Sweden AI Data Center Market Size, Share & Forecast to 2035
Market at a glance
The Sweden AI Data Center market was worth USD 153.5 million in 2025 and is forecast to reach USD 1,330.0 million by 2035, growing at a 24.11% CAGR.
Key findings
Microsoft's 20,000-GPU Programme Fills Gävle, Sandviken and Staffanstorp
Sovereign GPU Clusters Arrive in Linköping
A 5,500 MW Queue Behind Mälardalen's Transmission Limits
Converting Stockholm's Air-Cooled Halls for AI
What is inside the report
- 01Introduction
- 02Executive Summary
- 03Why Estimates Differ
- 04Market Drivers
- 05Market Trends
- 06Market Challenges
- 07Market Opportunities
- 08Pricing Analysis
- 09Standards and Regulation
- 10Market Segmentation
- 17chapters
- 2020-2024Historical period
- 2026-2035Forecast period
- —Companies profiled
Segmentation
Recent developments
Brookfield announced up to SEK 95 billion for an AI center in Strängnäs (Source: Brookfield).
Sferical AI launched with 1,152 GPUs in Linköping (Source: Wallenberg Investments).
EcoDataCenter broke ground on its 250 MW Borlänge campus (Source: EcoDataCenter).
Mistral AI and EcoDataCenter agreed on a EUR 1.2 billion AI data center in Borlänge, and atNorth announced 300 MW in Sollefteå (Source: EcoDataCenter; atNorth).
the EuroHPC Joint Undertaking signed the Mimer AI factory contract for Linköping (Source: EuroHPC Joint Undertaking).
Google broke ground in Horndal and Svenska kraftnät published a 9-41 TWh data center demand range for 2050 (Source: Google; Svenska kraftnät).
Full analysis
The Sweden AI Data Center Market is valued at USD 298.44 million in 2026 and is projected to reach USD 1.33 billion by 2035, up from USD 153.53 million in 2025, a CAGR of 24.11% from 2025 to 2035 (DC Market Insights estimate). The Sweden AI Data Center Market covers the facility layer built for artificial intelligence (AI) workloads in Sweden: power trains, liquid and high-density cooling, AI-ready shells and racks, the network fabric inside the hall, and the operations services that run those halls; graphics processing unit (GPU) servers, electricity bills and cloud revenue sit outside it. Cheap northern power, not land, moves the money here: Eurostat put Swedish industrial electricity at EUR 0.0845 per kWh before VAT in 2025, about half the EU average of EUR 0.1618, so AI campuses such as the EUR 1.2 billion Mistral AI and EcoDataCenter build in Borlänge chase grid connections in Dalarna and Norrland. The 2025 receipt is 80 MW of new Swedish IT capacity × 22% AI share = 17.6 MW × USD 7.40 million per MW = USD 130.24 million of new build, plus 5 MW of liquid-cooling retrofits × USD 3.20 million = USD 16.00 million, plus USD 7.29 million of services on the installed AI base. Immersion and Rear-Door Cooling is the fastest cooling segment at 34.80% a year, and Upper and Central Norrland is the fastest region at 34.59% a year because the 300 MW atNorth Sollefteå and the EdgeConneX Skellefteå campuses land there.
Key Market Statistics: How Big Is the Sweden AI Data Center Market in 2026?
DC Market Insights values the Sweden AI Data Center Market at USD 298.44 million in 2026, 94.39% above the USD 153.53 million of 2025, as Microsoft’s GPU halls fill and EcoDataCenter’s Borlänge campus moves to fit-out.
- Market size 2025: USD 153.53 million
- Market size 2026: USD 298.44 million
- Market size 2030: USD 896.72 million
- Market size 2035: USD 1.33 billion
- CAGR 2025-2035: 24.11% (low case 21.06%, high case 26.60%)
- Largest component: Liquid and High-Density Cooling, 36.53% of 2025 value
- Fastest component: Operations Services and Software, 41.86% a year
- Leading region: North Middle Sweden, 32% of 2025 value
- Fastest region: Upper and Central Norrland, 34.59% a year
- Largest location: Kista and Stockholm City, USD 30.71 million in 2025
- Largest buyer type: Hyperscale Self-Build, 48% of 2025 value; market leader Microsoft (DC Market Insights estimate)
Key Takeaways: What Should Buyers Know About the Sweden AI Data Center Market?
- The Sweden AI Data Center Market nearly doubles in 2026 (+94.39%) because new Swedish IT completions rise from 80 MW to 110 MW and the AI share of them rises from 22% to 32%.
- Direct-to-chip liquid cooling grows 31.15% a year because GB300 and Vera Rubin racks, such as those planned for Borlänge, cannot be air-cooled.
- Norrland’s share rises from 8% to 18% by 2035 because Svenska kraftnät already held about 5,500 MW of large data center connection requests in November 2025 and the north has the spare power.
