- Industrial electricity price: 58.4 USD/MWh (2025). Rank 16 of 16 tracked countries, highest first.
- Renewable share of electricity generation: 57% (2024). Rank 7 of 27 tracked countries, highest first.
- Grid emission factor: 0.03 kgCO2/kWh (2025). Rank 19 of 20 tracked countries, highest first.
- Latest change: Draft Electricity Market Act amendment: priority procedure for grid connection offers when capacity is short, data centres kept out of the top group (Ministry of Economic Affairs and Employment (TEM), 8 Oct 2026).
- By type: 2 grid access, 1 restriction, 1 regulation and 1 power tariff.
Power indicators for Finland
Latest official figure for each indicator, with earlier years where we have them.
In force now in Finland
Grid access (1)
Fingrid technical requirements for large demand facilities connected to the transmission grid, applied immediately from 12 June 2026
On 12 June 2026 Fingrid, the state-owned transmission system operator, published 'Technical requirements for large demand facilities' and applies them immediately to new and modified demand facilities (such as data centres) connected directly to the transmission grid. The content matches the Type D demand facility requirements in the KJV2026 draft grid code (PP-FI-004). Distribution-connected facilities follow once KJV2026 is confirmed by the Energy Authority. Until then the KJV2018 demand grid code stays in force alongside Fingrid's general connection terms.
Power tariff (1)
Electricity used in data centres moved from the lower electricity tax class II to the general class I from 1 July 2026
Act repealing provisions of the Act on Excise Duty on Electricity and Certain Fuels (government bill HE 156/2025, linked to the 2026 budget; Finance Committee report VaVM 28/2025 of 5 Dec 2025 recommended adoption unchanged). From 1 July 2026 electricity consumed in data centres no longer qualifies for tax class II (0.05 c/kWh) and is taxed at the general class I rate of 2.24 c/kWh, an increase of 2.19 c/kWh. The government estimated extra revenue of EUR 47 million a year at 2026 levels. A replacement subsidy scheme for data centres was announced at the same time (see profile) but the government dropped it in the 2027 budget talks (Sept 2026).
2.24 EUR cent/kWh General class I rate now paid by data centres; class II rate was 0.05 c/kWh (increase 2.19 c/kWh). Date = government decision to submit the bill (23 Oct 2025); enactment date not read.
Efficiency rule (1)
Act 846/2024 amending the Energy Efficiency Act: data centres of 500 kW IT power or more brought under EU EED data centre rules
Act 846/2024 (issued 19 Dec 2024, in force 30 Dec 2024; government bill HE 170/2024) adds data centres to the scope of the Energy Efficiency Act and a new chapter 5 b implementing Article 12 of Directive (EU) 2023/1791. Operators of data centres in Finland with installed IT power demand of at least 500 kW must publish the region (maakunta) where the data centre is located (first by 31 Dec 2024, changes by 15 May of the following year) and fall under the EU data centre energy performance reporting scheme. The Energy Authority (Energiavirasto) supervises compliance, with rights to obtain information and inspect premises. Defence, civil-protection and vital-function data centres are exempt.
500 kW Installed IT power demand threshold (vähintään 500 kilowattia)
Announced and proposed
Measures that are not yet in force. Status changes when the rule takes effect or is withdrawn.
Draft Electricity Market Act amendment: priority procedure for grid connection offers when capacity is short, data centres kept out of the top group
The Ministry of Economic Affairs and Employment (TEM) has circulated a draft bill amending the Electricity Market Act to rank grid connection requests when network capacity is insufficient. Group 1 (protected) covers households, most small and medium industry and critical uses, including non-data-centre consumption sites up to 3 MW connection power; data centres are excluded from group 1 and have different limits from other consumption. Groups 2 to 4 would be processed twice a year. A customer that commits flexible generation of at least 80% of the site's peak power on an organised market moves from group 3 to group 2; a commitment to supply from a named power plant is also possible. Fingrid supports the bill and wants it in force as fast as possible. Comments closed around 8-9 Oct 2026; the bill is expected in Parliament later in autumn 2026. Figures as described in Energiateollisuus' c
3 MW Group 1 limit for non-data-centre consumption sites (data centres excluded); flexibility threshold 80% of peak power to move from group 3 to group 2. Date = Energiateollisuus statement on the draft (8 Oct 2026); the government consultation page could not
KJV2026 draft grid code for demand connections: facilities above 30 MW must ride through faults and be able to limit power intake
Fingrid put the KJV2026 grid code specifications for demand connections out for comment from 12 June to 21 August 2026. They cover demand facilities and distribution networks connected to the Finnish power system, with significant requirements for facilities whose rated demand capacity is above 30 MW, naming data centres, electric boilers and electrolysers. Such facilities must withstand grid disturbances (fault ride-through) and be able to limit their power intake from the grid. Planned entry into force is March 2027, after amendments and confirmation by the Energy Authority.
