Market at a glance
The Mexico Data Center Cooling market was worth USD 117.2 million in 2025 and is forecast to reach USD 549.4 million by 2035, growing at a 16.71% CAGR.
Key findings
Querétaro AI Campuses Moving from Land to Fit-Out
Dry Coolers Replace Cooling Towers in the Bajío
Transmission Queues in Querétaro
Maintenance Contracts on 2,375 MW of Halls
What is inside the report
- 01Introduction
- 02Executive Summary
- 03Market Dynamics
- 04Pricing Analysis
- 05Regulation and Standards
- 06Market Segmentation by Component
- 07Market Segmentation by Heat Removal Method
- 08Market Segmentation by Facility Type
- 09Market Segmentation by Heat Rejection
- 10DC Exclusive: Mexico Campus Cooling Pipeline Tracker
- 16chapters
- 2020-2024Historical period
- 2026-2035Forecast period
- —Companies profiled
Segmentation
Recent developments
CloudHQ raised its Querétaro campus to nearly USD 6 billion and about 1,000 MW of power capacity (Source: CloudHQ).
CFE and MEXDC agreed a route to review 1,705 MW of new data center demand with three pilot projects (Source: CFE).
KIO said it will invest more than USD 200 million in Mexico during 2026 (Source: KIO Data Centers).
ODATA energised QR03, planned for up to 300 MW of IT (Source: ODATA).
CFE energised 26.8 MW for AWS, Abbott and ODATA in Querétaro (Source: CFE).
Fermaca presented Fermaca Digital City in Durango as a 250 MW AI-ready campus (Source: Fermaca).
Full analysis
The Mexico Data Center Cooling Market is valued at USD 187.08 million in 2026 and is projected to reach USD 549.43 million by 2035, up from USD 117.22 million in 2025, a CAGR of 16.71% from 2025 to 2035 (DC Market Insights estimate). Mexican cooling spend is set by one constraint more than any other: Querétaro holds 72% of the country’s data center operations according to the Querétaro Ministry of Sustainable Development (SEDESU, September 2026), and the state is water-stressed, so every new hall there is designed around how little water its heat rejection can use. That is why the 2025 receipt leans on air-cooled and closed-loop plant: 60 MW of new IT capacity completed in 2025, of which 28% was AI capacity, cooled at USD 1.12 million per conventional MW and USD 1.80 million per liquid-cooled AI MW, gave USD 89.98 million of new-build cooling, plus USD 16.61 million of maintenance on 226 MW of operating halls and USD 10.62 million of retrofits and enterprise refresh. The Mexico Data Center Cooling Market covers cooling equipment, its installation and commissioning, and cooling maintenance services bought for data center halls in Mexico; direct-to-chip liquid cooling is the fastest heat removal method at 23.74% a year, and North-Central and Northwest Mexico is the fastest region at 39.63% a year because Fermaca’s 250 MW AI-ready campus in Durango moves load away from the water-stressed Bajío.
Key Market Statistics: What Is Mexico’s Data Center Cooling Spend in 2026?
DC Market Insights estimates Mexican data center cooling spend at USD 187.08 million in 2026, 59.60% above the USD 117.22 million of 2025, as the first AI halls in Querétaro move from shell to fit-out.
- Market size 2025: USD 117.22 million (DC Market Insights estimate).
- Market size 2026: USD 187.08 million.
- Market size 2030: USD 517.01 million.
- Market size 2035: USD 549.43 million.
- CAGR 2025-2035: 16.71% base case, 14.13% in the low case and 19.05% in the high case.
- Largest segment: Cooling Equipment, USD 78.48 million or 66.95% of 2025 spend.
- Fastest heat removal method: Direct-to-Chip Liquid Cooling, 23.74% a year to USD 281.22 million in 2035.
- Leading region: Bajío (Querétaro and Guanajuato), 70.0% of 2025 spend.
- Fastest region: North-Central and Northwest Mexico, 39.63% a year.
- Largest state: Querétaro, USD 75.02 million in 2025.
- Market leader: Vertiv, with an estimated 18% to 22% share of 2025 equipment value (DC Market Insights estimate).
Key Takeaways: What Should a Cooling Supplier Selling into Mexico Know?
- Mexican cooling spend grows 59.60% in 2026 because 75 MW of new IT capacity completes and half of the 150 MW due in 2027 is already being fitted out.
- Direct-to-chip liquid cooling rises from 28.51% to 51.18% of the market by 2035 because AI capacity reaches 62% of new Mexican megawatts.
- Water-cooled chillers and cooling towers fall from 18.0% to 7.0% of spend because Querétaro operators now design for near-zero cooling water.