- Operations services grow 41.86% a year because the installed AI base climbs from about 53 MW at the end of 2025 to about 907 MW by the end of 2034.
Executive Summary: How Fast Is the Sweden AI Data Center Market Growing?
The Sweden AI Data Center Market size was valued at USD 6.77 million in 2020, reached USD 153.53 million in 2025, and is anticipated to reach USD 1.33 billion by 2035, at a CAGR of 24.11% during the forecast period.
| Historical period | 2020-2024 |
| Base year | 2025 |
| Forecast period | 2026-2035 |
| Market size 2025 | USD 153.53 million |
| Market size 2026 | USD 298.44 million |
| CAGR 2025-2035 | 24.11% |
| Market size 2035 | USD 1.33 billion |
The Sweden AI Data Center Market grew 86.69% a year from 2020 to 2025 from a base of USD 6.77 million, when AI-class halls were 2% of new Swedish capacity. Growth slows to 24.11% after 2025 because new IT completions level off near 190-211 MW a year from 2030 while the AI share keeps rising from 22% to 62%. Svenska kraftnät’s long-term market analysis of June 2026 puts Swedish data center electricity demand at about 3 TWh today and 9 to 41 TWh by 2050, so the long tail of this forecast is set by grid build-out rather than by chip supply.

Market Scope: What Does the Sweden AI Data Center Market Include?
The Sweden AI Data Center Market covers spending on facility infrastructure for AI-class data center capacity in Sweden, worth USD 153.53 million in 2025. AI-class means halls designed for accelerator racks of 40 kW and above, most of them liquid-cooled.
Included
- Electrical power infrastructure for AI halls: medium-voltage switchgear, transformers, uninterruptible power supply (UPS), busway and backup generation (USD 54.96 million in 2025).
- Liquid and high-density cooling, including retrofits of existing halls (USD 56.08 million).
- Building shell and AI-ready racks, the high-speed network fabric inside the hall, and operations services and software.
Excluded
- GPU servers, storage and accelerators (counted in the AI Data Center Market), land, grid connection fees, electricity, heat sales and GPU rental revenue.
- Conventional halls below 40 kW per rack, which stay in the Sweden Data Center Infrastructure Market (USD 502.31 million in 2025); this market overlaps that report’s AI and HPC row and adds shells, fabric, retrofits and services.
How the segments fit together
Every segment table below sums to the same total each year: component, buyer type, cooling approach and workload each split USD 153.53 million in 2025 and USD 1.33 billion in 2035, and five Swedish regions split the same totals. The wider country picture, including IT and conventional halls, is in the Sweden Data Center Market; this report is the AI-hall slice of it.
Why Do Sweden AI Data Center Market Estimates Differ?
Estimates differ because they count different layers: DC Market Insights puts the 2026 facility layer at USD 298.44 million. Estimates that add GPU servers count several times that figure, since Microsoft alone tied more than 20,000 GPUs to its SEK 33.7 billion Swedish programme. The previous DC Market Insights edition gave USD 127.77 million for 2025 from a top-down share; this edition counts AI-class megawatts bottom-up and gives USD 153.53 million.
| Element | In this report | Why |
|---|---|---|
| Facility infrastructure for AI halls | Yes, USD 146.24 million in 2025 | Core of the market |
| Operations services and software | Yes, USD 7.29 million | Recurring spend on the installed AI base |
| GPU servers and accelerators | No | Counted in the AI Data Center Market |
| GPU cloud and AI-as-a-service revenue | No | Service revenue, not infrastructure |
| Conventional halls below 40 kW per rack | No | Counted in the Sweden Data Center Infrastructure Market |
Broader definitions add AI software platforms, machine learning operations tools, consulting and GPU rental income; none of these are counted here. Waste-heat sales to district heating networks such as Stockholm Exergi are also left out, although heat-recovery equipment inside the hall is counted. Small and medium-sized enterprises (SMEs) are in scope when they buy AI-ready colocation, and they sit inside the Enterprise On-Premises and Colocation and Wholesale rows.
Market Drivers: Why Are AI Data Centers Being Built in Sweden?
Three named programmes worth more than USD 14 billion drive the Sweden AI Data Center Market. They are Microsoft’s SEK 33.7 billion GPU build-out, the EUR 1.2 billion Mistral AI and EcoDataCenter campus and Brookfield’s SEK 95 billion Strängnäs plan, and hyperscale plus colocation buyers hold 78% of the USD 153.53 million spent in 2025.
Microsoft’s 20,000-GPU Programme Fills Gävle, Sandviken and Staffanstorp
Microsoft committed SEK 33.7 billion over two years to cloud and AI infrastructure at its data centers in Sandviken, Gävle and Staffanstorp, with more than 20,000 GPUs, according to Microsoft’s announcement of 3 June 2024. That is why Gävle and Sandviken is the second-largest location at USD 23.03 million in 2025 and Staffanstorp carries USD 12.28 million, and why Hyperscale Self-Build holds 48% of 2025 value (DC Market Insights estimate).
Mistral AI’s EUR 1.2 Billion Borlänge Campus Brings Vera Rubin Racks
Mistral AI and EcoDataCenter agreed in February 2026 on a EUR 1.2 billion AI-focused data center at EcoDataCenter’s Borlänge site, scheduled to open in 2027 with NVIDIA Vera Rubin GPUs, according to the EcoDataCenter release of 11 February 2026. EcoDataCenter broke ground on the Kvarnsveden campus in September 2025 with 250 MW at launch and up to 600 MW later (Source: EcoDataCenter). DC Market Insights models Borlänge rising from 10% of national value in 2025 to 14% by 2035, 28.36% a year.
Brookfield’s SEK 95 Billion Strängnäs Plan Moves AI Capacity Into Mälardalen
Brookfield announced up to SEK 95 billion (USD 10 billion) of investment centred on a new AI center in Strängnäs, with capacity rising from 300 MW to 750 MW over a 10-15 year build, according to the Brookfield release of 4 June 2025. Strängnäs is the fastest large location in the DC Market Insights model at 48.46% a year, from USD 3.07 million in 2025 to USD 159.73 million by 2035, which lifts East Central Sweden to 27.73% a year.
Market Trends: How Are Swedish AI Data Centers Changing?
Liquid cooling is replacing air in the Sweden AI Data Center Market: direct-to-chip systems rise from 38% of 2025 value to 66% by 2035 in the DC Market Insights model.
Sovereign GPU Clusters Arrive in Linköping
AstraZeneca, Ericsson, Saab, SEB and Wallenberg Investments launched Sferical AI in August 2025 with two NVIDIA DGX SuperPODs built on DGX GB300 systems, 1,152 GPUs in total, in Linköping (Source: Wallenberg Investments). The EuroHPC Joint Undertaking signed the contract for the Mimer AI factory supercomputer at Linköping University in April 2026, with a total budget of EUR 29.76 million split between the EU and the Swedish Research Council and installation from 2026, according to the EuroHPC Joint Undertaking contract notice of 21 April 2026. GPU Cloud and Sovereign AI Providers grow 28.36% a year.
Northern Mega-Sites Built for Liquid-Cooled Racks
atNorth announced a 300 MW campus at Hamre Industrial Park in Sollefteå in February 2026, expected to operate from the first half of 2028 (Source: atNorth), and EdgeConneX said in February 2026 it plans to acquire a Skellefteå site that could become a campus of up to 1 GW (Source: EdgeConneX). Google broke ground in Horndal on 2 June 2026 on a site ready for off-site heat recovery (Source: Google). Immersion and Rear-Door Cooling grows 34.80% a year as these sites take racks above 100 kW.
Market Challenges: What Holds Back the Sweden AI Data Center Market?
Grid capacity is the main limit: about 5,500 MW of large data center capacity sat in Svenska kraftnät’s connection queue in mid-November 2025. That is roughly 100 times the 53 MW of AI-class capacity installed at the end of 2025, according to the Svenska kraftnät queue briefing of November 2025.
A 5,500 MW Queue Behind Mälardalen’s Transmission Limits
Svenska kraftnät reported a further 4,900 MW applied for in Mälardalen, Gävleborg, Uppsala and Stockholm, up 400 MW in a month (Source: Svenska kraftnät, November 2025). DC Market Insights therefore holds new Swedish IT completions at 190-211 MW a year after 2030, so the 24.11% a year growth comes from a rising AI share of a capped flow of megawatts, not from more megawatts.
The End of the Data Center Electricity Tax Cut
Sweden abolished the reduced energy tax for electricity used in data centers from 1 July 2023 (Source: Skatteverket), so AI halls now pay the standard rate, which Skatteverket lists at 36.0 öre per kWh for 2026, down from 43.9 öre in 2025. At a 1.2 power usage effectiveness (PUE), 36.0 öre per kWh adds about SEK 3.8 million a year per MW of IT load, roughly USD 0.38 million, or 5% of the USD 7.40 million build cost each year.
Market Opportunities: Where Is the Money in Swedish AI Data Centers?
The two largest openings in the Sweden AI Data Center Market are liquid-cooling retrofits and operations services, worth USD 23.29 million together in 2025. Retrofits run at 5 MW in 2025 and 7-8 MW a year to 2031, and the services share of value rises from 4.75% in 2025 to 18.07% by 2035.
Converting Stockholm’s Air-Cooled Halls for AI
CapMan Infra bought three data centers from EcoDataCenter in April 2025, two in Stockholm and one in Piteå (Source: CapMan), and buyers of older metro halls convert them in place: DC Market Insights models 5 MW of retrofits in 2025 rising to 8 MW a year from 2027 at USD 3.20 million per MW (2025 prices), worth USD 16.00 million in 2025.
Services for a 900 MW Installed AI Base
The installed AI base reaches about 907 MW by the end of 2034, and every megawatt needs maintenance, controls and liquid-loop services at USD 0.24 million a year (2025 prices), worth USD 240.50 million in 2035. Heat-recovery contracts, such as atNorth’s Kista SWE02 site with Stockholm Exergi due in the fourth quarter of 2027 (Source: atNorth), add service scope.
Pricing: How Much Does an AI Data Center Megawatt Cost in Sweden?
In the Sweden AI Data Center Market, an AI-class megawatt costs USD 7.40 million of facility infrastructure in 2025 (DC Market Insights estimate). That is 72% more than the USD 4.30 million of a conventional Swedish megawatt in the Sweden Data Center Infrastructure Market.
| Year | New AI hall, USD million per MW | Liquid-cooling retrofit, USD million per MW | Operations services, USD million per MW a year |
|---|---|---|---|
| 2020 | 7.04 | 3.04 | 0.23 |
| 2025 | 7.40 | 3.20 | 0.24 |
| 2030 | 7.78 | 3.36 | 0.25 |
| 2035 | 8.17 | 3.53 | 0.27 |
The USD 7.40 million splits into USD 2.85 million electrical, USD 2.55 million cooling, USD 1.60 million shell and racks and USD 0.40 million network fabric; Sweden’s free-cooling climate keeps cooling below the USD 4.40 million per MW of a Dutch AI hall. Public anchors bracket it: Brookfield’s SEK 95 billion for up to 750 MW is about USD 13.3 million per MW including part of the IT and power supply, and Mistral AI’s EUR 1.2 billion for Borlänge includes GPUs. Eurostat put Swedish industrial electricity at EUR 0.0845 per kWh before VAT in 2025 against an EU average of EUR 0.1618, which is the price advantage behind every Swedish AI campus.
Standards and Regulation: Which Rules Apply to AI Data Centers in Sweden?
Four rules shape the Sweden AI Data Center Market, and the 36.0 öre per kWh energy tax decides about 5% of the yearly cost of every AI megawatt.
- Energy tax on electricity: the data center reduction ended on 1 July 2023 and the standard rate is 36.0 öre per kWh in 2026 (Source: Skatteverket).
- Act (2025:570) on data center reporting: operators of sites with at least 500 kW of IT power must publish energy, water and waste-heat data each year, first by 15 May 2026 (Source: Swedish Energy Agency).
- Commission Delegated Regulation (EU) 2024/1364: the EU rating scheme behind that reporting (Source: European Commission).
- EuroHPC AI factory rules: Mimer must give access to start-ups, researchers and industry under EuroHPC terms, with EUR 29.76 million of joint funding (Source: EuroHPC Joint Undertaking).
Sweden’s AI Commission recommended in November 2024 that the state invest SEK 16.7 billion over ten years in AI (Source: AI Commission), which supports public and research demand worth USD 10.75 million in 2025.
Market Segmentation: Which Segment Carries the Value in the Sweden AI Data Center Market?
Liquid and High-Density Cooling carries the most value at USD 56.08 million in 2025, 36.53% of the market, because retrofits add to new-build cooling.
By Component
Operations Services and Software is the fastest component at 41.86% a year as the installed AI base compounds.
| Component | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Electrical Power Infrastructure | 54.96 | 35.80% | 418.21 | 22.50% |
| Liquid and High-Density Cooling | 56.08 | 36.53% | 383.34 | 21.19% |
| Building Shell and AI-Ready Racks | 28.16 | 18.34% | 231.21 | 23.43% |
| High-Speed Network Fabric | 7.04 | 4.59% | 57.80 | 23.43% |
| Operations Services and Software | 7.29 | 4.75% | 240.50 | 41.86% |
By Buyer Type
GPU Cloud and Sovereign AI Providers and Enterprise On-Premises grow fastest at 28.36% a year each, and Colocation and Wholesale follows at 26.39% as EcoDataCenter, atNorth and Brookfield sell AI halls to tenants.
| Buyer Type | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Hyperscale Self-Build | 73.69 | 48.00% | 532.42 | 21.87% |
| Colocation and Wholesale | 46.06 | 30.00% | 479.18 | 26.39% |
| GPU Cloud and Sovereign AI Providers | 15.35 | 10.00% | 186.35 | 28.36% |
| Research and Public AI Factories | 10.75 | 7.00% | 39.93 | 14.03% |
| Enterprise On-Premises | 7.68 | 5.00% | 93.17 | 28.36% |
By Cooling Approach
Immersion and Rear-Door Cooling grows 34.80% a year; Direct-to-Chip Liquid Cooling becomes the largest approach by 2035 at USD 878.50 million.
| Cooling Approach | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Air-Cooled High Density | 84.44 | 55.00% | 239.59 | 10.99% |
| Direct-to-Chip Liquid Cooling | 58.34 | 38.00% | 878.50 | 31.15% |
| Immersion and Rear-Door Cooling | 10.75 | 7.00% | 212.97 | 34.80% |
By Workload
AI Inference grows 29.04% a year against 18.97% for AI Training, and passes training around 2029.
| Workload | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| AI Training | 89.05 | 58.00% | 505.80 | 18.97% |
| AI Inference | 64.48 | 42.00% | 825.26 | 29.04% |
DC Exclusive: The Swedish AI Campus Pipeline Tracker, 9 Projects From Staffanstorp to Skellefteå
This tracker is a DC Market Insights model built on 12 inputs and 9 named projects. It shows that in the Sweden AI Data Center Market more than 2,650 MW of announced AI-capable campus capacity (750 + 600 + 300 + up to 1,000 MW, before Microsoft’s existing sites) waits behind a national flow of only 190-211 MW of new IT capacity a year after 2030.
| Project | Location | Status and date | What it adds | Source |
|---|---|---|---|---|
| Microsoft Gävle, Sandviken and Staffanstorp | Gävleborg and Skåne | Announced 3 June 2024 | SEK 33.7 billion over two years, more than 20,000 GPUs | Microsoft |
| Brookfield AI center | Strängnäs | Announced 4 June 2025; 10-15 year build | Up to SEK 95 billion, 300 MW rising to 750 MW | Brookfield |
| Sferical AI | Linköping | Launched 22 August 2025 | 2 DGX SuperPODs, 1,152 GB300-class GPUs | Wallenberg Investments |
| EcoDataCenter 2 (Kvarnsveden) | Borlänge | Ground broken September 2025; first hall early 2027 | 250 MW at launch, up to 600 MW | EcoDataCenter |
| Mistral AI and EcoDataCenter | Borlänge | Agreed 11 February 2026; opens 2027 | EUR 1.2 billion, NVIDIA Vera Rubin GPUs | EcoDataCenter |
| atNorth Hamre 1 | Sollefteå | Announced 23 February 2026; operating H1 2028 | 300 MW campus | atNorth |
| EdgeConneX Skellefteå | Skellefteå | Announced February 2026; subject to approvals | Campus of up to 1 GW | EdgeConneX |
| Mimer AI factory | Linköping | Contract 21 April 2026; installation 2026 | EUR 29.76 million, EU and Swedish Research Council | EuroHPC Joint Undertaking |
| Google Horndal | Avesta | Ground broken 2 June 2026 | Site ready for off-site heat recovery |
Read with the location model, the tracker explains why Sollefteå (64.43% a year from a near-zero base) and Strängnäs (48.46%) are the fastest locations while Kista and Stockholm City grows 18.88%: the announced megawatts sit far from Stockholm, where grid capacity is scarcest.
Regional Insights: Where in Sweden Are AI Data Centers Built?
North Middle Sweden leads with USD 49.13 million in 2025, 32% of the Sweden AI Data Center Market, and Upper and Central Norrland grows fastest at 34.59% a year.
| Region | 2025 (USD million) | Share 2025 | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|
| Stockholm Region | 46.06 | 30% | 252.90 | 18.57% |
| East Central Sweden | 27.64 | 18% | 319.45 | 27.73% |
| North Middle Sweden | 49.13 | 32% | 399.32 | 23.31% |
| Upper and Central Norrland | 12.28 | 8% | 239.59 | 34.59% |
| Southern and Western Sweden | 18.42 | 12% | 119.80 | 20.59% |
North Middle Sweden (Dalarna and Gävleborg)
Microsoft’s Gävle and Sandviken halls and EcoDataCenter’s Falun and Borlänge campuses hold this region at about 30% of value, USD 399.32 million by 2035.
Stockholm Region
Stockholm’s share falls from 30% to 19% by 2035 because Stockholm is one of the four areas where Svenska kraftnät counted a further 4,900 MW of connection applications, yet value still grows to USD 252.90 million through dense metro sites such as atNorth’s 30 MW Kista SWE02.
East Central Sweden
Brookfield’s Strängnäs plan and the Linköping AI clusters lift East Central Sweden from USD 27.64 million to USD 319.45 million, 27.73% a year.
Upper and Central Norrland
Luleå, Boden, Piteå, Skellefteå and Sollefteå grow from USD 12.28 million to USD 239.59 million because hydro power and grid room in the north host the 300 MW atNorth and up to 1 GW EdgeConneX campuses.
Southern and Western Sweden
Microsoft’s Staffanstorp site and Gothenburg enterprise demand keep this region at USD 119.80 million by 2035, 20.59% a year.
Location Analysis: Which Swedish Locations Lead in AI Data Centers?
In the Sweden AI Data Center Market, Kista and Stockholm City is the largest location with USD 30.71 million in 2025, and Strängnäs is the fastest large location at 48.46% a year.
| Rank | Location | Region | 2025 (USD million) | 2035 (USD million) | CAGR 2025-2035 |
|---|---|---|---|---|---|
| 1 | Kista and Stockholm City | Stockholm Region | 30.71 | 173.04 | 18.88% |
| 2 | Gävle and Sandviken | North Middle Sweden | 23.03 | 119.80 | 17.93% |
| 3 | Borlänge | North Middle Sweden | 15.35 | 186.35 | 28.36% |
| 4 | Staffanstorp | Southern and Western Sweden | 12.28 | 66.55 | 18.41% |
| 5 | Falun | North Middle Sweden | 9.21 | 53.24 | 19.18% |
| 6 | Linköping | East Central Sweden | 9.21 | 53.24 | 19.18% |
| 7 | Luleå and Boden | Upper and Central Norrland | 7.68 | 79.86 | 26.39% |
| 8 | Uppsala and Tierp | East Central Sweden | 4.61 | 66.55 | 30.61% |
| 9 | Skellefteå and Piteå | Upper and Central Norrland | 4.15 | 79.86 | 34.42% |
| 10 | Strängnäs | East Central Sweden | 3.07 | 159.73 | 48.46% |
| 11 | Avesta and Horndal | North Middle Sweden | 1.54 | 39.93 | 38.52% |
| 12 | Sollefteå | Upper and Central Norrland | 0.46 | 66.55 | 64.43% |
The twelve locations hold 79% of 2025 value and 86% of 2035 value; the rest sits in smaller enterprise and edge sites.
Forecast Scenarios: What Could the Sweden AI Data Center Market Reach by 2035?
The Sweden AI Data Center Market base case reaches USD 1.33 billion by 2035, with a range of USD 1.04 billion to USD 1.62 billion.
| Scenario | 2035 (USD million) | CAGR 2025-2035 | What it assumes |
|---|---|---|---|
| Low | 1,038.23 | 21.06% | Mälardalen grid reinforcement slips; Strängnäs stays near 300 MW; AI share 50% of new capacity by 2035 |
| Base | 1,331.06 | 24.11% | 190-211 MW of new IT a year after 2030, AI share 62% by 2035, Borlänge opens in 2027 |
| High | 1,623.89 | 26.60% | Brookfield reaches 750 MW and the EdgeConneX Skellefteå campus builds its first phases before 2032 |
Key Players and Market Share: Who Leads the Sweden AI Data Center Market?
The two largest buyers, Microsoft and EcoDataCenter, hold about 40% of 2025 spend (DC Market Insights estimate based on site MW), and suppliers are led by ABB, Schneider Electric and Vertiv.
- Microsoft
- EcoDataCenter
- Brookfield
- atNorth
- EdgeConneX
- Mistral AI
- Sferical AI
- CapMan Infra
- National Academic Infrastructure for Supercomputing in Sweden (NAISS)
- NVIDIA
- ABB
- Schneider Electric
- Vertiv
- Munters
- Eaton
Munters, the Swedish cooling supplier, reported fourth-quarter 2025 order intake up 191%, with Data Center Technologies orders up 416% (Source: Munters). Microsoft’s SEK 33.7 billion programme makes it the largest single buyer at about 24% of 2025 spend, and EcoDataCenter follows at about 16% (DC Market Insights estimates); Google adds a third hyperscale buyer once Horndal is built. Compared with 2025, the Mistral AI campus moves EcoDataCenter close to Microsoft by 2028 in the base case.
Recent Developments: What Changed in Swedish AI Data Centers in 2025-2026?
Six dated events since June 2025 shaped the Sweden AI Data Center Market, which DC Market Insights values at USD 298.44 million in 2026.
- In June 2025, Brookfield announced up to SEK 95 billion for an AI center in Strängnäs (Source: Brookfield).
- In August 2025, Sferical AI launched with 1,152 GPUs in Linköping (Source: Wallenberg Investments).
- In September 2025, EcoDataCenter broke ground on its 250 MW Borlänge campus (Source: EcoDataCenter).
- In February 2026, Mistral AI and EcoDataCenter agreed on a EUR 1.2 billion AI data center in Borlänge, and atNorth announced 300 MW in Sollefteå (Source: EcoDataCenter; atNorth).
- In April 2026, the EuroHPC Joint Undertaking signed the Mimer AI factory contract for Linköping (Source: EuroHPC Joint Undertaking).
- In June 2026, Google broke ground in Horndal and Svenska kraftnät published a 9-41 TWh data center demand range for 2050 (Source: Google; Svenska kraftnät).
Research Methodology: How the Model Sizes the Sweden AI Data Center Market
The model counts 16 annual cohorts of new Swedish IT capacity, 80 MW in 2025, times an AI share of 22%, times USD 7.40 million per AI megawatt, plus retrofits and services; it gives USD 153.53 million in 2025.
Capacity follows the Sweden Data Center Infrastructure Market (completions 80 MW in 2025 and 211 MW in 2035, installed base about 760 MW at the end of 2025), and the AI share rises from 2% in 2020 to 62% in 2035. Prices rise 1% a year. Services cost USD 0.24 million per prior-year installed AI megawatt, with 1.5% of the base retired each year. Three bound checks hold: (1) ceiling, the 2025 value is 30.6% of the USD 502.31 million Swedish infrastructure market, consistent with AI halls at 22% of new megawatts and a higher cost per megawatt; (2) ceiling, about 907 MW of installed AI capacity by the end of 2034 is 16% of the 5,500 MW large data center queue Svenska kraftnät reported in November 2025; (3) floor, the facility share of Mistral AI’s EUR 1.2 billion Borlänge build, about a quarter of it spread over 2026-2027, is about USD 170 million a year, below the 2026 hyperscale and colocation rows of USD 232.19 million. Peer markets are in the Sweden Data Center Colocation Market. Full method: research methodology.
Table of contents
- 01Introduction
- 1.1Market Definition and Scope
- 1.2Included and Excluded
- 1.3How the Segments Fit Together
- 02Executive Summary
- 2.1Market Snapshot, 2025, 2026 and 2035
- 2.2Key Market Statistics
- 2.3Key Takeaways
- 03Why Estimates Differ
- 3.1Scope Comparison Table
- 3.2In-Scope Buyer Groups
- 04Market Drivers
- 4.1Microsoft's 20,000-GPU Programme Fills Gävle, Sandviken and Staffanstorp
- 4.2Mistral AI's EUR 1.2 Billion Borlänge Campus Brings Vera Rubin Racks
- 4.3Brookfield's SEK 95 Billion Strängnäs Plan Moves AI Capacity Into Mälardalen
- 05Market Trends
- 5.1Sovereign GPU Clusters Arrive in Linköping
- 5.2Northern Mega-Sites Built for Liquid-Cooled Racks
- 06Market Challenges
- 6.1A 5,500 MW Queue Behind Mälardalen's Transmission Limits
- 6.2The End of the Data Center Electricity Tax Cut
- 07Market Opportunities
- 7.1Converting Stockholm's Air-Cooled Halls for AI
- 7.2Services for a 900 MW Installed AI Base
- 08Pricing Analysis
- 8.1Cost per AI Megawatt, 2020-2035
- 8.2Public Price Anchors
- 09Standards and Regulation
- 9.1Energy Tax on Electricity (36.0 öre per kWh)
- 9.2Act (2025:570) on Data Center Reporting
- 9.3Delegated Regulation (EU) 2024/1364
- 9.4EuroHPC AI Factory Rules
- 10Market Segmentation
- 10.1By Component: Electrical Power Infrastructure
- 10.2By Component: Liquid and High-Density Cooling
- 10.3By Component: Building Shell and AI-Ready Racks
- 10.4By Component: High-Speed Network Fabric
- 10.5By Component: Operations Services and Software
- 10.6By Buyer Type: Hyperscale Self-Build
- 10.7By Buyer Type: Colocation and Wholesale
- 10.8By Buyer Type: GPU Cloud and Sovereign AI Providers
- 10.9By Buyer Type: Research and Public AI Factories
- 10.10By Buyer Type: Enterprise On-Premises
- 10.11By Cooling Approach: Air-Cooled High Density
- 10.12By Cooling Approach: Direct-to-Chip Liquid Cooling
- 10.13By Cooling Approach: Immersion and Rear-Door Cooling
- 10.14By Workload: AI Training
- 10.15By Workload: AI Inference
- 11DC Exclusive: Swedish AI Campus Pipeline Tracker
- 11.1Microsoft Gävle, Sandviken and Staffanstorp
- 11.2Brookfield AI center
- 11.3Sferical AI
- 11.4EcoDataCenter 2 (Kvarnsveden)
- 11.5Mistral AI and EcoDataCenter
- 11.6atNorth Hamre 1
- 11.7EdgeConneX Skellefteå
- 11.8Mimer AI factory
- 11.9Google Horndal
- 12Regional Insights
- 12.1Stockholm Region
- 12.2East Central Sweden
- 12.3North Middle Sweden
- 12.4Upper and Central Norrland
- 12.5Southern and Western Sweden
- 13Location Analysis
- 13.1Kista and Stockholm City
- 13.2Gävle and Sandviken
- 13.3Borlänge
- 13.4Staffanstorp
- 13.5Falun
- 13.6Linköping
- 13.7Luleå and Boden
- 13.8Uppsala and Tierp
- 13.9Skellefteå and Piteå
- 13.10Strängnäs
- 13.11Avesta and Horndal
- 13.12Sollefteå
- 14Forecast Scenarios
- 14.1Low Scenario
- 14.2Base Scenario
- 14.3High Scenario
- 15Key Players and Market Share
- 15.1Microsoft
- 15.2EcoDataCenter
- 15.3Google
- 15.4Brookfield
- 15.5atNorth
- 15.6EdgeConneX
- 15.7Mistral AI
- 15.8Sferical AI
- 15.9CapMan Infra
- 15.10NAISS
- 15.11NVIDIA
- 15.12ABB
- 15.13Schneider Electric
- 15.14Vertiv
- 15.15Munters
- 15.16Eaton
- 16Recent Developments
- 16.12025 Developments
- 16.22026 Developments
- 17Research Methodology
- 17.1Model Inputs and Receipt
- 17.2Bound Checks
- Fig. 1Sweden AI Data Center Market Size, 2020-2035
- Table 1Market Snapshot, 2025, 2026 and 2035
- Table 2Scope Comparison
- Table 3Cost per AI Megawatt, 2020-2035
- Table 4Sweden AI Data Center Market by Component
- Table 5Sweden AI Data Center Market by Buyer Type
- Table 6Sweden AI Data Center Market by Cooling Approach
- Table 7Sweden AI Data Center Market by Workload
- Table 8Swedish AI Campus Pipeline Tracker
- Table 9Sweden AI Data Center Market by Region
- Table 10Top 12 Locations
- Table 11Forecast Scenarios, 2035
About this report
Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.
Read our methodologyHow we built this
- Historical period2020-2024
- Base year2025
- Forecast period2026-2035
- Sizing approachTop-down + bottom-up
Need more than the report?
Advisory on this market
Due diligence, site selection and market entry work, by the analysts who wrote this report.
See consulting servicesFrequently asked questions
USD 298.44 million in 2026, up 94.39% from USD 153.53 million in 2025, according to DC Market Insights estimates. The market is projected to reach USD 1.33 billion by 2035, a CAGR of 24.11% from 2025.
24.11% a year from 2025 to 2035, after 86.69% a year from 2020 to 2025. The AI share of new Swedish IT capacity rises from 22% in 2025 to 62% in 2035 (DC Market Insights estimate).
USD 7.40 million of facility infrastructure per AI megawatt in 2025 (DC Market Insights estimate): USD 2.85 million electrical, USD 2.55 million cooling, USD 1.60 million shell and racks and USD 0.40 million network fabric.
Liquid and High-Density Cooling, with USD 56.08 million or 36.53% of 2025 value. Operations Services and Software grows fastest at 41.86% a year.
North Middle Sweden, with USD 49.13 million or 32% of 2025 value, home to Microsoft’s Gävle and Sandviken halls and EcoDataCenter’s Borlänge campus. Upper and Central Norrland grows fastest at 34.59% a year.
Brookfield’s up to SEK 95 billion Strängnäs AI center (300 to 750 MW), the EUR 1.2 billion Mistral AI and EcoDataCenter campus in Borlänge opening 2027, atNorth’s 300 MW Sollefteå site and EdgeConneX’s planned campus of up to 1 GW in Skellefteå.
About 5,500 MW of large data center capacity sat in Svenska kraftnät’s connection queue in mid-November 2025, with a further 4,900 MW applied for in Mälardalen, Gävleborg, Uppsala and Stockholm.
36.0 öre per kWh in 2026, the standard energy tax rate, after the data center reduction ended on 1 July 2023 (Source: Skatteverket). At a 1.2 PUE that is about SEK 3.8 million a year per MW of IT load.
Microsoft holds about 24% of 2025 spend and EcoDataCenter about 16% (DC Market Insights estimates). Google, Brookfield, atNorth, EdgeConneX, Mistral AI and Sferical AI are buyers; ABB, Schneider Electric, Vertiv and Munters lead supply.
DC Market Insights’ USD 298.44 million for 2026 counts only the facility layer of AI-class halls. Estimates that add GPU servers, cloud revenue or conventional halls give several times that figure.
Get this report
How do I get the full report?
Request a quote; we reply by email within one business day.
How and when will I receive the report?
By email, within 24-48 business hours of payment.
How can I pay?
Once you accept the quote, we email you a secure payment link.
Can I see a sample first?
Yes. Request a free sample and we will email it to you.
Can the report be tailored to my needs?
Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.
Can I get an invoice or pay against a purchase order?
Write to sales@dcmarketinsights.com and our team will help.