30 MW Rated demand capacity above which significant requirements apply; planned entry into force March 2027
Planned data centre register and registration obligation (government decision of 5 Dec 2025)
The Ministerial Committee on Economic Policy decided on 5 December 2025 to launch a cross-administrative legislative project to create a register of data centres and set related obligations, to give authorities a fuller picture of data centre investments and operations, including security impacts. Security authorities will also examine data centre security. The same decision set out a 10-year electricity-based tax relief for registered data centres that reuse waste heat or exceed the required energy efficiency level (capped at EUR 30 million, from 1 July 2026); that aid was dropped in the 2027 budget talks (1 Sept 2026, reported by Xinhua/Yle). No thresholds or dates for the register are stated yet.
Timeline of data center and power policy in Finland
| Date | Action | Type | Status | Authority |
|---|---|---|---|---|
| 8 Oct 2026 | Draft Electricity Market Act amendment: priority procedure for grid connection offers when capacity is short, data centres kept out of the top group | Restriction | Proposed | Ministry of Economic Affairs and Employment (TEM) |
| 12 Jun 2026 | KJV2026 draft grid code for demand connections: facilities above 30 MW must ride through faults and be able to limit power intake | Grid access | Proposed | Fingrid Oyj; Energy Authority (Energiavirasto) to confirm |
| 12 Jun 2026 | Fingrid technical requirements for large demand facilities connected to the transmission grid, applied immediately from 12 June 2026 | Grid access | In force | Fingrid Oyj (state-owned TSO) |
| 5 Dec 2025 | Planned data centre register and registration obligation (government decision of 5 Dec 2025) | Regulation | Announced | Finnish Government, Ministerial Committee on Economic Policy |
| 23 Oct 2025 | Electricity used in data centres moved from the lower electricity tax class II to the general class I from 1 July 2026 | Power tariff | In force | Ministry of Finance; Parliament of Finland (Eduskunta) |
| 19 Dec 2024 | Act 846/2024 amending the Energy Efficiency Act: data centres of 500 kW IT power or more brought under EU EED data centre rules | Efficiency rule | In force | Energy Authority (Energiavirasto); Ministry of Economic Affairs and Employment |
How Finland compares
Latest official figures for the countries we track.
| Country | Industrial power price | Renewable share | Grid emission factor | Restrictions in force | Incentives in force |
|---|---|---|---|---|---|
| Argentina | — | 19.6% (2025) | 0.28 kgCO2/kWh (2022) | 0 | 2 |
| Australia | — | 39% (2025) | — | 0 | 2 |
| Bangladesh | — | 2% (2025) | — | 0 | 0 |
| Belgium | 183 USD/MWh (2025) | 34.3% (2025) | 0.19 kgCO2/kWh (2024) | 0 | 0 |
| Brazil | — | 86.8% (2025) | 0.07 kgCO2/kWh (2025) | 0 | 1 |
| Chile | — | 66% (2025) | 0.24 kgCO2/kWh (2023) | 0 | 0 |
| Colombia | — | — | 0.22 kgCO2/kWh (2024) | 0 | 2 |
| Denmark | 134 USD/MWh (2025) | 81.5% (2024) | 0.11 kgCO2/kWh (2024) | 1 | 0 |
| Finland | 58.4 USD/MWh (2025) | 57% (2024) | 0.03 kgCO2/kWh (2025) | 0 | 0 |
| France | 104 USD/MWh (2025) | 27% (2025) | 0.02 kgCO2/kWh (2025) | 0 | 1 |
| Germany | 180 USD/MWh (2025) | 58.8% (2025) | 0.34 kgCO2/kWh (2025) | 1 | 0 |
| India | 82.1 USD/MWh (2025) | 28.7% (2026) | 0.68 kgCO2/kWh (2025) | 0 | 5 |
| Indonesia | 62.9 USD/MWh (2024) | 16.3% (2025) | 0.68 kgCO2/kWh (2024) | 0 | 1 |
| Ireland | 234 USD/MWh (2025) | 41.3% (2024) | 0.20 kgCO2/kWh (2025) | 2 | 0 |
| Japan | — | 23.1% (2024) | 0.45 kgCO2/kWh (2024) | 0 | 0 |
| Kazakhstan | — | 14.6% (2025) | 0.81 kgCO2/kWh (2025) | 0 | 0 |
| Malaysia | 105 USD/MWh (2026) | 21% (2025) | 0.74 kgCO2/kWh (2024) | 1 | 1 |
| Nepal | — | — | — | 0 | 0 |
| Netherlands | 148 USD/MWh (2025) | 49% (2025) | 0.20 kgCO2/kWh (2024) | 4 | 0 |
| Pakistan | 97.5 USD/MWh (2026) | 34.7% (2025) | — | 0 | 1 |
| Peru | — | 62.6% (2025) | — | 0 | 1 |
| Russia | — | 17.6% (2025) | — | 2 | 0 |
| Singapore | 189 USD/MWh (2025) | 2.1% (2024) | 0.40 kgCO2/kWh (2024) | 0 | 0 |
| South Korea | — | 9.8% (2025) | — | 0 | 0 |
| Sri Lanka | — | 60.2% (2025) | — | 0 | 0 |
| United Arab Emirates | 120 USD/MWh (2026) | 8.8% (2024) | 0.47 kgCO2/kWh (2024) | 0 | 0 |
| United Kingdom | 234 USD/MWh (2026) | 52.1% (2025) | 0.15 kgCO2/kWh (2026) | 1 | 1 |
| United States | 86.2 USD/MWh (2025) | 24% (2025) | 0.35 kgCO2/kWh (2023) | 0 | 1 |
| Uzbekistan | 83.3 USD/MWh (2026) | 19.4% (2025) | — | 1 | 0 |
Questions
Is there a data center moratorium in Finland?
We have found no moratorium or restriction on new data centers in force in Finland as of 15 October 2026. Proposed or announced measures, if any, are listed in the timeline.
What does electricity cost for data centers in Finland?
The industrial electricity price in Finland was 58.4 USD/MWh in 2025 (Eurostat nrg_pc_205, Finland, band IE (20,000 to 69,999 MWh), excluding VAT and other recoverable taxes: 2025-S1 0.0534 EUR/kWh, 2025-S2 0.0500 EUR/kWh; mean 0.0517 EUR/kWh = 51.7 EUR/MWh x 1.1300 USD/EUR (Eurostat ert_bil_eur_a, 2025 annual average, as u). Data center contracts can differ by voltage level, contract length and location.
How much of Finland’s electricity is renewable?
Renewables supplied 57% of electricity generation in Finland in 2024.
Where does this data come from?
Each action comes from a page we opened: a law, regulation, gazette notice, ministry or regulator release, grid operator notice or investment agency page, and only when official text is not available a company or trade publication. A second analyst re-opens the source before an item is published. Government sources are linked on the page; all sources come with the Excel data.
What counts as a restriction or moratorium?
A government or grid operator rule that stops, pauses, caps or conditions new data center capacity or grid connections, for a country or a region within it. Proposals are shown as proposed until they take effect.
How are power prices compared?
We use each country’s official statistics for industrial or non-household electricity, converted to US dollars per MWh at the average rate for the year where needed, and show the year and source. Contract prices for data centers can differ.
How often is it updated?
Countries are reviewed on a rolling schedule and changes are added as they are announced. Each item shows the date of the action.
Global capacity
How much data center capacity is installed worldwide?
Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.
Choosing a market or a site?
Our analysts prepare country briefings on power, grid access, incentives and permits, with every source, in Excel.