Data Center IT Asset Disposition (ITAD) Market Size, Share & Forecast to 2035
Market at a glance
The Data Center IT Asset Disposition (ITAD) market was worth USD 1,990.0 million in 2025 and is forecast to reach USD 5,950.0 million by 2035, growing at a 11.55% CAGR.
Key findings
Hyperscaler Insourcing Keeps Nearly Half the Value In House
What is inside the report
- 01Introduction and Key Market Statistics
- 02Executive Summary
- 03Market Scope
- 04Market Drivers
- 05Market Restraints
- 06Market Trends
- 07Market Opportunities
- 08Pricing
- 09Standards and Regulation
- 10Market Segmentation
- 17chapters
- 2020-2024Historical period
- 2026-2035Forecast period
- —Companies profiled
Segmentation
Full analysis
The Data Center IT Asset Disposition (ITAD) Market is valued at USD 2.29 billion in 2026 and is projected to reach USD 5.95 billion by 2035, up from USD 1.99 billion in 2025, a CAGR of 11.55% from 2025 to 2035 (DC Market Insights estimate). What moves the money in data centre ITAD is the resale value locked inside retired hardware: Sims Lifecycle Services, the largest listed specialist, reported fiscal 2026 revenue of A$757.0 million, up 77.4%, “due to higher resale revenue”, while its repurposed units rose 90.9% to 16.8 million (Source: Sims Limited ASX results, August 2026). The second lever is accounting: Amazon cut the useful life of a subset of its servers from six to five years from January 2025 (Source: Amazon 10-Q), while Meta lengthened most servers to 5.5 years, so the timing of retirements, not data growth, decides each year’s volume. DC Market Insights counts 16,987 MW of IT hardware retired in 2025, of which third-party ITAD providers handled about 54% by value, at USD 190,000 per conventional MW and USD 1.05 million per AI MW, giving USD 1.99 billion of service fees and resale proceeds. AI and GPU servers are the fastest asset type at 26.68% a year, and the Middle East and Africa is the fastest region at 17.40%, because the Gulf halls built from 2021 reach their first refresh after 2027.
How Big Is Data Centre ITAD in 2026, and What Are the Headline Numbers?
DC Market Insights values the Data Center IT Asset Disposition (ITAD) Market at USD 2.29 billion in 2026, 14.9% above the USD 1.99 billion of 2025.
- Market size 2025: USD 1.99 billion
- Market size 2026: USD 2.29 billion
- Market size 2030: USD 3.69 billion
- Market size 2035: USD 5.95 billion
- CAGR 2025-2035: 11.55% (low case USD 4.04 billion and high case USD 7.12 billion in 2035)
- Largest service: Component Harvesting and Resale, USD 941.62 million in 2025 (47.2%)
- Fastest asset type: AI and GPU Servers, 26.68% a year to USD 3.00 billion by 2035
- Leading region: North America, 45.0% of 2025 value; fastest region: Middle East and Africa, 17.40% a year
- Largest country: United States, USD 807.79 million in 2025
- Market leader: Sims Lifecycle Services, about 18% of 2026 value (DC Market Insights assessment)
Key Takeaways: What Should Buyers of Data Centre ITAD Know?
Four findings drive the DC Market Insights view of the Data Center IT Asset Disposition (ITAD) Market, each with its figure and its reason.
- Resale is 85.8% of the market in 2025 (USD 1.71 billion of USD 1.99 billion), because a retired server is worth more as harvested memory, drives and processors than the fee for wiping it.
- AI and GPU servers rise from 14.1% of value in 2025 to 50.5% in 2035, because the 4.2 GW of AI capacity added in 2025 retires around 2030 at five-year lives.
- Hyperscalers keep roughly 45% of conventional retirement value in house, because programmes such as Microsoft’s Circular Centers already reach a 90.9% reuse and recycling rate.
- Sanitization fees grow 12.0% a year to USD 350.98 million by 2035, because NIST SP 800-88 Revision 2 (Source: NIST, September 2025) moves buyers to verified purge and audit trails.
Executive Summary: How Fast Has Data Center ITAD Spending Grown Since 2020?
The Global Data Center IT Asset Disposition (ITAD) Market size was valued at USD 1.11 billion in 2020, reached USD 1.99 billion in 2025, and is anticipated to reach USD 5.95 billion by 2035, at a CAGR of 11.55% during the forecast period.
| Attribute | Value |
|---|---|
| Historical period | 2020-2024 |
| Base year | 2025 |
| Forecast period | 2026-2035 |
| Market size 2025 | USD 1.99 billion |
| Market size 2026 | USD 2.29 billion |
| CAGR 2025-2035 | 11.55% |
| Market size 2035 | USD 5.95 billion |
Growth from 2020 to 2025 ran at 12.47% a year as the installed IT base rose from 80 GW to 116 GW and retirements of conventional hardware climbed from 11,967 MW to 16,387 MW. From 2026 the second engine starts: AI capacity added from 2021 onward reaches the end of its accounting life, and AI retirements rise from 600 MW in 2025 to 4,200 MW in 2030 and 13,200 MW in 2035. A retired AI megawatt carries more than five times the recoverable value of a conventional one, so AI hardware lifts the market even though conventional retirements still make up 68% of retired megawatts in 2035.

What Does Data Center IT Asset Disposition (ITAD) Cover?
Data Center IT Asset Disposition (ITAD) covers the third-party services and value recovery applied to IT hardware leaving a data center, worth USD 1.99 billion in 2025.
Included
The market includes data sanitization and physical destruction of drives and memory (on site or in a secure facility), certificates of sanitization, de-installation, packing and reverse logistics of servers, storage arrays and network switches, auditing and asset tagging, remarketing of whole systems, harvesting and resale of components such as DIMMs, SSDs, hard drives, processors, GPUs and network optics, and recycling of what cannot be reused into metals and plastics. Revenue is counted as the provider’s service fees plus its resale proceeds.
Excluded
Laptops, desktops, phones and other end-user devices are outside scope, as are the value hyperscalers recover with their own teams, OEM sales of new or certified refurbished servers, and the removal of power, cooling and building plant, which is sized in the Data Center Decommissioning Service Market report. The total data center spend that produces the hardware is covered by the Data Center Market report; the ITAD market starts where that hardware is retired.
How the Segments Fit Together
Every retired megawatt passes through three choices: who handles it (in house or third party), what it is (general-purpose, AI, storage or network hardware) and how value is taken out (whole-system resale, component harvesting, or recycling after sanitization). The three segment dimensions below follow those choices and each sums to the market total in every year.
Why Do Published Data Center ITAD Market Sizes Differ So Much?
DC Market Insights puts the market at USD 2.29 billion in 2026, while wider definitions reach above USD 14 billion because they add end-user devices and in-house recovery.
The previous DC Market Insights edition gave a figure more than seven times higher because it counted computers, laptops and mobile devices alongside servers. Broader definitions also add the value hyperscalers recover inside their own circular programmes, which DC Market Insights estimates at 87.5% of the outsourced data center ITAD market’s value in 2025, four-fifths of it conventional hardware, and some add enterprise end-user device refresh, OEM certified refurbished sales and commodity scrap value sold by recyclers. This edition keeps only the third-party market that a data center operator can buy, which is why its figure is smaller and why small and medium-sized enterprise data centers and government sites, which outsource almost all disposal, carry 30.8% of value.
| Element | In this report | Why |
|---|---|---|
| Outsourced ITAD of data center servers, storage and network gear | Yes, USD 1,994.56 million (2025) | The service a data center buys |
| Hyperscaler in-house recovery | No, about USD 1,745.94 million (2025) | Not sold on the open market |
| Laptops, desktops and mobile devices | No | Not data center hardware |
| Power, cooling and building plant removal | No | Sized in the decommissioning service report |
| OEM certified refurbished server sales | No | Product sales by manufacturers |
What Drives Data Center ITAD Demand in 2026?
Three forces add USD 297.21 million of data center ITAD value in 2026 alone, lifting the market from USD 1.99 billion to USD 2.29 billion.
Shorter Server Lives at Amazon Web Services Bring Retirements Forward
Amazon changed the estimated useful life of a subset of its servers and networking equipment from six to five years effective 1 January 2025, adding USD 217 million of depreciation in the first quarter of 2025, according to its quarterly filing with the US Securities and Exchange Commission. A one-year cut in life raises the annual retirement rate of that fleet by 20%. Meta moved the other way, raising most server lives to 5.5 years from January 2025 (Source: Meta 10-Q), so DC Market Insights uses six years for conventional hardware and five years for AI hardware, which retires 16,387 MW of conventional and 600 MW of AI capacity in 2025.
Memory and Storage Prices Lift Resale Value per Retired Megawatt
Sims Lifecycle Services reported fiscal 2026 revenue of A$757.0 million, up 77.4%, with underlying earnings before interest and tax of A$172.7 million against A$32.6 million a year earlier, and attributed the revenue rise to higher resale revenue (Source: Sims Limited, August 2026). DC Market Insights raises resale value per retired conventional megawatt from USD 120,000 in 2020 to USD 160,000 in 2025, because a harvested 64 GB server memory module and an enterprise SSD fetch more when new-part supply is tight, which makes component harvesting the largest service at USD 941.62 million.
The First AI Hardware Cohorts Reach Retirement
AI capacity added in 2020 was about 0.6 GW and AI capacity added in 2025 about 4.2 GW, according to the DC Market Insights capacity model. At five-year lives these cohorts retire in 2025 and 2030, lifting AI retirements sevenfold and AI and GPU server ITAD value from USD 282.15 million in 2025 to USD 1.37 billion in 2030. GPU baseboards, high-bandwidth memory modules and 400G and 800G optics are the parts that drive this value.
Market Restraints: What Holds Back Data Centre ITAD Providers?
Insourcing and price risk hold data center ITAD providers about USD 1.75 billion below the total recoverable value of retired data center hardware in 2025.
Hyperscaler Insourcing Keeps Nearly Half the Value In House
Microsoft reached a 90.9% reuse and recycling rate for servers and components in 2024 through its Circular Centers, a year ahead of its 90% target for 2025. Google harvested about 8.8 million components from decommissioned hardware in 2024, including more than 3 million hard drives wiped and reused or resold (Source: Google sustainability report). DC Market Insights sets the outsourced share of conventional retirement value at 55% in 2025, falling to 50% by 2035, so every point of further insourcing removes about USD 37 million of third-party revenue at 2025 volumes.
Component Prices Can Fall as Fast as They Rose
Resale is 85.8% of the market, so a 25% drop in AI resale values and a 10% drop in conventional resale values from 2027 would cut the 2035 market to USD 4.04 billion in the low scenario, 32% below the base case. GPU generations now arrive every 12 to 24 months, which shortens the window in which a retired accelerator still has a buyer.
Which Trends Are Changing Data Center ITAD?
Two data center ITAD trends move USD 507.32 million of 2035 resale value from whole systems to harvested components and raise service fees for AI racks by 50% over conventional ones.
Harvesting Parts Instead of Reselling Whole Servers
Component harvesting rises from 55% of resale value in 2025 to 65% in 2035 in the DC Market Insights model, because hyperscale buyers want drives, memory and optics that fit their own spare pools rather than whole branded servers. Amazon Web Services reports that 23.5 million components have been recycled or sold on the secondary market since 2023 through its re:Cycle Reverse Logistics hubs, and that 13% of its spare parts come from its own reuse inventory (Source: Amazon, December 2024). Third-party providers follow the same model: Sims grew processed repurposed units 90.9% to 16.8 million in fiscal 2026.
Liquid-Cooled AI Racks Need New Decommissioning Skills
AI racks carry cold plates, manifolds and coolant that must be drained before transport, and a rack can weigh more than 1.3 tonnes, so DC Market Insights prices the service fee for a retired AI megawatt at USD 45,000 in 2025 against USD 30,000 for conventional hardware, rising to USD 55,000 by 2035. Providers with drained-loop handling and heavy-rack logistics win this work.
Where Are the Opportunities in Data Center ITAD?
The two largest data center ITAD openings are worth USD 3.00 billion and USD 1.34 billion of annual revenue by 2035.
AI and GPU Server Recovery for Neoclouds and Colocation Tenants
AI and GPU server ITAD reaches USD 3.00 billion by 2035, half of the market, and colocation tenants account for 20% of AI hardware value because GPU cloud providers lease space rather than build it. These tenants rarely run their own recovery programmes, so they outsource at higher rates than hyperscalers.
Colocation Operators as a Single Channel to Many Tenants
Colocation clients grow from USD 484.53 million in 2025 to USD 1.34 billion in 2035, at 10.69% a year. Providers that sign framework agreements with the operator, then offer on-site wiping and pick-up to each tenant, reach many small accounts through one contract.
How Much Does Data Centre ITAD Cost per Server and per MW?
In data centre ITAD, a retired conventional megawatt carried USD 30,000 of service fees and USD 160,000 of resale value in 2025, or about USD 60 and USD 320 per server at 2 kW per server.
| Value per retired MW (USD) | 2020 | 2025 | 2030 | 2035 |
|---|---|---|---|---|
| Conventional: service fee | 25,000 | 30,000 | 34,000 | 37,000 |
| Conventional: resale value | 120,000 | 160,000 | 170,000 | 175,000 |
| AI hardware: service fee | 40,000 | 45,000 | 50,000 | 55,000 |
| AI hardware: resale value | 800,000 | 1,000,000 | 600,000 | 400,000 |
These are DC Market Insights unit values; no provider publishes a price list. The service fee covers on-site drive shredding or purge, chain-of-custody logistics, audit and certificates. Resale value for AI hardware peaks in 2025 because 2020-vintage accelerators still find buyers for inference, then falls to USD 400,000 per MW by 2035 as faster GPU generations shorten secondary demand. In many contracts the provider pays the client a share of resale proceeds, so a client’s net cost can be negative.
Colocation Operators: Equinix, Nxera and Tenant ITAD Pricing and Onboarding
Colocation operators such as Equinix and Nxera do not publish data center ITAD price lists or onboarding times, so tenants comparing them should compare the ITAD provider each site allows, not the operator. In practice a tenant contracts the ITAD provider directly, and onboarding time depends on site security approval for the provider’s staff and shred trucks; DC Market Insights applies the same USD 30,000 service fee and USD 160,000 resale value per conventional megawatt to colocation tenants, which make up USD 484.53 million of 2025 value.
Which Rules and Standards Govern Data Center ITAD?
Four rule sets shape how the USD 113.01 million data center ITAD sanitization segment of 2025 is delivered.
- NIST SP 800-88 Revision 2. The US National Institute of Standards and Technology published the final revision of its Guidelines for Media Sanitization on 26 September 2025, replacing the 2014 revision; it defines sanitization as rendering access to target data infeasible for a given level of effort.
- IEEE 2883-2022. According to the IEEE Standards Association, the Institute of Electrical and Electronics Engineers standard for sanitizing storage, published on 17 August 2022, sets clear, purge and destruct methods for logical and physical storage.
- EU Ecodesign Regulation (EU) 2019/424. The regulation for servers and data storage products requires a secure data deletion function from 1 March 2020, disassembly of storage, memory, processors and power supplies from the same date, and firmware availability from 1 March 2021, which makes reuse of EU-sold servers easier.
- EU WEEE and raw materials rules. The Waste Electrical and Electronic Equipment Directive 2012/19/EU governs recycling of what cannot be reused, and the Critical Raw Materials Act, Regulation (EU) 2024/1252, sets a benchmark of 25% of annual EU consumption of strategic raw materials from recycling by 2030.
Provider certifications such as R2v3 from Sustainable Electronics Recycling International and e-Stewards are standard tender requirements for hyperscale and government clients, and the General Data Protection Regulation (GDPR) makes the data controller liable for data left on retired drives.
Which Service, Asset Type and Client Carry the Most ITAD Value?
Component Harvesting and Resale leads with USD 941.62 million in 2025, General-Purpose Servers lead asset types with 53.2%, and Hyperscale and Cloud clients lead with 45.0%.
By Service Type: Component Harvesting Leads with 47.2%
| Service type | 2025 (USD m) | Share 2025 | 2035 (USD m) | CAGR 2025-2035 |
|---|---|---|---|---|
| Component Harvesting and Resale | 941.62 | 47.2% | 3,297.56 | 13.35% |
| Remarketing of Whole Systems | 770.41 | 38.6% | 1,775.61 | 8.71% |
| Data Sanitization and Destruction | 113.01 | 5.7% | 350.98 | 12.00% |
| Logistics and De-installation | 98.89 | 5.0% | 307.10 | 12.00% |
| Recycling and Materials Recovery | 70.63 | 3.5% | 219.36 | 12.00% |
Component harvesting is also the fastest service at 13.35% a year because AI boards are broken down into GPUs, memory and optics rather than resold whole.
By Asset Type: AI and GPU Servers Grow Fastest at 26.68%
| Asset type | 2025 (USD m) | Share 2025 | 2035 (USD m) | CAGR 2025-2035 |
|---|---|---|---|---|
| General-Purpose Servers | 1,061.70 | 53.2% | 1,827.52 | 5.58% |
| Storage Drives and Arrays | 428.10 | 21.5% | 736.90 | 5.58% |
| AI and GPU Servers | 282.15 | 14.1% | 3,003.00 | 26.68% |
| Networking Equipment | 222.61 | 11.2% | 383.19 | 5.58% |
By Client Type: Hyperscale and Cloud Leads with 45.0%
| Client type | 2025 (USD m) | Share 2025 | 2035 (USD m) | CAGR 2025-2035 |
|---|---|---|---|---|
| Hyperscale and Cloud | 896.58 | 45.0% | 3,578.68 | 14.85% |
| Enterprise and Government | 613.45 | 30.8% | 1,034.43 | 5.36% |
| Colocation | 484.53 | 24.3% | 1,337.50 | 10.69% |
DC Exclusive: The Hyperscaler In-House Recovery Tracker — How Much ITAD Do Cloud Giants Keep for Themselves?
DC Market Insights estimates that hyperscale in-house programmes kept data center ITAD recovery value of about USD 1.75 billion away from third-party providers in 2025, a modelled estimate built from 10 inputs.
| Programme | Disclosed figure | Date and source | What it means for outsourced ITAD |
|---|---|---|---|
| Microsoft Circular Centers | 90.9% reuse and recycling of servers and components | 2024, Microsoft | Most Microsoft hardware stays in house; third parties get recycling residue |
| Google component harvesting | About 8.8 million components, over 3 million drives reused or resold | 2024, Google | Drives wiped in house; outsourced share low |
| AWS re:Cycle Reverse Logistics | 23.5 million components recycled or sold since 2023; 13% of spares from reuse | December 2024, Amazon | Secondary sales partly via brokers and ITAD partners |
| Amazon server life | Subset cut from 6 to 5 years | January 2025, Amazon 10-Q | More units retired per year |
| Meta server life | Most servers raised to 5.5 years | January 2025, Meta 10-Q | Fewer units retired per year |
The model splits retirement value between in-house and third-party channels by client and hardware type:
| Client type (2025, USD m) | Conventional hardware | AI hardware | Total |
|---|---|---|---|
| Hyperscale and Cloud | 684.96 | 211.62 | 896.58 |
| Colocation | 428.10 | 56.43 | 484.53 |
| Enterprise and Government | 599.34 | 14.11 | 613.45 |
The inputs are retired megawatts by hardware type, the outsourced shares (55% conventional and 45% AI in 2025), service and resale values per megawatt, and client splits. The outsourced AI share rises to 50% by 2035 because GPU cloud and colocation tenants, not hyperscalers, own a growing part of the AI fleet.
Which Regions Lead Data Center ITAD, and Which Grow Fastest?
North America leads data center ITAD with USD 897.55 million (45.0%) in 2025, and the Middle East and Africa grows fastest at 17.40% a year to USD 297.53 million by 2035.
| Region | 2025 (USD m) | Share 2025 | 2035 (USD m) | CAGR 2025-2035 |
|---|---|---|---|---|
| North America | 897.55 | 45.0% | 2,439.75 | 10.52% |
| Asia Pacific | 498.64 | 25.0% | 1,725.68 | 13.22% |
| Europe | 478.69 | 24.0% | 1,249.63 | 10.07% |
| Latin America | 59.84 | 3.0% | 238.02 | 14.81% |
| Middle East and Africa | 59.84 | 3.0% | 297.53 | 17.40% |
North America: Hyperscale Retirements and the Sims Resale Model
North America holds the largest retired fleet and most AI capacity, and the United States alone accounts for USD 807.79 million in 2025. Resale-led providers grew fastest here, and Iron Mountain said its data center, digital and asset lifecycle management businesses together grew more than 50% in the second quarter of 2026 (Source: Iron Mountain, August 2026).
Europe: Ecodesign Rules Make Servers Easier to Reuse
Europe carries USD 478.69 million in 2025. Regulation (EU) 2019/424 requires secure data deletion and disassembly for servers sold in the EU, which raises the share of retired European hardware that can be resold rather than shredded; Germany (USD 95.74 million) and the United Kingdom (USD 86.16 million) are the largest markets.
Asia Pacific: China and India Add Volume
Asia Pacific grows at 13.22% to USD 1.73 billion by 2035, led by China (USD 179.51 million in 2025) and India, the fastest large country at 18.85% a year, because India’s capacity built from 2020 to 2025 enters its first refresh cycle in 2026 to 2031.
Middle East and Africa: First Refresh of Gulf AI Halls
The Middle East and Africa is the fastest region at 17.40% a year, because AI and cloud halls commissioned in Saudi Arabia and the United Arab Emirates from 2021 onward reach five-year retirement from 2026, and local ITAD capacity is thin, so providers that open certified facilities in the Gulf capture this growth.
Which Countries Buy the Most Data Center ITAD Services?
The United States leads data center ITAD with USD 807.79 million in 2025, 40.5% of the global market, and India grows fastest among the top 12 at 18.85% a year.
| Rank | Country | Region | 2025 (USD m) | 2035 (USD m) | CAGR 2025-2035 |
|---|---|---|---|---|---|
| 1 | United States | North America | 807.79 | 2,171.38 | 10.39% |
| 2 | China | Asia Pacific | 179.51 | 586.73 | 12.57% |
| 3 | Germany | Europe | 95.74 | 237.43 | 9.51% |
| 4 | Canada | North America | 89.75 | 268.37 | 11.58% |
| 5 | United Kingdom | Europe | 86.16 | 212.44 | 9.44% |
| 6 | Japan | Asia Pacific | 84.77 | 224.34 | 10.22% |
| 7 | Netherlands | Europe | 52.66 | 137.46 | 10.07% |
| 8 | France | Europe | 47.87 | 124.96 | 10.07% |
| 9 | Australia | Asia Pacific | 44.88 | 155.31 | 13.22% |
| 10 | India | Asia Pacific | 39.89 | 224.34 | 18.85% |
| 11 | Ireland | Europe | 38.30 | 112.47 | 11.37% |
| 12 | Singapore | Asia Pacific | 34.90 | 103.54 | 11.49% |
Outside the top 12, DC Market Insights allocates 2025 data center ITAD value inside the regional totals as follows: South Korea USD 34.90 million and Taiwan USD 19.95 million in Asia Pacific; Italy USD 23.93 million, Spain USD 19.15 million, Sweden USD 14.36 million, Turkey USD 14.36 million, Switzerland USD 11.97 million, Denmark USD 9.57 million and Russia USD 9.57 million in the rest of Europe; Brazil USD 26.93 million, Mexico USD 14.96 million, Chile USD 5.98 million, Colombia USD 4.19 million, Argentina USD 2.99 million and Peru USD 1.80 million in Latin America; and Egypt USD 3.59 million in the rest of the Middle East and Africa. Brazil and Mexico together hold 70% of Latin American value because most of the region’s hyperscale capacity sits around São Paulo and Querétaro.
India moves from 10th to joint 5th place by 2035, level with Japan at USD 224.34 million, because its retirements follow a capacity base that grew several times over between 2020 and 2026.
How Could the 2035 Data Center ITAD Forecast Change?
The 2035 data center ITAD market ranges from USD 4.04 billion in the low case to USD 7.12 billion in the high case, around the USD 5.95 billion base.
| Scenario | Assumptions from 2027 | 2030 (USD bn) | 2035 (USD bn) |
|---|---|---|---|
| Low | Outsourced share 10 points lower, AI resale value 25% lower, conventional resale 10% lower | 2.56 | 4.04 |
| Base | Outsourced 52-50% conventional and 50% AI; values as in the pricing table | 3.69 | 5.95 |
| High | Outsourced share 5 points higher, AI resale value 15% higher, conventional resale 5% higher | 4.36 | 7.12 |
The spread is wide because resale prices, not volumes, carry most of the risk: retired megawatts are set by hardware already installed, while the price a harvested GPU fetches in 2032 depends on generations not yet launched.
Who Leads the Data Centre ITAD Supplier Field?
Sims Lifecycle Services leads data center ITAD with about 18% of 2026 value, and the top five providers hold about 52% (DC Market Insights assessment based on reported revenue and data center exposure).
- Sims Lifecycle Services (Sims Limited)
- Iron Mountain (including ITRenew)
- TES (SK ecoplant)
- Arrow Electronics (Arrow ITAD)
- Apto Solutions
- ERI
- Park Place Technologies
- Procurri
- Wisetek
- Exit Technologies
- Dataknox
- DataSpan
- Hewlett Packard Enterprise Financial Services (HPEFS)
- Dell Technologies (asset recovery services)
- Cisco Refresh
- IBM (asset recovery and refurbished systems)
Sims Lifecycle Services reported fiscal 2026 revenue of A$757.0 million (about USD 0.49 billion) and describes itself as a supply chain partner for data center infrastructure services (Source: Sims Limited, ASX results filing, August 2026). Iron Mountain bought ITRenew, a data center decommissioning and component resale specialist, at a minimum enterprise value of USD 925 million (Source: Iron Mountain, January 2022); its Corporate and Other revenue, which holds asset lifecycle management, rose 46.6% to USD 806.8 million in 2025 (Source: Iron Mountain 10-K exhibit). OEM programmes from HPE, Dell, IBM and Cisco mainly take back their own hardware, while independents compete on resale yield and certified sanitization. Sims Lifecycle Services traded as Sims Recycling Solutions until its shift from scrap recycling to reuse.
Business Models, Customer Behavior and Strategic Implications
Three business models compete for the USD 2.29 billion of 2026 data center ITAD value: revenue-share resale, where the provider returns a share of resale proceeds to the client; fixed fees per asset for sanitization and logistics; and hardware lifespan extension, where harvested parts return to the client’s own spare pool. Customer behavior is shifting toward the third model, as the AWS figure of 13% of spares from reuse shows, and the strategic implication for independents is that hyperscale volume will reward component testing and grading capacity more than shredding capacity (DC Market Insights assessment).
What Changed Recently in Data Center ITAD?
Six dated events since December 2024 changed data center ITAD volumes, prices and rules in a market worth USD 2.29 billion in 2026.
- In August 2026, Sims Limited reported Sims Lifecycle Services revenue of A$757.0 million, up 77.4%, and 16.8 million repurposed units (Source: Sims Limited).
- In August 2026, Iron Mountain reported second-quarter revenue of USD 2.0 billion and said its data center, digital and asset lifecycle management businesses grew more than 50% (Source: Iron Mountain).
- In September 2025, NIST published SP 800-88 Revision 2, Guidelines for Media Sanitization (Source: NIST).
- In April 2025, Microsoft said its Circular Centers reached a 90.9% reuse and recycling rate for servers and components in 2024 (Source: Microsoft).
- In January 2025, Amazon shortened the useful life of a subset of servers and networking equipment to five years, while Meta lengthened most server lives to 5.5 years (Source: Amazon and Meta quarterly filings).
- In December 2024, Amazon Web Services said 23.5 million components had been recycled or sold on the secondary market since 2023 (Source: Amazon).
Methodology: How Did DC Market Insights Build the ITAD Model?
The data center ITAD model multiplies 16,987 retired megawatts in 2025 by outsourced shares and by USD 190,000 to USD 1.05 million of recoverable value per megawatt to reach USD 1.99 billion.
Retired conventional hardware equals the prior year’s installed conventional IT base divided by a six-year life (98.3 GW in 2024 gives 16,387 MW in 2025); retired AI hardware equals AI capacity added five years earlier (600 MW in 2025). Installed IT capacity follows the DC Market Insights anchors of 80 GW in 2020, 116 GW in 2025 and 311 GW in 2035, with AI capacity of 12.35 GW in 2025. The receipt for 2025 is 16,387 MW × 55% × USD 190,000 = USD 1.71 billion for conventional hardware plus 600 MW × 45% × USD 1,045,000 = USD 282.2 million for AI hardware. Segments, five regions and 12 countries sum to the total in every year from 2020 to 2035, and growth rates are recomputed from endpoints. Fuller notes are on the research methodology page.
Three bound checks test the result. First, resale of USD 160,000 per conventional megawatt equals about 4% of the roughly USD 4.0 million original cost of 500 servers, inside the low single-digit residual values typical of six-year-old hardware (ceiling). Second, the 2025 market equals 0.35% of the USD 570.04 billion data center market, consistent with a service applied only at end of life (ceiling). Third, Sims Lifecycle Services alone reported about USD 0.49 billion of revenue, so a market below that level would be impossible (floor). Related hardware markets for the equipment that later enters ITAD are sized in the AI Server Market and Server Chassis Market reports.
Table of contents
- 01Introduction and Key Market Statistics
- 1.1Market Snapshot, 2025, 2026 and 2035
- 1.2Key Market Statistics
- 1.3Key Takeaways
- 02Executive Summary
- 2.1Market Size 2020-2035
- 2.2Retired IT Hardware 2020-2035
- 03Market Scope
- 3.1Included
- 3.2Excluded
- 3.3How the Segments Fit Together
- 3.4Why Published Estimates Differ
- 04Market Drivers
- 4.1Shorter Server Lives at Amazon Web Services
- 4.2Memory and Storage Resale Prices
- 4.3First AI Hardware Cohorts Reach Retirement
- 05Market Restraints
- 5.1Hyperscaler Insourcing
- 5.2Component Price Risk
- 06Market Trends
- 6.1Component Harvesting Instead of Whole-Server Resale
- 6.2Liquid-Cooled AI Rack Decommissioning
- 07Market Opportunities
- 7.1AI and GPU Server Recovery
- 7.2Colocation Operators as a Channel
- 08Pricing
- 8.1Service Fee and Resale Value per Retired MW, 2020-2035
- 8.2Colocation Operators: Equinix, Nxera and Tenant ITAD Pricing
- 09Standards and Regulation
- 9.1NIST SP 800-88 Revision 2
- 9.2IEEE 2883-2022
- 9.3EU Ecodesign Regulation (EU) 2019/424
- 9.4EU WEEE Directive and Critical Raw Materials Act
- 9.5R2v3 and e-Stewards Certification
- 10Market Segmentation
- 10.1By Service Type
- 10.2Component Harvesting and Resale
- 10.3Remarketing of Whole Systems
- 10.4Data Sanitization and Destruction
- 10.5Logistics and De-installation
- 10.6Recycling and Materials Recovery
- 10.7By Asset Type
- 10.8General-Purpose Servers
- 10.9AI and GPU Servers
- 10.10Storage Drives and Arrays
- 10.11Networking Equipment
- 10.12By Client Type
- 10.13Hyperscale and Cloud
- 10.14Colocation
- 10.15Enterprise and Government
- 11DC Exclusive: Hyperscaler In-House Recovery Tracker
- 11.1Disclosed Hyperscaler Recovery Programmes
- 11.2Client Type × Hardware Type Matrix, 2025
- 12Regional Insights
- 12.1North America
- 12.2Europe
- 12.3Asia Pacific
- 12.4Latin America
- 12.5Middle East and Africa
- 13Country Analysis
- 13.1United States
- 13.2China
- 13.3Germany
- 13.4Canada
- 13.5United Kingdom
- 13.6Japan
- 13.7Netherlands
- 13.8France
- 13.9Australia
- 13.10India
- 13.11Ireland
- 13.12Singapore
- 13.13Other Countries: South Korea, Taiwan, Italy, Spain, Brazil, Mexico and Others
- 14Forecast Scenarios
- 14.1Low Scenario
- 14.2Base Scenario
- 14.3High Scenario
- 15Competitive Insights
- 15.1Sims Lifecycle Services
- 15.2Iron Mountain (ITRenew)
- 15.3TES (SK ecoplant)
- 15.4Arrow Electronics
- 15.5Apto Solutions
- 15.6ERI
- 15.7Park Place Technologies
- 15.8Procurri
- 15.9Wisetek
- 15.10Exit Technologies
- 15.11Dataknox
- 15.12DataSpan
- 15.13Hewlett Packard Enterprise Financial Services
- 15.14Dell Technologies
- 15.15Cisco Refresh
- 15.16IBM
- 15.17Business Models, Customer Behavior and Strategic Implications
- 16Recent Developments
- 16.1Dated Events, December 2024 to August 2026
- 17Methodology
- 17.1Model Inputs and Receipt
- 17.2Bound Checks
- Fig. 1Data Center IT Asset Disposition (ITAD) Market Size, 2020-2035 (USD million)
- Table 1Market Attributes, 2025, 2026 and 2035
- Table 2Scope Comparison: In and Out of Scope
- Table 3Service Fee and Resale Value per Retired MW, 2020-2035
- Table 4Market by Service Type, 2025 and 2035
- Table 5Market by Asset Type, 2025 and 2035
- Table 6Market by Client Type, 2025 and 2035
- Table 7Hyperscaler In-House Recovery Tracker
- Table 8Client Type × Hardware Type Matrix, 2025
- Table 9Market by Region, 2025 and 2035
- Table 10Top 12 Countries, 2025 and 2035
- Table 11Forecast Scenarios, 2030 and 2035
About this report
Written by Amit Jain and reviewed by Deepti Agrawal, Senior Editor, Research. Figures are built top-down and bottom-up and reconciled before publication, with 2025 as the base year.
Read our methodologyHow we built this
- Historical period2020-2024
- Base year2025
- Forecast period2026-2035
- Sizing approachTop-down + bottom-up
Need more than the report?
Advisory on this market
Due diligence, site selection and market entry work, by the analysts who wrote this report.
See consulting servicesFrequently asked questions
USD 2.29 billion in 2026, up 14.9% from USD 1.99 billion in 2025, according to DC Market Insights estimates. The market is projected to reach USD 5.95 billion by 2035, a CAGR of 11.55% from 2025.
USD 1.99 billion was spent in 2025 on data centre ITAD: third-party data sanitization, de-installation, logistics, resale of whole systems and harvested components, and recycling of servers, storage and network hardware leaving a data center.
11.55% a year from 2025 to 2035, after 12.47% a year from 2020 to 2025, because retired IT hardware rises from 16,987 MW in 2025 to 41,008 MW in 2035 and AI hardware carries five times more resale value per MW.
AI and GPU Servers grow fastest at 26.68% a year, from USD 282.15 million in 2025 to USD 3.00 billion by 2035, because AI capacity added from 2021 retires at five-year lives. Component Harvesting and Resale is the largest service at 47.2%.
About USD 60 per server in service fees and USD 320 in resale value in 2025, or USD 30,000 and USD 160,000 per retired conventional MW (DC Market Insights unit values). Resale sharing can make the client’s net cost negative.
North America leads with USD 897.55 million, 45.0% of 2025 value. The Middle East and Africa grows fastest at 17.40% a year because Gulf AI and cloud halls built from 2021 reach their first refresh after 2026.
Sims Lifecycle Services leads with about 18% of 2026 value, and the top five hold about 52% (DC Market Insights assessment). Iron Mountain (ITRenew), TES, Arrow Electronics and Apto Solutions follow.
About USD 1.75 billion of recovery value stayed in house in 2025 (DC Market Insights estimate). Microsoft reported a 90.9% reuse and recycling rate for servers and components in 2024 through its Circular Centers.
NIST SP 800-88 Revision 2, published 26 September 2025, and IEEE 2883-2022 set sanitization methods; EU Regulation 2019/424 has required a secure data deletion function on servers since 1 March 2020.
USD 2.29 billion in 2026 counts only third-party ITAD of data center hardware. Estimates above USD 14 billion add laptops, desktops and mobile devices, and some add the USD 1.75 billion hyperscalers recover in house.
USD 1.99 billion in 2025 was spent on third-party services and value recovery for IT hardware leaving a data center. It covers data sanitization and destruction, de-installation, reverse logistics, remarketing of whole systems, component harvesting and resale, and recycling. Laptops, desktops and phones are excluded.
16,987 MW of IT hardware retired in 2025, of which third-party ITAD providers handled about 54% by value. Conventional retirements were 16,387 MW and AI retirements 600 MW, rising to 4,200 MW in 2030 and 13,200 MW in 2035.
ITAD covers the hardware leaving a data center: sanitization, logistics, resale and recycling, worth USD 1.99 billion in 2025. Removal of power, cooling and building plant is excluded and is sized in the Data Center Decommissioning Service Market report.
Get this report
How do I get the full report?
Request a quote; we reply by email within one business day.
How and when will I receive the report?
By email, within 24-48 business hours of payment.
How can I pay?
Once you accept the quote, we email you a secure payment link.
Can I see a sample first?
Yes. Request a free sample and we will email it to you.
Can the report be tailored to my needs?
Yes. We can add countries, segments or data cuts. Talk to an analyst about the scope you need.
Can I get an invoice or pay against a purchase order?
Write to sales@dcmarketinsights.com and our team will help.