- Spend flattens near USD 517.01 million after 2030 because completions peak at 300 MW in 2030 and service revenue, not new plant, carries the late years.
Executive Summary: How Fast Has Mexican Cooling Spend Grown Since 2020?
The Mexico Data Center Cooling Market size was valued at USD 35.82 million in 2020, reached USD 117.22 million in 2025, and is anticipated to reach USD 549.43 million by 2035, at a CAGR of 16.71% during the forecast period. Spend grew 26.76% a year from 2020 to 2025 as Microsoft, Google and Amazon Web Services (AWS) opened cloud regions in the Bajío.
| Attribute | Value |
|---|---|
| Historical period | 2020-2024 |
| Base year | 2025 |
| Forecast period | 2026-2035 |
| Market size 2025 | USD 117.22 million |
| Market size 2026 | USD 187.08 million |
| CAGR 2025-2035 | 16.71% |
| Market size 2035 | USD 549.43 million |
The Mexico Data Center Cooling Market follows the construction curve with a one-year lead: DC Market Insights books half of each year’s cooling plant in the year before a hall opens. Completions rise from 60 MW in 2025 to 300 MW in 2030, so spend climbs to USD 517.01 million in 2030 (a 34.55% CAGR over five years) and then grows only 1.22% a year to 2035, when maintenance of a 2,375 MW installed base makes up 28.81% of the market.

Market Scope: Which Cooling Equipment and Services Does the Mexico Data Center Cooling Market Include?
The Mexico Data Center Cooling Market covers USD 117.22 million of 2025 spend on the plant that removes heat from data center white space in Mexico, and the services that keep it running.
Included: computer room air handlers and air conditioners, in-row and rear-door coolers, chillers (air-cooled with free cooling and water-cooled), dry coolers and adiabatic coolers, cooling towers, coolant distribution units, cold plates sold as part of a facility loop, immersion tanks, chilled-water pipework inside the cooling package, installation and commissioning, and preventive and corrective maintenance contracts. Hyperscale self-build, wholesale and retail colocation, and enterprise and government sites are all counted.
Excluded: the electricity that runs the cooling plant, hot- and cold-aisle containment, thermal monitoring software and sensors (these sit in the wider Mexico Data Center Thermal Management Market), server fans and heat sinks shipped inside IT equipment, building shells, and comfort air conditioning for offices.
How the segments fit together: every 2025 dollar is counted once under each of four dimensions (component, heat removal method, facility type and heat rejection), and each dimension sums to USD 117.22 million. The market is a subset of the Mexico Data Center Market, where cooling is one line of facility spend.
Why Do Estimates of Mexico’s Data Center Cooling Market Differ?
Published figures for Mexican data center cooling differ by more than five times; this edition puts 2026 spend at USD 187.08 million.
The earlier DC Market Insights edition of this page valued 2025 at USD 685.35 million. That figure was built top-down from a share of national data center spend and counted comfort cooling, containment and part of the cooling electricity bill. The capacity count does not support it: the Mexican Data Center Association (MEXDC) reported 115 MW of installed capacity in 2023 and 279 MW expected in 2026 (April 2026), and cooling plant for 60 MW of 2025 completions cannot cost USD 685 million when a fully fitted AI hall needs about USD 1.80 million of cooling per megawatt. Broader definitions also add the power used by chillers and fans, server-level air movers, and hot- and cold-aisle containment, which are left out here and described in prose rather than valued.
| Element | Counted here? | Why |
|---|---|---|
| Chillers, air handlers, dry coolers, CDUs | Yes, USD 78.48 million | Facility cooling equipment bought per hall |
| Installation and commissioning | Yes, USD 22.13 million | Capitalised with the equipment |
| Maintenance contracts | Yes, USD 16.61 million | Recurring spend on operating halls |
| Containment and thermal software | No | Counted in thermal management |
| Cooling electricity | No | Operating cost, not equipment or service revenue |
In-scope buyers include small and medium enterprises running on-premises server rooms classed as data centers, government sites and regional colocation in Monterrey and Guadalajara, not only the Querétaro hyperscale campuses.
Market Drivers: Which Mexican Projects Are Buying Cooling in 2026?
Three named build programmes explain most of the 59.60% rise in Mexican cooling spend in 2026: the Querétaro AI campuses, the federal Coatlicue supercomputer and the hyperscale cloud regions already live.
Querétaro AI Campuses Moving from Land to Fit-Out
ODATA energised its QR03 campus in February 2026, a project of more than USD 3 billion planned for up to 300 MW of IT with a 72 MW first building (Source: ODATA). CloudHQ raised its Querétaro campus to nearly USD 6 billion and about 1,000 MW of power capacity in October 2026 (Source: CloudHQ). KIO Data Centers said in August 2026 it will invest more than USD 200 million in Mexico during 2026 and about USD 1.3 billion in a 100 MW QRO3 expansion through 2030 (Source: KIO). DC Market Insights estimates these three programmes alone carry USD 1.89 billion of cooling content at a blended USD 1.45 million per MW.
Coatlicue Brings Liquid Cooling to Government Computing
The federal government announced the Coatlicue public supercomputer in November 2025: MXN 6 billion, about 14,480 GPUs and roughly 200 liquid-cooled cabinets (Source: Government of Mexico). It is the first large Mexican order for a facility liquid loop outside a hyperscale campus, and DC Market Insights counts it in the Enterprise and Government segment, which holds USD 17.58 million of 2025 spend.
Cloud Regions Set an Air-Cooled, Low-Water Design Norm
Amazon announced its Mexico (Central) Region in January 2025 with more than USD 5 billion of investment over 15 years and said the region is air-cooled and does not require ongoing cooling water. Microsoft said in May 2024 that its Mexico Central hyperscale region had started operations, and Google opened its 41st cloud region in Querétaro in December 2024 (Source: Google). These three buyers set the specification that colocation suppliers now copy: air-cooled chillers with free cooling held 52.0% of 2025 spend.
Market Trends: How Is Mexican Data Center Cooling Design Changing?
Mexican cooling design is shifting in two directions at once: from water to dry heat rejection, and from room air to liquid at the chip, which together move USD 274.72 million of 2035 spend into dry and adiabatic coolers.
Dry Coolers Replace Cooling Towers in the Bajío
A July 2026 initiative in the Querétaro State Congress proposed limits on data center water use (Source: Querétaro State Congress), adding to the AWS no-cooling-water design of 2025. DC Market Insights estimates dry and adiabatic coolers grow 22.82% a year, from 30.0% of 2025 spend to 50.0% in 2035, while water-cooled chillers and cooling towers grow only 6.19% a year.
Rear-Door Heat Exchangers as the Retrofit Bridge
Older halls in Mexico City and the State of Mexico cannot take a facility water loop to every rack, so operators add rear-door coolers to reach 30 kW to 50 kW racks. DC Market Insights counts 3% of the prior year’s installed megawatts as retrofitted each year at USD 0.60 million per MW, which puts rear-door heat exchangers at USD 6.04 million in 2025 and USD 49.25 million in 2035.
Altitude Gives Querétaro Free-Cooling Hours
Querétaro sits at about 1,800 metres, with cool nights for much of the year, so air-cooled chillers with economisers can run compressor-free for part of the day. That keeps the conventional cooling content at USD 1.12 million per MW in 2025, below the USD 1.20 million used for coastal Latin American sites in the Latin America Data Center Thermal Management Market.
Market Challenges: What Slows Cooling Orders in Mexico?
Grid connection, not cooling technology, sets the pace: the Comisión Federal de Electricidad (CFE) and MEXDC agreed in September 2026 to review 1,705 MW of new data center demand through three pilot projects (Source: CFE), and halls without power do not order chillers.
Transmission Queues in Querétaro
CFE plans about MXN 9 billion for Querétaro transmission and substations from 2026 to 2030 and transmission works adding up to 800 MW of capacity (Source: CFE). CFE energised only 26.8 MW in Querétaro in January 2026, of which 2 MW went to AWS, 6 MW to Abbott and 18.8 MW to ODATA (Source: CFE). In the DC Market Insights low case, two years of grid delay cut 2035 spend by 20% to USD 439.54 million.
Water Politics and Permit Risk
President Claudia Sheinbaum said in August 2026 that Mexico need not be the data center of other countries and that grid works could take one to three years (Source: Presidency of Mexico). Any water cap would raise cooling capex by about USD 0.15 million per MW for dry heat rejection, a 13% premium on conventional halls (DC Market Insights estimate).
Market Opportunities: Where Can Cooling Suppliers Win New Revenue in Mexico?
Two revenue pools grow faster than the 16.71% market rate: service contracts on a fast-growing installed base and liquid loops for AI halls outside Querétaro.
Maintenance Contracts on 2,375 MW of Halls
Maintenance and cooling services grow from USD 16.61 million in 2025 to USD 158.31 million in 2035, 25.29% a year, because the installed base rises tenfold from 226 MW. At USD 62,000 per operating MW-year in 2025, a supplier with a Querétaro service depot can price multi-site contracts across ODATA, KIO and CloudHQ halls.
Liquid Loops for Durango and Nuevo León
Fermaca announced Fermaca Digital City in Durango as a 250 MW AI-ready campus in December 2025 (Source: Fermaca), and the Nuevo León government announced a high-performance computing and AI center with USD 1 billion of initial investment in November 2025 (Source: Government of Nuevo León). DC Market Insights values the Durango campus alone at USD 362.56 million of cooling content over its build-out.
Pricing: How Much Does It Cost to Cool a Megawatt in Querétaro?
A conventional air-cooled hall in Mexico needs about USD 1.12 million of cooling plant per megawatt of IT load in 2025, and a liquid-cooled AI hall about USD 1.80 million (DC Market Insights estimates).
| Price point | 2020 | 2025 | 2030 | 2035 |
|---|---|---|---|---|
| Air cooling, USD million per MW | 1.07 | 1.12 | 1.18 | 1.24 |
| Liquid cooling for AI halls, USD million per MW | 1.89 | 1.80 | 1.71 | 1.63 |
| Cooling maintenance, USD thousand per operating MW-year | 58.4 | 62.0 | 65.8 | 69.9 |
Air cooling prices rise 1% a year with copper, steel and refrigerant costs, while liquid cooling prices fall 1% a year as coolant distribution unit volumes grow. Public anchors: ODATA’s QR03 at more than USD 3 billion for 300 MW implies USD 10 million per MW of total facility cost, of which cooling at USD 1.45 million is about 14.5% (DC Market Insights estimate); KIO’s QRO3 expansion at about USD 1.3 billion for 100 MW implies USD 13 million per MW including IT-ready fit-out.
Regulation: Which Mexican Rules Shape Data Center Cooling Design?
Four federal measures shape Mexican cooling choices, and the strongest is power law: the Ley del Sector Eléctrico of 18 March 2025 raised the generation permit threshold to 0.7 MW (Source: Diario Oficial de la Federación).
- The Diario Oficial de la Federación agreement of September 2025 created a simplified procedure for grid-connected self-supply of 0.7 MW to 20 MW, so operators can add on-site generation that lowers the effective cost of each kilowatt-hour spent on cooling.
- The Plan México decree published in the Diario Oficial de la Federación on 21 January 2025 allows immediate deduction of new fixed assets until 30 September 2030 (Source: Secretaría de Hacienda), which brings forward chiller and coolant distribution unit purchases.
- National Water Commission (CONAGUA) concessions govern groundwater for cooling towers; the July 2026 Querétaro initiative would add state reporting of data center water use (Source: Querétaro State Congress).
- ASHRAE TC 9.9 thermal guidelines and Uptime Institute tier design rules are the working standards in tenders, with refrigerant choices following the Kigali Amendment to the Montreal Protocol, which Mexico ratified in 2018 (Source: United Nations Environment Programme).
Market Segmentation: Which Cooling Segment Earns the Most in Mexico?
Cooling Equipment earns USD 78.48 million, 66.95% of 2025 Mexican data center cooling spend, while maintenance services grow fastest at 25.29% a year.
By Component: Cooling Equipment Leads, Services Grow Fastest
Equipment and installation follow completions; services follow the installed base, which is why their share rises from 14.17% to 28.81%.
| Component | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Cooling Equipment | 78.48 | 67.0% | 305.07 | 14.54% |
| Installation and Commissioning | 22.13 | 18.9% | 86.05 | 14.55% |
| Maintenance and Cooling Services | 16.61 | 14.2% | 158.31 | 25.29% |
By Heat Removal Method: Direct-to-Chip Overtakes Room Air by 2035
Perimeter and in-row air cooling still holds 63.37% of 2025 spend, but direct-to-chip liquid cooling reaches USD 281.22 million in 2035 and becomes the largest method.
| Heat Removal Method | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Perimeter and In-Row Air Cooling | 74.28 | 63.4% | 190.67 | 9.89% |
| Rear-Door Heat Exchangers | 6.04 | 5.2% | 49.25 | 23.35% |
| Direct-to-Chip Liquid Cooling | 33.42 | 28.5% | 281.22 | 23.74% |
| Immersion Cooling | 3.48 | 3.0% | 28.29 | 23.31% |
By Facility Type: Wholesale Campuses Grow Fastest
Wholesale colocation campuses grow 20.11% a year because ODATA, KIO, CloudHQ and Terranova build to lease whole halls to cloud and AI tenants.
| Facility Type | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Hyperscale and Cloud Self-Build | 44.54 | 38.0% | 225.27 | 17.60% |
| Wholesale Colocation Campuses | 35.17 | 30.0% | 219.77 | 20.11% |
| Retail Colocation | 19.93 | 17.0% | 65.93 | 12.71% |
| Enterprise and Government | 17.58 | 15.0% | 38.46 | 8.14% |
By Heat Rejection: Water-Free Designs Win
Dry and adiabatic coolers become the largest heat rejection type by 2035 at USD 274.72 million, 50.0% of spend.
| Heat Rejection | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Air-Cooled Chillers with Free Cooling | 60.95 | 52.0% | 236.25 | 14.51% |
| Dry Coolers and Adiabatic Coolers | 35.17 | 30.0% | 274.72 | 22.82% |
| Water-Cooled Chillers and Cooling Towers | 21.10 | 18.0% | 38.46 | 6.19% |
DC Exclusive: The Mexico Campus Cooling Pipeline Tracker, 4 Named Campuses and 1,550 MW
DC Market Insights tracks 1,550 MW of announced IT capacity on four named Mexican campuses that carry an estimated USD 2.25 billion of cooling content; the tracker is a DC Market Insights model built on 7 inputs (4 announced campus capacities and 3 unit costs).
| Campus | State | Announced IT MW | Cooling content, USD million (DC Market Insights estimate) | Source of capacity |
|---|---|---|---|---|
| CloudHQ Querétaro campus | Querétaro | 900 | 1,305.21 | CloudHQ, 2025-2026 |
| ODATA QR03 | Querétaro | 300 | 435.07 | ODATA, February 2026 |
| Fermaca Digital City | Durango | 250 | 362.56 | Fermaca, December 2025 |
| KIO QRO3 expansion | Querétaro | 100 | 145.02 | KIO, August 2026 |
| Total | 3 states | 1,550 | 2,247.87 | – |
Each campus is valued at a blended USD 1.45 million per MW: 50% of capacity at the 2028 air rate of USD 1.15 million and 50% at the 2028 liquid rate of USD 1.75 million. The 1,550 MW is 1.5 times the 1,035 MW the model completes from 2026 to 2030, so DC Market Insights assumes a good part of the CloudHQ campus lands after 2030. Terranova’s Querétaro campus (land and power for up to 1 GW) and AWS’s air-cooled region are tracked but not valued, because no IT capacity has been published.
Regional Insights: Which Mexican Region Spends the Most on Data Center Cooling?
The Bajío leads with USD 82.06 million, 70.0% of 2025 Mexican cooling spend, and North-Central and Northwest Mexico grows fastest at 39.63% a year.
| Region | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Bajío (Querétaro and Guanajuato) | 82.06 | 70.0% | 335.16 | 15.11% |
| Valley of Mexico (Mexico City and State of Mexico) | 17.58 | 15.0% | 54.94 | 12.07% |
| Northeast (Nuevo León and Coahuila) | 10.55 | 9.0% | 65.93 | 20.11% |
| West and South (Jalisco, Hidalgo and other states) | 4.69 | 4.0% | 27.47 | 19.34% |
| North-Central and Northwest (Durango, Chihuahua, Sonora, Baja California) | 2.34 | 2.0% | 65.93 | 39.63% |
Bajío (Querétaro and Guanajuato)
The Bajío grows 15.11% a year to USD 335.16 million; Querétaro alone has more than USD 12 billion of announced data center investment according to SEDESU head Marco Del Prete (August 2026).
Valley of Mexico (Mexico City and State of Mexico)
The Valley of Mexico holds USD 17.58 million and grows 12.07% a year, led by retrofits of older enterprise and carrier halls and Scala’s 5 MW Tepotzotlán site, a USD 80 million project (Source: Scala Data Centers, September 2023).
Northeast (Nuevo León and Coahuila)
The Northeast grows 20.11% a year to USD 65.93 million; Oracle runs a cloud region in Monterrey inside the Telmex-Triara data center (Source: Oracle, September 2023).
West and South (Jalisco, Hidalgo and other states)
The West and South reaches USD 27.47 million by 2035 at 19.34% a year, from enterprise and edge sites around Guadalajara.
North-Central and Northwest (Durango, Chihuahua, Sonora, Baja California)
This region rises from USD 2.34 million to USD 65.93 million, 39.63% a year, almost all of it from the Fermaca campus in Durango, whose dry, high-altitude climate suits dry coolers.
State Analysis: Which Mexican States Buy the Most Data Center Cooling?
Querétaro buys USD 75.02 million of data center cooling in 2025, 64.0% of the national market, and Durango is the fastest-growing large state at 42.72% a year.
| Rank | State | Region | 2025 (USD million) | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|---|
| 1 | Querétaro | Bajío | 75.02 | 291.20 | 14.53% |
| 2 | Estado de México | Valley of Mexico | 10.55 | 32.97 | 12.07% |
| 3 | Nuevo León | Northeast | 8.79 | 54.94 | 20.11% |
| 4 | Guanajuato | Bajío | 7.03 | 43.95 | 20.12% |
| 5 | Mexico City | Valley of Mexico | 7.03 | 21.98 | 12.07% |
| 6 | Jalisco | West and South | 2.93 | 19.23 | 20.70% |
| 7 | Coahuila | Northeast | 1.76 | 10.99 | 20.10% |
| 8 | Durango | North-Central and Northwest | 1.41 | 49.45 | 42.72% |
| 9 | Hidalgo | West and South | 1.17 | 5.49 | 16.72% |
| 10 | Chihuahua | North-Central and Northwest | 0.59 | 6.59 | 27.29% |
| 11 | Baja California | North-Central and Northwest | 0.47 | 4.40 | 25.06% |
| 12 | Sonora | North-Central and Northwest | 0.23 | 4.40 | 34.33% |
The top 12 states hold 99.8% of 2025 spend; the remainder sits in other states. Nuevo León (20.11% a year) and Guanajuato (20.12%) take load that cannot get a Querétaro grid connection before 2028.
Forecast Scenarios: How Could Mexico’s 2035 Cooling Market Change?
DC Market Insights puts 2035 Mexican data center cooling spend between USD 439.54 million and USD 670.30 million, around a USD 549.43 million base case.
| Scenario | 2035 (USD million) | CAGR 2025-2035 | What has to happen |
|---|---|---|---|
| Low | 439.54 | 14.13% | CFE transmission slips two years and a Querétaro water cap delays permits |
| Base | 549.43 | 16.71% | Completions reach 300 MW in 2030, AI share 62% of new MW by 2035 |
| High | 670.30 | 19.05% | The 1,705 MW CFE pipeline connects on time and the full CloudHQ campus is built by 2032 |
Key Players and Market Share: Who Supplies Data Center Cooling in Mexico?
The top three suppliers, Vertiv, Schneider Electric and Trane Technologies, hold an estimated 45% to 52% of 2025 Mexican cooling equipment value, based on DC Market Insights’ count of named hall awards and the supplier footprint in Mexico.
- Vertiv
- Schneider Electric
- Trane Technologies
- Carrier
- Johnson Controls
- Daikin Applied
- Stulz
- Mitsubishi Electric
- LG Electronics
- Rittal
- nVent
- CoolIT Systems
- Munters
- Modine (Airedale)
- Danfoss
Vertiv announced in March 2026 that its Mexicali plant expansion will raise its regional manufacturing capacity by about 45%, which shortens lead times for Mexican orders. Equinix reported in October 2019 that it agreed to buy three Axtel data centers for USD 175 million, two of them in Querétaro serving the Mexico City metro, which made it one of the largest retail colocation buyers of cooling maintenance in the country. Local service firms win most maintenance work on enterprise sites, which is why service concentration is lower than equipment concentration (DC Market Insights estimate: top three under 30% of services).
Recent Developments: What Has Changed in Mexican Data Center Cooling Since 2025?
- In October 2026, CloudHQ raised its Querétaro campus to nearly USD 6 billion and about 1,000 MW of power capacity (Source: CloudHQ).
- In September 2026, CFE and MEXDC agreed a route to review 1,705 MW of new data center demand with three pilot projects (Source: CFE).
- In August 2026, KIO said it will invest more than USD 200 million in Mexico during 2026 (Source: KIO Data Centers).
- In February 2026, ODATA energised QR03, planned for up to 300 MW of IT (Source: ODATA).
- In January 2026, CFE energised 26.8 MW for AWS, Abbott and ODATA in Querétaro (Source: CFE).
- In December 2025, Fermaca presented Fermaca Digital City in Durango as a 250 MW AI-ready campus (Source: Fermaca).
Research Methodology: How the Model Counts Mexican Cooling Spend
DC Market Insights built the Mexico Data Center Cooling Market from 10 inputs, one capacity series of 16 years, 4 segment dimensions, 5 regions and 12 states, reconciled so every split sums to the total in every year.
Receipt for 2025: new-build cooling = 50% of 60 MW completed in 2025 and 50% of 75 MW due in 2026, each split 72% conventional at USD 1.12 million per MW and 28% to 34% AI at USD 1.80 million per MW = USD 89.98 million; retrofits = 3% of 168 MW installed at end-2024 × USD 0.60 million = USD 3.02 million; enterprise and government refresh = 100 MW × 8% × USD 0.95 million = USD 7.60 million; services = (168 MW + 100 MW) × USD 62,000 = USD 16.61 million; total USD 117.22 million. The installed base is calibrated to MEXDC’s 115 MW for 2023 and 279 MW for 2026 (model: 129 MW and 299 MW, including sites MEXDC does not survey), and completions follow the Mexico AI Data Center Market.
Three bound checks: (1) ceiling, Mexican cooling must sit below Mexican thermal management, and USD 117.22 million is 94.8% of the USD 123.62 million Mexico row in the Latin America thermal model; (2) ceiling, the AI liquid share of USD 37.71 million is below the USD 82.28 million cooling line of the Mexico AI data center model, which also counts containment and air plant in AI halls; (3) floor, ODATA’s 72 MW first QR03 building alone needs about USD 80.64 million of air cooling at USD 1.12 million per MW. Full method notes are in our research methodology.
Table of contents
- 01Introduction
- 1.1Market Definition and Scope
- 1.2Included and Excluded Spend
- 1.3How the Segments Fit Together
- 1.4Why Estimates Differ
- 02Executive Summary
- 2.1Market Snapshot, 2025, 2026 and 2035
- 2.2Key Market Statistics
- 2.3Key Takeaways
- 2.4Market Size, 2020-2035
- 03Market Dynamics
- 3.1Querétaro AI Campuses Moving from Land to Fit-Out
- 3.2Coatlicue Brings Liquid Cooling to Government Computing
- 3.3Cloud Regions Set an Air-Cooled, Low-Water Design Norm
- 3.4Dry Coolers Replace Cooling Towers in the Bajío
- 3.5Rear-Door Heat Exchangers as the Retrofit Bridge
- 3.6Altitude Gives Querétaro Free-Cooling Hours
- 3.7Transmission Queues in Querétaro
- 3.8Water Politics and Permit Risk
- 3.9Maintenance Contracts on 2,375 MW of Halls
- 3.10Liquid Loops for Durango and Nuevo León
- 04Pricing Analysis
- 4.1Air Cooling Cost per MW, 2020-2035
- 4.2Liquid Cooling Cost per MW, 2020-2035
- 4.3Maintenance Cost per Operating MW-Year
- 4.4Public Price Anchors
- 05Regulation and Standards
- 5.1Ley del Sector Eléctrico
- 5.2Self-Supply Agreement of September 2025
- 5.3Plan México Immediate Deduction
- 5.4CONAGUA Concessions and Querétaro Water Reporting
- 5.5ASHRAE and Kigali Amendment
- 06Market Segmentation by Component
- 6.1Cooling Equipment
- 6.2Installation and Commissioning
- 6.3Maintenance and Cooling Services
- 07Market Segmentation by Heat Removal Method
- 7.1Perimeter and In-Row Air Cooling
- 7.2Rear-Door Heat Exchangers
- 7.3Direct-to-Chip Liquid Cooling
- 7.4Immersion Cooling
- 08Market Segmentation by Facility Type
- 8.1Hyperscale and Cloud Self-Build
- 8.2Wholesale Colocation Campuses
- 8.3Retail Colocation
- 8.4Enterprise and Government
- 09Market Segmentation by Heat Rejection
- 9.1Air-Cooled Chillers with Free Cooling
- 9.2Dry Coolers and Adiabatic Coolers
- 9.3Water-Cooled Chillers and Cooling Towers
- 10DC Exclusive: Mexico Campus Cooling Pipeline Tracker
- 10.1CloudHQ Querétaro Campus
- 10.2ODATA QR03
- 10.3Fermaca Digital City
- 10.4KIO QRO3 Expansion
- 11Regional Insights
- 11.1Bajío (Querétaro and Guanajuato)
- 11.2Valley of Mexico (Mexico City and State of Mexico)
- 11.3Northeast (Nuevo León and Coahuila)
- 11.4West and South (Jalisco, Hidalgo and other states)
- 11.5North-Central and Northwest (Durango, Chihuahua, Sonora, Baja California)
- 12State Analysis
- 12.1Querétaro
- 12.2Estado de México
- 12.3Nuevo León
- 12.4Guanajuato
- 12.5Mexico City
- 12.6Jalisco
- 12.7Coahuila
- 12.8Durango
- 12.9Hidalgo
- 12.10Chihuahua
- 12.11Baja California
- 12.12Sonora
- 13Forecast Scenarios
- 13.1Low Scenario
- 13.2Base Scenario
- 13.3High Scenario
- 14Competitive Insights
- 14.1Market Concentration
- 14.2Vertiv
- 14.3Schneider Electric
- 14.4Trane Technologies
- 14.5Carrier
- 14.6Johnson Controls
- 14.7Daikin Applied
- 14.8Stulz
- 14.9Mitsubishi Electric
- 14.10LG Electronics
- 14.11Rittal
- 14.12nVent
- 14.13CoolIT Systems
- 14.14Munters
- 14.15Modine (Airedale)
- 14.16Danfoss
- 15Recent Developments
- 15.1CloudHQ, October 2026
- 15.2CFE and MEXDC, September 2026
- 15.3KIO, August 2026
- 15.4ODATA, February 2026
- 15.5CFE, January 2026
- 15.6Fermaca, December 2025
- 16Research Methodology
- 16.1The 2025 Receipt
- 16.2Capacity Calibration
- 16.3Bound Checks
- Fig. 1Mexico Data Center Cooling Market Size, 2020-2035
- Table 1Executive Summary Attributes
- Table 2Scope Comparison
- Table 3Cooling Price Points, 2020-2035
- Table 4Market by Component
- Table 5Market by Heat Removal Method
- Table 6Market by Facility Type
- Table 7Market by Heat Rejection
- Table 8Mexico Campus Cooling Pipeline Tracker
- Table 9Market by Region
- Table 10Top 12 States
- Table 11Forecast Scenarios, 2035
About this report
Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.
Read our methodologyHow we built this
- Historical period2020-2024
- Base year2025
- Forecast period2026-2035
- Sizing approachTop-down + bottom-up
Need more than the report?
Advisory on this market
Due diligence, site selection and market entry work, by the analysts who wrote this report.
See consulting servicesFrequently asked questions
USD 187.08 million in 2026, up 59.60% from USD 117.22 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 549.43 million by 2035, a CAGR of 16.71% from 2025 to 2035.
16.71% a year from 2025 to 2035 in the base case, between 14.13% and 19.05% in the low and high cases, because new Mexican IT capacity rises from 60 MW in 2025 to 300 MW in 2030.
Cooling Equipment, at USD 78.48 million or 66.95% of 2025 spend, covering chillers, air handlers, dry coolers and coolant distribution units bought for new halls.
Maintenance and cooling services, at 25.29% a year to USD 158.31 million in 2035; among heat removal methods, direct-to-chip liquid cooling grows fastest at 23.74% a year as AI reaches 62% of new capacity.
About USD 1.12 million per MW for an air-cooled hall and USD 1.80 million per MW for a liquid-cooled AI hall in 2025, plus about USD 62,000 per MW-year of maintenance, according to DC Market Insights estimates.
The Bajío (Querétaro and Guanajuato), with USD 82.06 million or 70.0% of 2025 spend; Querétaro alone holds 72% of national data center operations according to the state government.
North-Central and Northwest Mexico, at 39.63% a year to USD 65.93 million in 2035, driven by Fermaca’s 250 MW AI-ready campus in Durango.
Water-cooled chillers and cooling towers fall from 18.0% to 7.0% of spend by 2035, while dry and adiabatic coolers rise to 50.0%, because operators such as AWS design Querétaro halls without ongoing cooling water.
Vertiv, Schneider Electric and Trane Technologies hold an estimated 45% to 52% of 2025 equipment value (DC Market Insights estimate), followed by Carrier, Johnson Controls, Daikin Applied and Stulz.
USD 187.08 million in 2026 here, against figures five times higher elsewhere, because broader estimates add cooling electricity, containment and comfort cooling; this estimate counts only cooling plant and services for 279 MW of capacity reported by MEXDC for 2026.
USD 1.89 billion of cooling content, at a blended USD 1.45 million per MW, is DC Market Insights' estimate for ODATA, CloudHQ and KIO programmes in Querétaro combined. ODATA's QR03 is planned for up to 300 MW of IT, with a 72 MW first building.
28.81% of the market in 2035, when maintenance of a 2,375 MW installed base makes up that share. Spend grows only 1.22% a year from 2030 to 2035, so service revenue rather than new plant carries the late years.
Cooling electricity, hot- and cold-aisle containment, thermal monitoring software and sensors, server fans and heat sinks, building shells and office comfort air conditioning are excluded. Containment and thermal software sit in the wider Mexico Data Center Thermal Management Market.
Get this report
How do I get the full report?
Request a quote; we reply by email within one business day.
How and when will I receive the report?
By email, within 24–48 business hours of payment.
How can I pay?
Once you accept the quote, we email you a secure payment link.
Can I see a sample first?
Yes. Request a free sample and we will email it to you.
Can the report be tailored to my needs?
Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.
Can I get an invoice or pay against a purchase order?
Write to sales@dcmarketinsights.com and our team will help.