Proprietary data

Glesys Data Centers

Data centers operated by Glesys that we have verified: location, status and capacity, each checked against its source.

In short

As of 15 November 2026, DC Market Insights tracks 8 data centers operated by Glesys in 2 countries, of which 8 are operational. Stated operational capacity is 23.7 MW.

8Facilities tracked
2Countries
23.7 MWOperational (8 sites)
—Under construction (0 sites)
—Planned (0 sites)

MW = IT capacity where the source states it, otherwise total capacity. 5 of 8 facilities have a stated capacity; the others are counted as sites only.

Glesys Pori (The Rock) · Glesys · Pori (approximate location)Glesys Oulu Elektroniikkatie 5 · Glesys · Oulu (approximate location)Glesys Oulu Elektroniikkatie 15 · Glesys · Oulu (approximate location)Glesys Oulu Yrttipellontie 1 · Glesys · Oulu (approximate location)Glesys Campus Oulu · Glesys · Oulu (approximate location) · Cooling: Direct liquidGlesys Tampere (The Deck) · Glesys · Tampere (approximate location)Glesys Stockholm · Glesys · Stockholm (approximate location)Glesys Falkenberg · Glesys · Falkenberg (exact location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate) Select a country on the map to open its page.

Market snapshot

Glesys data centers: key facts

About Glesys

Glesys is a Nordic infrastructure-as-a-service, cloud and colocation provider founded in 1999. It runs its own data centers in Falkenberg and Stockholm (Sweden) and in Oulu, Pori and Tampere (Finland), and in June 2026 it named data center facilities and cloud infrastructure in Falkenberg, Stockholm, Helsinki, Pori, Tampere and Oulu. Its new Campus Oulu is planned for up to 300 MW at full build-out, with a first phase of about 8 MW IT load. Cube Infrastructure Managers holds the majority stake.

Founded
1999
Ownership
Majority owned by Cube Infrastructure Fund III; founder Glenn Johansson and key employees keep a minority stake
Parent company
Cube Infrastructure Managers
Tracked footprint
8 facilities in 2 countries
Website
glesys.com

Data center business

  • All Glesys data centers run on 100% renewable electricity backed by Guarantees of Origin. The group's weighted-average PUE was 1.27 in 2025, and it reused 3,696 MWh of residual heat in district heating networks in Falkenberg and Stockholm.
  • Pori (The Rock), Kivipellontie 35b, is an underground site in a former Finnish Defence Forces tunnel complex: nine tunnel halls, 8,500 m² of usable space and 11 MW total site capacity. Three tunnels are in use and six are left for expansion; the site holds Katakri Level IV certification.
  • Glesys says most of its services run from its own data centers, with staff on site who control everything from cabling to cooling. It lists own data centers in Falkenberg, Oulu, Pori, Stockholm and Tampere, and partner data centers in Amsterdam, Copenhagen, Frankfurt, Helsinki, London and Oslo.
  • Falkenberg, Kanslistvägen 12 on the Swedish west coast, is a purpose-built Tier III facility from 2020 with 10 MW reserved power and 3.2 MW installed, up to 44 kW per rack aircooled, 2N power, UPS and cooling, and heat recovery into the district heating network.
  • Stockholm, Västberga Allé 60 in Hägersten, has 1 MW total power capacity, 1,200 m² of gross colocation space in a 2,400 m² building, N+1 redundancy with Tier II–III design, and feeds recovered heat to the city's district heating network.
  • In Oulu, Glesys runs three data centers at Elektroniikkatie 5, Elektroniikkatie 15 and Yrttipellontie 1 in the Oulu Technology Park area, with up to 22 kW per rack and N+2 UPS redundancy; Campus Oulu at Kaapelitie 4 is its fourth Oulu site.
  • Tampere, Pakkahuoneenaukio 2a near the railway station, is a connectivity-focused site with 0.5 MW total capacity, 400 m² of colocation space, N+1 redundancy and design to Tier III principles, with more than 10 connectivity providers on site.
  • Campus Oulu is an AI and HPC campus in a former industrial building, developed with Trevian Asset Management. It supports up to 250 kW per rack and liquid cooling; Glesys says 3,500 m² of white space and 8 MW are built and in operation, with 300 MW planned at full build-out.

Recent updates

  • Glesys said the first capacity at Campus Oulu was targeted to go live in November 2026; the brownfield build re-uses parts of an existing facility, with new floor tiles and a rebuilt network for high-density, liquid-cooled AI loads.
  • Glesys published its 2025 sustainability report under ESRS: 100% renewable electricity, weighted-average PUE 1.27, servers kept in use for up to 10 years, and a goal of climate-neutral own operations by 2030 without carbon offsets.
  • Glesys signed an agreement with Trevian Asset Management to set up Campus Oulu, a modular AI-ready campus with long-term potential of up to 300 MW; the first phase, with an initial IT load of about 8 MW, was expected to be ready for service in autumn 2026.
  • Glesys completed the integration of private cloud services and two Finnish data centers previously operated under Verne, and now runs production environments in Helsinki, Pori and Tampere; the team running the private cloud joined Glesys.
  • Cube Infrastructure Managers agreed to buy a majority stake in GleSYS Holding AB through Cube Infrastructure Fund III from VIA equity, with founder and CEO Glenn Johansson and key employees reinvesting for a minority stake.

Company details checked against company and official sources, 15 Nov 2026.

  • Its largest operational site is Glesys Pori (The Rock) in Pori, Finland at 11 MW.
  • Finland accounts for 82% of tracked capacity (6 facilities).
  • 5 of 8 facilities have a capacity stated by their source; the totals above count only those.
Capacity by country, MW
Finland19.5 MW
Sweden4.2 MW

OperationalUnder construction or planned

Facilities

8 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
Glesys Pori (The Rock)Colocation
History
  1. Operational
  2. Operational
Pori, Finland Operational 11 MW total — Operator / official
Glesys Campus OuluColocation Cooling: Direct liquid
History
  1. Planned
  2. Under construction
  3. Planned
  4. Operational
Oulu, Finland Operational 8 MW IT 2026 Operator / official
Glesys FalkenbergColocation Falkenberg, Sweden Operational 3.2 MW total 2020 Operator / official
Glesys StockholmColocation Stockholm, Sweden Operational 1 MW total — Operator / official
Glesys Tampere (The Deck)Colocation
History
  1. Operational
  2. Operational
Tampere, Finland Operational 0.5 MW total — Operator / official
Glesys Oulu Elektroniikkatie 15Colocation Oulu, Finland Operational — — Operator / official
Glesys Oulu Elektroniikkatie 5Colocation Oulu, Finland Operational — — Operator / official
Glesys Oulu Yrttipellontie 1Colocation Oulu, Finland Operational — — Operator / official

Market position

How Glesys compares

Computed from our tracker, Deal Tracker and Power & Policy Tracker. Capacity counts only facilities whose source states MW.

  • In Finland, Glesys ranks #15 of 24 tracked operators by capacity, with 0.7% of the country’s tracked MW.
  • Finland has 48 tracked data centers from 24 operators: 230 MW operational and 2,661 MW under construction or planned.
  • Industrial electricity in Finland costs 58.4 USD/MWh (2025, latest official figure).
  • In Sweden, Glesys ranks #10 of 18 tracked operators by capacity, with 0.2% of the country’s tracked MW.

Data center operators in Finland

Tracked facilities4824 operators
Operational capacity230 MW2,661 MW in the pipeline
Glesys rank by capacity#15of 24 operators · 0.7%
Industrial power price58.4 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
atNorth441.6 MW590 MW
DayOne1—560 MW
Nebius275 MW310 MW
FCDC Corp1—250 MW
AmpTank1—200 MW
Compute Nordic1—165 MW
Verne270 MW70 MW
Pure DC1—110 MW

All data centers in Finland Power and policy in Finland

Data center operators in Sweden

Tracked facilities4518 operators
Operational capacity172 MW2,510 MW in the pipeline
Glesys rank by capacity#10of 18 operators · 0.2%
Industrial power price78.5 USD/MWh2025
OperatorFacilitiesOperational MWPipeline MW
Google2—1,000 MW
Brookfield1—750 MW
EcoDataCenter380 MW400 MW
atNorth312 MW330 MW
Conapto439 MW—
Hydro66119.2 MW—
STACK Infrastructure118 MW—
evroc1—18 MW

All data centers in Sweden Power and policy in Sweden

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers does Glesys operate?

DC Market Insights tracks 8 Glesys data center(s) in 2 countries as of November 2026: 8 operational, 0 under construction and 0 planned.

Which other companies operate data centers in Finland?

Besides Glesys, the largest operators we track in Finland by capacity are atNorth, DayOne, Nebius, FCDC Corp and AmpTank. The Finland page lists all 24 operators.

What rules apply to data centers in Finland?

Our Power & Policy Tracker lists 6 government actions on data centers and power in Finland, including 0 restriction(s) and 0 incentive scheme(s) in force.

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst