Proprietary data

Data Centers in Australia

Every data center in Australia that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 22 October 2026, DC Market Insights tracks 6 data centers in Australia run by 3 operators: 3 operational, 0 under construction and 3 planned. Stated operational capacity is 170 MW, with a further — under construction and 1,138 MW planned. AirTrunk holds the largest share of tracked operational capacity (100%).

6Facilities tracked
3Operators
170 MWOperational (3 sites)
—Under construction (0 sites)
1,138 MWPlanned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 6 facilities have a stated capacity; the others are counted as sites only.

SYD2 · AirTrunk · Sydney (approximate location)MEL1 · AirTrunk · Melbourne (approximate location)MEL2 · AirTrunk · Melbourne (approximate location)Gore Hill Data Centre · Keppel · Sydney (approximate location)Keppel AI Data Centre Campus (Morwell) · Keppel · Morwell (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Australia data center market: key facts

  • Capacity under construction or planned (1,138 MW) is 6.7 times the operational base of 170 MW.
  • The three largest operators by operational capacity, AirTrunk, Keppel and Vantage Data Centers, hold 100% of tracked operational MW.
  • Keppel has the largest development pipeline in Australia: 720 MW under construction or planned.
  • The largest operational facility we track is SYD2 (AirTrunk, Sydney) at 120 MW.
  • The largest project in the pipeline is Keppel AI Data Centre Campus (Morwell) (720 MW, planned).
  • Morwell is the largest cluster: 1 of 6 facilities and 55% of tracked capacity.
  • By type, the tracker lists 5 hyperscale and 1 colocation facilities.
  • 5 of 6 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational170 MW
Planned1,138 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Australia by tracked capacity, MW
Keppel720 MW
AirTrunk524 MW

OperationalUnder construction or planned

Capacity by market in Australia, MW
Morwell720 MW
Melbourne468 MW
Sydney120 MW

OperationalUnder construction or planned

Facilities by type
Hyperscale5
Colocation1

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Operators in Australia

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
AirTrunk3170 MW354 MW100%
Keppel2—720 MW—
Vantage Data Centers1—64 MW—

Largest data center projects in Australia

Under construction and planned facilities with a stated capacity, largest first. — under construction and 1,138 MW planned in total.

ProjectLocationStatusTypeCapacity
Keppel AI Data Centre Campus (Morwell)Keppel Morwell Planned Hyperscale 720 MW
MEL2AirTrunk Melbourne Planned Hyperscale 354 MW
Vantage Melbourne (MEL1) campusVantage Data Centers Melbourne Planned Hyperscale 64 MW

How Australia compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
India199312,276 MW7,840 MW
Malaysia81311,248 MW3,511 MW
Indonesia21899 MW1,672 MW
Japan7420697 MW1,059 MW
Australia63170 MW1,138 MW
Singapore5221400 MW315 MW
Uzbekistan1383.1 MW364 MW
Kazakhstan361333.1 MW312 MW
South Korea8468.4 MW228 MW
China209196 MW64 MW
Taiwan361192 MW165 MW
Thailand8625 MW232 MW

Data center deals in Australia

Our Deal Tracker lists 26 deals in Australia since January 2026, with $32.28B in disclosed value.

  • Goodman Group; Digital Realty (jointly owned entity) → Up to 9.9% of NEXTDC Ltd (ASX: NXT) M&A $501.1M
  • Banco Santander, BNP Paribas, Credit Agricole CIB, DBS Bank, Deutsche Bank, ING, Mizuho, MUFG, National Australia Bank, Royal Bank of Canada, Societe Generale, SMBC, HSBC, UOB (lead banks; 32 lenders in total) → AirTrunk SYD3 campus, Western Sydney Financing $2.99B
  • Unnamed global technology firm → DigiCo SYD1 data centre, Sydney (71 MW) Land / campus · 71 MW
  • EdgeConneX; Stockland → Hyperscale data center campus JV, Australia (initial campuses Sydney and Melbourne, 450 MW power secured) JV / partnership · 450 MW
  • Macquarie Capital → Zerra DC Financing
  • CDC Data Centres → Four-building campus at 216 Ashfords Road, Gregadoo, near Wagga Wagga Land / campus $10.67B · 1,400 MW

All Australia deals in the Deal Tracker

Facilities

6 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Keppel AI Data Centre Campus (Morwell)Keppel Morwell Planned 720 MW total — Operator / official
MEL2AirTrunk Melbourne Planned 354 MW total — Operator / official
SYD2AirTrunk Sydney Operational 120 MW total — Operator / official
Vantage Melbourne (MEL1) campusVantage Data Centers Melbourne Planned 64 MW IT — Operator / official
MEL1AirTrunk Melbourne Operational 50 MW total 2017 Operator / official
Gore Hill Data CentreKeppel Sydney Operational — 2011 Operator / official

Get the data

Every data center in Australia, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Australia

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Australia

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Australia?

DC Market Insights tracks 6 data centers in Australia as of October 2026: 3 operational, 0 under construction and 3 planned, run by 3 operators. The count grows as we verify more sites.

What is the data center capacity of Australia?

Tracked operational capacity in Australia is 170 MW, with — under construction and 1,138 MW planned. These totals use the capacity each source states (IT load where given) and cover 5 of 6 tracked facilities.

Which companies operate the most data center capacity in Australia?

By tracked operational capacity, the largest operators in Australia are AirTrunk (170 MW).

Where are the data centers in Australia located?

The largest clusters by tracked capacity are Morwell (1 facilities), Melbourne (3 facilities) and Sydney (2 facilities). The map above shows every site.

Which new data centers are being built in Australia?

We track — under construction and 1,138 MW planned. The largest projects are Keppel AI Data Centre Campus (Morwell) (720 MW), MEL2 by AirTrunk (354 MW) and Vantage Melbourne (MEL1) campus (64 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity does Australia have?

Installed capacity in MW (IT load), its share of the region, the largest tracked sites and the outlook to 2035.

See Australia capacity

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy