Data Centers in Kyrgyzstan

Every data center in Kyrgyzstan that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 8 November 2026, DC Market Insights tracks 7 data centers in Kyrgyzstan run by 6 operators: 4 operational, 0 under construction and 3 planned. Stated operational capacity is 0.5 MW. DataTime holds the largest share of tracked operational capacity (100%).

7Facilities tracked
6Operators
0.5 MWOperational (4 sites)
—Under construction (0 sites)
—Planned (3 sites)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 7 facilities have a stated capacity; the others are counted as sites only.

Datatime Data Center (DataDome) · DataTime · Bishkek (approximate location)NSP Data Center · NSP · Lebedinovka (approximate location)ProHost Data Center · ProHost · Bishkek (approximate location)National Bank of the Kyrgyz Republic Data Center · National Bank of the Kyrgyz Republic · Bishkek (approximate location)Ministry of Emergency Situations Modular Data Center Osh · Ministry of Emergency Situations of the Kyrgyz Republic · Osh (approximate location)National Bank of the Kyrgyz Republic Reserve Data Center · National Bank of the Kyrgyz Republic · Bishkek (approximate location)Manas Airport Modular Data Center · Airports of Kyrgyzstan · Bishkek (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Kyrgyzstan data center market: key facts

  • The three largest operators by operational capacity, DataTime, National Bank of the Kyrgyz Republic and Airports of Kyrgyzstan, hold 100% of tracked operational MW.
  • The largest operational facility we track is Datatime Data Center (DataDome) (DataTime, Bishkek) at 0.5 MW.
  • Bishkek is the largest cluster: 6 of 7 facilities and 100% of tracked capacity.
  • By type, the tracker lists 4 enterprise and 3 colocation facilities.
  • 1 of 7 facilities have a capacity stated by their source; the totals above count only those.
Facilities by type
Enterprise4
Colocation3

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Kyrgyzstan data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 20 October 2026. Government sources are linked; the full source list comes with the Excel data.

Kyrgyzstan has no data-center-specific law or tariff. Electricity is sold at national regulated tariffs: from 1 May 2026 industrial users pay 3.65 KGS/kWh and commercial users, the group that includes computing centers, 4.33 KGS/kWh (excl. taxes), while crypto mining pays 6.84 in an energy-intensive group. About 88% of generation is hydro, but the country imports power and has been under an energy-sector state of emergency since August 2023 (to 31 Dec 2026); all mining farms were disconnected in November 2025. regultek.gov.kg – Order No. 103 of 24.04.2026

Policy and incentives

The Medium-Term Tariff Policy 2025-2030 (Resolution No. 227) places computing centers in the Commercial tariff group and crypto mining in the Energy-intensive group, which rises by inflation plus 3.5% each 1 May to 2030. CBD – Resolution No. 227

High Technology Park residents get a special tax regime and pay 1% of quarterly revenue to the HTP directorate; permitted activities are software, IT export and call centres, with data centers not named. CBD – Law No. 84 On the High Technology Park

The Digital Code (No. 178 of 31 Jul 2025) covers data centers and has no general data-localization rule; personal data transfers to countries with adequate protection cannot be restricted. State Agency for Personal Data Protection – Digital Code

Miners must register and hold a certificate; mining in state and municipal buildings, or via unauthorised connection to their networks, is banned. CBD – Resolution No. 514, Annex 4

Power and grid

An energy-sector state of emergency runs from 1 Aug 2023 to 31 Dec 2026 because of low Naryn basin inflow and a shortage of generating capacity. CBD – Decree UP No. 178

In 2024 Kyrgyzstan generated 14.7 bn kWh, consumed 18.4 bn kWh and imported 3,841.5 million kWh of electricity. National Statistical Committee

Toktogul, the largest hydropower plant, is being rehabilitated to raise its capacity from 1,200 MW to 1,440 MW. Cabinet of Ministers – energy sector achievements

The Ministry of Energy disconnected all crypto-mining farms in November 2025 because of the power deficit.

Land, zoning and sites

The emergency decree gives the Ministry of Energy the right to identify and allocate land plots suitable for renewable energy. CBD – Decree UP No. 178

Sustainability, water and climate

About 88% of electricity generated in 2024 came from hydropower plants. National Statistical Committee

The government has approved 11 investment agreements for solar and wind plants totalling 5,200 MW. Cabinet of Ministers – energy sector achievements

Renewable projects get preferential periods of 15 years for hydro and 25 years for solar, wind, biomass and geothermal under the Law on Renewable Energy Sources. CBD – Law No. 49 On Renewable Energy Sources

Operators in Kyrgyzstan

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
National Bank of the Kyrgyz Republic2———
DataTime10.5 MW—100%
Ministry of Emergency Situations of the Kyrgyz Republic1———
Airports of Kyrgyzstan1———
ProHost1———
NSP1———

How Kyrgyzstan compares in Asia-Pacific

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
India199312,276 MW7,840 MW
Malaysia81311,248 MW3,511 MW
Indonesia21899 MW1,672 MW
Japan7420697 MW1,059 MW
Australia63170 MW1,138 MW
Singapore5221400 MW315 MW
Uzbekistan1383.1 MW364 MW
Kazakhstan361333.1 MW312 MW
South Korea8468.4 MW228 MW
China209196 MW64 MW
Taiwan361192 MW165 MW
Thailand8625 MW232 MW

Facilities

7 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Datatime Data Center (DataDome)DataTime Bishkek Operational 0.5 MW total 2024 Trade press
Manas Airport Modular Data CenterAirports of Kyrgyzstan Bishkek Planned — — Trade press
Ministry of Emergency Situations Modular Data Center OshMinistry of Emergency Situations of the Kyrgyz Republic Osh Planned — — Trade press
National Bank of the Kyrgyz Republic Data CenterNational Bank of the Kyrgyz Republic Bishkek Operational — — Trade press
National Bank of the Kyrgyz Republic Reserve Data CenterNational Bank of the Kyrgyz Republic Bishkek Planned — — Operator / official
NSP Data CenterNSP Lebedinovka Operational — 2018 Trade press
ProHost Data CenterProHost Bishkek Operational — — Trade press

Get the data

Every data center in Kyrgyzstan, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

3,314 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Kyrgyzstan

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Kyrgyzstan

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Kyrgyzstan?

DC Market Insights tracks 7 data centers in Kyrgyzstan as of November 2026: 4 operational, 0 under construction and 3 planned, run by 6 operators. The count grows as we verify more sites.

What is the data center capacity of Kyrgyzstan?

Tracked operational capacity in Kyrgyzstan is 0.5 MW, with — under construction and — planned. These totals use the capacity each source states (IT load where given) and cover 1 of 7 tracked facilities.

Which companies operate the most data center capacity in Kyrgyzstan?

By tracked operational capacity, the largest operators in Kyrgyzstan are DataTime (0.5 MW).

Where are the data centers in Kyrgyzstan located?

The largest clusters by tracked capacity are Bishkek (6 facilities) and Osh (1 facilities). The map above shows every site.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy