Arcem Data Centers

Data centers operated by Arcem that we have verified: location, status and capacity, each checked against its source.

In short

As of 26 October 2026, DC Market Insights tracks 1 data center operated by Arcem in 1 country (0 operational).

1Facilities tracked
1Countries
—Operational (0 sites)
—Under construction (0 sites)
60 MWPlanned (1 site)

MW = IT capacity where the source states it, otherwise total capacity. 1 of 1 facilities have a stated capacity; the others are counted as sites only.

Arcem Joroinen (Huutokoski) · Arcem · Joroinen (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Arcem data centers: key facts

  • The largest project in the pipeline is Arcem Joroinen (Huutokoski) (60 MW, planned).

Arcem development pipeline

Under construction and planned facilities with a stated capacity, largest first. — under construction and 60 MW planned in total.

ProjectLocationStatusTypeCapacity
Arcem Joroinen (Huutokoski)Arcem Joroinen, Finland Planned Other 60 MW

Facilities

1 facility matches. It is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Arcem Joroinen (Huutokoski)Other Joroinen, Finland Planned 60 MW total — Trade press

Market position

How Arcem compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Finland, Arcem ranks #6 of 16 tracked operators by capacity, with 3.6% of the country’s tracked MW.
  • Finland has 36 tracked data centers from 16 operators: 230 MW operational and 1,430 MW under construction or planned.
  • Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).

Data center operators in Finland

Tracked facilities3616 operators
Operational capacity230 MW1,430 MW in the pipeline
Arcem rank by capacity#6of 16 operators · 3.6%
Industrial power price58.4 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
atNorth441.6 MW590 MW
DayOne1—560 MW
Verne270 MW70 MW
Winda Energy1—100 MW
Nebius175 MW—
TikTok1—50 MW
Telia124 MW—
Glesys619.5 MW—

All data centers in Finland Power and policy in Finland

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Arcem operate?

DC Market Insights tracks 1 Arcem data center(s) in 1 country as of October 2026: 0 operational, 0 under construction and 1 planned.

Which other companies operate data centers in Finland?

Besides Arcem, the largest operators we track in Finland by capacity are atNorth, DayOne, Verne, Winda Energy and Nebius. The Finland page lists all 16 operators.

What rules apply to data centers in Finland?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst