Proprietary data

Data Centers in Indonesia

Every data center in Indonesia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 27 November 2026, DC Market Insights tracks 76 data centers in Indonesia run by 33 operators: 61 operational, 8 under construction and 7 planned. Stated operational capacity is 348 MW, with a further 1,084 MW under construction and 1,878 MW planned. DCI Indonesia holds the largest share of tracked operational capacity (29%).

76Facilities tracked
33Operators
348 MWOperational (61 sites)
1,084 MWUnder construction (8 sites)
1,878 MWPlanned (7 sites)

MW = IT capacity where the source states it, otherwise total capacity. 37 of 76 facilities have a stated capacity; the others are counted as sites only.

Greater Jakarta Data Center Campus · EdgeConneX · Jakarta (approximate location)CGK Campus · Digital Edge · Bekasi (approximate location)JC3 · Princeton Digital Group · Bekasi (approximate location)AI Campus 2 (CGK4) · BDx · Purwakarta (approximate location)NeutraDC Nxera Batam BTM-1 · NeutraDC Nxera Batam · Batam (approximate location)Kabil Industrial Tech Park (KITP) · DayOne · Batam (approximate location)JK1 · Equinix · Jakarta (approximate location)EDGE2 · Digital Edge · Jakarta (approximate location)JC4 · Princeton Digital Group · Bekasi (approximate location)JC1 and JC2 (Cibitung campus) · Princeton Digital Group · Bekasi (approximate location)STTGDC JKT1 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT2 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT3 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT4 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT5 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT6 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT7 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT8 · ST Telemedia Global Data Centres · Cikarang (approximate location)STTGDC JKT9 · ST Telemedia Global Data Centres · Cikarang (approximate location)Nongsa Digital Park (NDP) campus · DayOne · Batam (approximate location)DCI H1 Campus JK1 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK2 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK3 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK5 · DCI Indonesia · Cibitung (approximate location)DCI H1 Campus JK6 · DCI Indonesia · Cibitung (approximate location)DCI H2 Campus 01 · DCI Indonesia · Karawang (approximate location)DCI H2 Campus 02 · DCI Indonesia · Karawang (approximate location)DCI E1 · DCI Indonesia · Jakarta (approximate location)DCI E2 Surabaya · DCI Indonesia · Surabaya (approximate location)Jakarta 2 Data Center · NTT DATA · Jakarta (approximate location)Jakarta 2 Annex Data Center · NTT DATA · Jakarta (approximate location)Jakarta 3 Data Center · NTT DATA · Bekasi (approximate location)PDG Bintaro · Princeton Digital Group · Bintaro (approximate location)PDG Bandung · Princeton Digital Group · Bandung (approximate location)PDG Pekanbaru · Princeton Digital Group · Pekanbaru (approximate location)PDG Surabaya · Princeton Digital Group · Surabaya (approximate location)CGK1 Jakarta City Center · BDx · Jakarta (approximate location)CGK2 Technopark BSD · BDx · South Tangerang (approximate location)CGK3/3A South Jakarta · BDx · Jakarta (approximate location)CGK5 Suryacipta AI Campus 3 · BDx · Karawang (approximate location)NeutraDC HDC Cikarang JKT-1 Building 1 · NeutraDC · Cikarang (approximate location)NeutraDC Serpong · NeutraDC · South Tangerang (approximate location)NeutraDC Sentul · NeutraDC · Bogor (approximate location)NeutraDC Surabaya · NeutraDC · Surabaya (approximate location)Biznet DC Bogor Cimanggis Technovillage · Biznet · Gunung Putri (approximate location)Biznet DC Badung Jimbaran · Biznet · Jimbaran (approximate location)Biznet DC Yogyakarta Technocenter Jefferson · Biznet · Yogyakarta (approximate location)Biznet DC Semarang Technocenter · Biznet · Semarang (approximate location)Biznet DC Jakarta Sudirman MidPlaza · Biznet · Jakarta (approximate location)Biznet DC Surabaya Technocenter · Biznet · Surabaya (approximate location)K2 JKT01 Phase 1 · K2 Data Centres · Cikarang (approximate location)BDDC JST1 Phase 1 · Bersama Digital Data Centres · Jakarta (approximate location)BDDC JBT1 Phase 1 · Bersama Digital Data Centres · Jakarta (approximate location)MettaDC ID01 Phase 1 · MettaDC · Bekasi (approximate location)Digital Hyperspace JKT1A Building 1 · Digital Hyperspace Indonesia · Bekasi (approximate location)MIG CGK11 Data Center Phase 1 · Mitra Informatika Gemilang · Jakarta (approximate location)SM+ Data Center SME01B Phase 1 · SM+ · Jakarta (approximate location)ISC Data Center MPR Phase 1 · Indonesia Super Corridor · Jakarta (approximate location)ISC Datacenter DPR · Indonesia Super Corridor · Denpasar (approximate location)BSSN Data Center Sawangan Phase 1 · Badan Siber dan Sandi Negara · Depok (approximate location)Bank Indonesia SINERGI-2 Data Center 2 Phase 1 · Bank Indonesia · Karawang (approximate location)Pusat Data BPK RI · Badan Pemeriksa Keuangan · Jakarta (approximate location)Data Center Sekretariat Negara Jakarta · Kementerian Sekretariat Negara · Jakarta (approximate location)Datacenter LPSK Jakarta · Lembaga Perlindungan Saksi dan Korban · Jakarta (approximate location)Bappenas Data Center Wisma Bakrie 2 · Bappenas · Jakarta (approximate location)Bank Mandiri DRC 1 Injoko Surabaya Phase 1 · Bank Mandiri · Surabaya (approximate location)OCBC ON Space Data Center ON1 · Bank OCBC NISP · Tangerang (approximate location)BRI Data Center GTI · Bank Rakyat Indonesia · Jakarta (approximate location)BRI Data Center TBN · Bank Rakyat Indonesia · Tabanan (approximate location)KAI Data Center Availability Zone-B Phase 1 · Kereta Api Indonesia · Bandung (approximate location)Pegadaian The Gade Tower Data Center Phase 1 · Pegadaian · Jakarta (approximate location)Pertamina Sinergi Data Center Phase 1 · Pertamina · Jakarta (approximate location)BNI Data Center Slipi · Bank Negara Indonesia · Jakarta (approximate location)Universitas Terbuka UPT-TIK Data Center · Universitas Terbuka · South Tangerang (approximate location)EDGE1 · Digital Edge · Jakarta (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Indonesia data center market: key facts

  • Capacity under construction or planned (2,962 MW) is 8.5 times the operational base of 348 MW.
  • The three largest operators by operational capacity, DCI Indonesia, NTT DATA and NeutraDC, hold 61% of tracked operational MW.
  • DCI Indonesia has the largest development pipeline in Indonesia: 1,000 MW under construction or planned.
  • The largest operational facility we track is Jakarta 3 Data Center (NTT DATA, Bekasi) at 45 MW.
  • The largest project in the pipeline is DCI H5 Data Center Park (1,000 MW, planned).
  • Jakarta is the largest cluster: 58 of 76 facilities and 55% of tracked capacity.
  • By type, the tracker lists 50 colocation, 15 enterprise and 11 hyperscale facilities.
  • 37 of 76 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational348 MW
Under construction1,084 MW
Planned1,878 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Capacity by year opened or expected, MW
3≤2014'15'16'177'18'1912'2015'2145'2219'2323'2436'259'26

OperationalUnder construction or planned Facilities with a stated year and capacity only.

Largest operators in Indonesia by tracked capacity, MW
BDx447 MW
DayOne360 MW
NTT DATA66.4 MW

OperationalUnder construction or planned

Capacity by market in Indonesia, MW
Jakarta1,818 MW
Batam1,360 MW
Jatiluhur120 MW
Surabaya12 MW

OperationalUnder construction or planned

Facilities by type
Colocation50
Enterprise15
Hyperscale11

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Indonesia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
DCI Indonesia10101 MW1,000 MW29%
ST Telemedia Global Data Centres942 MW332 MW12%
Princeton Digital Group726 MW360 MW7.5%
Biznet6———
BDx537.4 MW410 MW11%
NeutraDC444 MW—13%
NTT DATA366.4 MW—19%
Digital Edge329 MW500 MW8.3%
Indonesia Super Corridor2———
DayOne2—360 MW—
Bersama Digital Data Centres2———
Bank Rakyat Indonesia2———
EdgeConneX12 MW—0.6%
Kementerian Sekretariat Negara1———
Bank Indonesia1———
Universitas Terbuka1———
Badan Pemeriksa Keuangan1———
SM+1———
Pertamina1———
Bappenas1———
MettaDC1———
Bank OCBC NISP1———
Kereta Api Indonesia1———
Bank Mandiri1———
K2 Data Centres1———
Badan Siber dan Sandi Negara1———
Equinix1———
Digital Hyperspace Indonesia1———
Pegadaian1———
NeutraDC Nxera Batam1———
Mitra Informatika Gemilang1———
Lembaga Perlindungan Saksi dan Korban1———
Bank Negara Indonesia1———

Largest data center projects in Indonesia

Under construction and planned facilities with a stated capacity, largest first. 1,084 MW under construction and 1,878 MW planned in total.

ProjectLocationStatusTypeCapacity
DCI H5 Data Center ParkDCI Indonesia Bintan Planned Hyperscale 1,000 MW
CGK CampusDigital Edge Bekasi Under construction Hyperscale 500 MW
Kabil Industrial Tech Park (KITP)DayOne Batam Planned Hyperscale 360 MW
CGK5 Suryacipta AI Campus 3BDx Karawang Planned Hyperscale 290 MW
JC4Princeton Digital Group Bekasi Under construction Hyperscale 240 MW
AI Campus 2 (CGK4)BDx Purwakarta Under construction Hyperscale 120 MW
JC3Princeton Digital Group Bekasi Under construction Hyperscale 120 MW
STTGDC JKT7ST Telemedia Global Data Centres Cikarang Planned Colocation 60 MW
STTGDC JKT8ST Telemedia Global Data Centres Cikarang Planned Colocation 60 MW
STTGDC JKT9ST Telemedia Global Data Centres Cikarang Planned Colocation 60 MW
STTGDC JKT4ST Telemedia Global Data Centres Cikarang Planned Colocation 48 MW
STTGDC JKT5ST Telemedia Global Data Centres Cikarang Under construction Colocation 40 MW

How Indonesia compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
Australia86122,402 MW8,138 MW
India232432,401 MW7,859 MW
Malaysia92371,265 MW3,829 MW
China23581776 MW2,772 MW
Indonesia7633348 MW2,962 MW
Japan11127922 MW1,957 MW
South Korea5116734 MW588 MW
Singapore5524437 MW309 MW
New Zealand187113 MW615 MW
Thailand302051.6 MW464 MW
Taiwan4316107 MW276 MW
Uzbekistan1383.1 MW364 MW

Data center deals in Indonesia

Our Deal Tracker lists 11 deals in Indonesia since January 2026, with $5.49B in disclosed value.

  • PT SMPlus Cakrawala Cipta Gemilang (PT Dian Swastatika Sentosa Tbk subsidiary) → 16.6 ha land, Cluster 2B, D-Hub Special Economic Zone, BSD City, Tangerang, Banten Land / campus $185.6M
  • SM+ (PT SMPlus Digital Investama, backed by Sinar Mas) → PDG Indonesia enterprise data center business (5 operational data centers: Greater Jakarta, Bandung, Surabaya, Pekanbaru) M&A
  • SOS Limited (Future Digital Trading Pte. Ltd.) → Planned ~500MW wholesale AI and cloud data centre campus, KEK Galang Batang, Bintan (phase 1 ~50MW) JV / partnership · 500 MW

All Indonesia deals in the Deal Tracker

Facilities

76 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DCI H5 Data Center ParkDCI Indonesia Bintan Planned 1,000 MW IT — Operator / official
CGK CampusDigital Edge
History
  1. Announced
  2. Under construction
  3. Under construction
Bekasi Under construction 500 MW IT — Operator / official
Kabil Industrial Tech Park (KITP)DayOne
History
  1. Announced
  2. Planned
Batam Planned 360 MW IT — Operator / official
CGK5 Suryacipta AI Campus 3BDx Karawang Planned 290 MW IT — Operator / official
JC4Princeton Digital Group Bekasi Under construction 240 MW total — Operator / official
AI Campus 2 (CGK4)BDx
History
  1. Under construction
  2. Under construction
Purwakarta Under construction 120 MW IT — Trade press
JC3Princeton Digital Group
History
  1. Under construction
  2. Under construction
Bekasi Under construction 120 MW total — Operator / official
STTGDC JKT7ST Telemedia Global Data Centres Cikarang Planned 60 MW IT — Operator / official
STTGDC JKT8ST Telemedia Global Data Centres Cikarang Planned 60 MW IT — Operator / official
STTGDC JKT9ST Telemedia Global Data Centres Cikarang Planned 60 MW IT — Operator / official
STTGDC JKT4ST Telemedia Global Data Centres Cikarang Planned 48 MW IT — Operator / official
Jakarta 3 Data CenterNTT DATA
History
  1. Operational
  2. Operational
Bekasi Operational 45 MW IT 2022 Operator / official
STTGDC JKT5ST Telemedia Global Data Centres Cikarang Under construction 40 MW IT — Operator / official
STTGDC JKT6ST Telemedia Global Data Centres Cikarang Under construction 40 MW IT — Operator / official
DCI H1 Campus JK6DCI Indonesia
History
  1. Operational
  2. Operational
Cibitung Operational 36 MW 2025 Operator / official
CGK3/3A South JakartaBDx Jakarta Operational 26 MW IT — Operator / official
JC1 and JC2 (Cibitung campus)Princeton Digital Group
History
  1. Planned
  2. Operational
Bekasi Operational 26 MW total — Operator / official
STTGDC JKT2ST Telemedia Global Data Centres Cikarang Operational 24 MW IT — Operator / official
STTGDC JKT3ST Telemedia Global Data Centres
History
  1. Under construction
  2. Under construction
Cikarang Under construction 24 MW IT — Operator / official
EDGE2Digital Edge
History
  1. Operational
  2. Operational
Jakarta Operational 23 MW IT 2024 Operator / official
NeutraDC HDC Cikarang JKT-1 Building 1NeutraDC Cikarang Operational 21.5 MW IT — Operator / official
DCI E1DCI Indonesia
History
  1. Operational
  2. Operational
  3. Operational
Jakarta Operational 19 MW IT 2023 Operator / official
STTGDC JKT1ST Telemedia Global Data Centres Cikarang Operational 18 MW IT — Operator / official
DCI H1 Campus JK5DCI Indonesia
History
  1. Operational
  2. Operational
  3. Operational
Cibitung Operational 15 MW 2021 Operator / official
NeutraDC SerpongNeutraDC South Tangerang Operational 14 MW IT — Operator / official
DCI H1 Campus JK3DCI Indonesia
History
  1. Operational
  2. Operational
Cibitung Operational 12 MW 2020 Operator / official
Jakarta 2 Annex Data CenterNTT DATA Jakarta Operational 12 MW IT — Operator / official
Jakarta 2 Data CenterNTT DATA Jakarta Operational 9.4 MW IT — Operator / official
DCI E2 SurabayaDCI Indonesia
History
  1. Operational
  2. Operational
Surabaya Operational 9 MW IT 2026 Operator / official
CGK1 Jakarta City CenterBDx Jakarta Operational 8 MW IT — Operator / official
DCI H1 Campus JK2DCI Indonesia
History
  1. Operational
  2. Operational
Cibitung Operational 7 MW 2018 Operator / official
EDGE1Digital Edge Jakarta Operational 6 MW IT — Operator / official
NeutraDC SentulNeutraDC Bogor Operational 5.5 MW IT — Operator / official
CGK2 Technopark BSDBDx South Tangerang Operational 3.4 MW IT — Operator / official
DCI H1 Campus JK1DCI Indonesia
History
  1. Operational
  2. Operational
Cibitung Operational 3 MW 2013 Operator / official
NeutraDC SurabayaNeutraDC Surabaya Operational 3 MW IT — Operator / official
Greater Jakarta Data Center CampusEdgeConneX
History
  1. Planned
  2. Operational
Jakarta Operational 2 MW total — Operator / official
Bank Indonesia SINERGI-2 Data Center 2 Phase 1Bank Indonesia
History
  1. Operational
  2. Operational
Karawang Operational — — Operator / official
Bank Mandiri DRC 1 Injoko Surabaya Phase 1Bank Mandiri
History
  1. Operational
  2. Operational
Surabaya Operational — — Operator / official
Bappenas Data Center Wisma Bakrie 2Bappenas Jakarta Operational — — Operator / official
BDDC JBT1 Phase 1Bersama Digital Data Centres
History
  1. Operational
  2. Operational
Jakarta Operational — — Operator / official
BDDC JST1 Phase 1Bersama Digital Data Centres
History
  1. Operational
  2. Operational
Jakarta Operational — — Operator / official
Biznet DC Badung JimbaranBiznet Jimbaran Operational — — Operator / official
Biznet DC Bogor Cimanggis TechnovillageBiznet Gunung Putri Operational — — Operator / official
Biznet DC Jakarta Sudirman MidPlazaBiznet Jakarta Operational — — Operator / official
Biznet DC Semarang TechnocenterBiznet Semarang Operational — — Operator / official
Biznet DC Surabaya TechnocenterBiznet Surabaya Operational — — Operator / official
Biznet DC Yogyakarta Technocenter JeffersonBiznet Yogyakarta Operational — — Operator / official
BNI Data Center SlipiBank Negara Indonesia Jakarta Operational — — Operator / official
BRI Data Center GTIBank Rakyat Indonesia Jakarta Operational — — Operator / official

Get the data

Every data center in Indonesia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

Data Centers in Indonesia: Capacity Sheet

76 facilities

Every tracked data center in Indonesia with operator, city, status, MW, year and source, plus summaries by city and operator and the status history. Excel, updated weekly.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

All countries

Global Data Center Database: annual licence

4,486 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Indonesia

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Indonesia

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Indonesia?

DC Market Insights tracks 76 data centers in Indonesia as of November 2026: 61 operational, 8 under construction and 7 planned, run by 33 operators. The count grows as we verify more sites.

What is the data center capacity of Indonesia?

Tracked operational capacity in Indonesia is 348 MW, with 1,084 MW under construction and 1,878 MW planned. These totals use the capacity each source states (IT load where given) and cover 37 of 76 tracked facilities.

Which companies operate the most data center capacity in Indonesia?

By tracked operational capacity, the largest operators in Indonesia are DCI Indonesia (101 MW), NTT DATA (66.4 MW) and NeutraDC (44 MW).

Where are the data centers in Indonesia located?

The largest clusters by tracked capacity are Jakarta (58 facilities), Batam (4 facilities) and Jatiluhur (1 facilities). The map above shows every site.

Which new data centers are being built in Indonesia?

We track 1,084 MW under construction and 1,878 MW planned. The largest projects are DCI H5 Data Center Park (1,000 MW), CGK Campus by Digital Edge (500 MW) and Kabil Industrial Tech Park (KITP) by DayOne (360 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Indonesia have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Indonesia capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy