Data Centers in Finland

Every data center in Finland that we have verified: operator, location, status and capacity, each checked against its source.

In short

As of 25 November 2026, DC Market Insights tracks 39 data centers in Finland run by 18 operators: 20 operational, 9 under construction and 10 planned. Stated operational capacity is 230 MW, with a further 920 MW under construction and 930 MW planned. Nebius holds the largest share of tracked operational capacity (33%).

39Facilities tracked
18Operators
230 MWOperational (20 sites)
920 MWUnder construction (9 sites)
930 MWPlanned (10 sites)

MW = IT capacity where the source states it, otherwise total capacity. 17 of 39 facilities have a stated capacity; the others are counted as sites only.

Google Hamina · Google · Hamina (approximate location) · Cooling: Air or free cooling · Owned: self-build on the former Summa paper mill siteGoogle Muhos · Google · Muhos (approximate location)Google Vaala · Google · Vaala (approximate location)QTS Forssa · QTS · Forssa (approximate location)Google Kajaani · Google · Kajaani (approximate location) · Owned: self-build by Tuike Finland Oy; the authority notes the project is publicly called Google's data centreMicrosoft Espoo · Microsoft · Espoo (approximate location)Microsoft Kirkkonummi · Microsoft · Kirkkonummi (approximate location)Microsoft Vihti · Microsoft · Vihti (approximate location)Microsoft GigaVaasa (Vaasa / Mustasaari) · Microsoft · Vaasa (approximate location)Nebius Mäntsälä · Nebius · Mäntsälä (approximate location)Verne Mäntsälä (Kapuli) · Verne · Mäntsälä (approximate location)atNorth FIN01 · atNorth · Helsinki (approximate location)atNorth FIN02 · atNorth · Espoo (approximate location) · Cooling: HybridatNorth FIN04 Myllykoski · atNorth · Kouvola (approximate location)Telia Helsinki Data Center · Telia · Helsinki (approximate location) · Cooling: HybridEquinix HE7 · Equinix · Espoo (approximate location)CSC LUMI data center Kajaani · CSC · Kajaani (approximate location)CSC LUMI AI Factory data center · CSC · Kajaani (approximate location)HyperCo Kouvola (Koria, TikTok) · HyperCo · Kouvola (approximate location)TikTok Lahti · TikTok · Lahti (approximate location) · Cooling: Air or free coolingGlesys Pori (The Rock) · Glesys · Pori (approximate location)atNorth FIN05 Salo · atNorth · Salo (approximate location)Equinix HE3 · Equinix · Helsinki (approximate location)Equinix HE4 · Equinix · Vantaa (approximate location)Equinix HE5 · Equinix · Helsinki (approximate location)Equinix HE6 · Equinix · Espoo (approximate location)Glesys Oulu Elektroniikkatie 5 · Glesys · Oulu (approximate location)Glesys Oulu Elektroniikkatie 15 · Glesys · Oulu (approximate location)Glesys Oulu Yrttipellontie 1 · Glesys · Oulu (approximate location)Glesys Campus Oulu · Glesys · Oulu (approximate location)Glesys Tampere (The Deck) · Glesys · Tampere (approximate location)Verne Vantaa campus (The Air) · Verne · Vantaa (approximate location)Hetzner Datacenter Helsinki (Tuusula) · Hetzner · Tuusula (approximate location)DayOne Nurmijärvi (Sudentulli, Klaukkala) · DayOne · Nurmijärvi (approximate location)Arcem Joroinen (Huutokoski) · Arcem · Joroinen (approximate location)Winda Energy Janakkala (MORE-Rastikangas) · Winda Energy · Janakkala (approximate location)Nebius Lappeenranta (Pajarila) · Nebius · Lappeenranta (approximate location)Pure DC Seinäjoki (SJK01) Phase 1 · Pure DC · Seinäjoki (approximate location)Borealis Kajaani Campus · Borealis Data Center · Kajaani (approximate location)
Operational Under construction Planned Pin = exact site location; dot = city (approximate)

Market snapshot

Finland data center market: key facts

  • Capacity under construction or planned (1,850 MW) is 8.0 times the operational base of 230 MW.
  • The three largest operators by operational capacity, Nebius, Verne and atNorth, hold 81% of tracked operational MW.
  • atNorth has the largest development pipeline in Finland: 590 MW under construction or planned.
  • The largest operational facility we track is Nebius Mäntsälä (Nebius, Mäntsälä) at 75 MW.
  • The largest project in the pipeline is DayOne Nurmijärvi (Sudentulli, Klaukkala) (560 MW, planned).
  • Helsinki is the largest cluster: 17 of 39 facilities and 48% of tracked capacity.
  • By type, the tracker lists 18 colocation, 16 hyperscale and 3 other facilities.
  • 17 of 39 facilities have a capacity stated by their source; the totals above count only those.
Capacity by status, MW
Operational230 MW
Under construction920 MW
Planned930 MW

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Largest operators in Finland by tracked capacity, MW
atNorth632 MW
DayOne560 MW
Nebius385 MW
Verne140 MW
Pure DC110 MW
Arcem60 MW
TikTok50 MW
Telia24 MW
Glesys19.5 MW

OperationalUnder construction or planned

Capacity by market in Finland, MW
Helsinki1,001 MW
Kouvola430 MW
Lappeenranta310 MW
Seinäjoki110 MW
Southern Finland100 MW
Eastern Finland60 MW
Lahti50 MW
Pori11 MW
Oulu8 MW
Tampere0.5 MW

OperationalUnder construction or planned

Facilities by type
Colocation18
Hyperscale16
Other3
Enterprise2

Source: DC Market Insights Data Center Tracker. MW as stated by each facility source.

Market context

What shapes the Finland data center market

Policy, power, land and demand, each statement checked against its source. Reviewed 15 October 2026. Government sources are linked; the full source list comes with the Excel data.

Finland ended its data-centre electricity tax break on 1 July 2026: data centres now pay the general class I rate of 2.24 c/kWh instead of 0.05 c/kWh. A planned replacement aid was dropped in September 2026, while a data centre register is being prepared. Grid access is the main constraint: Fingrid applies new technical requirements to large transmission-connected loads since June 2026, a draft grid code sets duties above 30 MW, and a draft priority procedure would keep data centres out of the protected connection group. Data centres of 500 kW IT or more fall under EU energy reporting. Renewables made 57% of power output in 2024. Finnish Government press release (24 Oct 2025)

Policy and incentives

Electricity used in data centres moved from tax class II (0.05 c/kWh) to the general class I (2.24 c/kWh) from 1 July 2026. Finnish Government press release (24 Oct 2025)

On 5 Dec 2025 the government planned a 10-year electricity tax relief for registered data centres that reuse waste heat or beat the efficiency level (capped at EUR 30m) and a data centre register. Finnish Government press release 165/2025

In the 2027 budget talks (1 Sept 2026) the government dropped the planned new financial support for data centres; Finance Minister Purra said it was no longer needed.

Power and grid

Fingrid applies its technical requirements for large demand facilities immediately (from 12 June 2026) to facilities connected directly to the transmission grid. Fingrid

Draft KJV2026 grid code: facilities above 30 MW, such as data centres, must ride through faults and be able to limit power intake; planned in force March 2027. Fingrid

A draft Electricity Market Act amendment (TEM) would rank connection requests when capacity is short; data centres are excluded from the protected group 1 and can move up by committing flexible generation.

Large industrial power price (band IE, excl. VAT) averaged 0.0517 EUR/kWh in 2025, about 58.4 USD/MWh. Eurostat nrg_pc_205

Sustainability, water and climate

Data centres with at least 500 kW installed IT power must publish their region and fall under EU data centre energy reporting (Act 846/2024, in force 30 Dec 2024); the Energy Authority supervises. Finlex 846/2024

57% of Finland's electricity production came from renewables in 2024 and 95% was fossil-free. Statistics Finland

Emission factor of electricity production fell to 26 g CO2/kWh in 2025. Fingrid-lehti

Data rules

No data localisation rule; transfers of personal data outside the EU/EEA follow GDPR chapter V (adequacy decisions or appropriate safeguards). European Data Protection Board, Kansainväliset tiedonsiirrot

Operators in Finland

All operators
OperatorFacilitiesOperational MWPipeline MWShare of operational MW
Glesys619.5 MW—8.5%
Equinix5———
atNorth441.6 MW590 MW18%
Microsoft4———
Google4———
Nebius275 MW310 MW33%
Verne270 MW70 MW30%
CSC2———
Telia124 MW—10%
Pure DC1—110 MW—
Hetzner1———
DayOne1—560 MW—
Borealis Data Center1———
Winda Energy1—100 MW—
Arcem1—60 MW—
TikTok1—50 MW—
QTS1———
HyperCo1———

Largest data center projects in Finland

Under construction and planned facilities with a stated capacity, largest first. 920 MW under construction and 930 MW planned in total.

ProjectLocationStatusTypeCapacity
DayOne Nurmijärvi (Sudentulli, Klaukkala)DayOne Nurmijärvi Planned Other 560 MW
atNorth FIN04 MyllykoskiatNorth Kouvola Under construction Hyperscale 430 MW
Nebius Lappeenranta (Pajarila)Nebius Lappeenranta Under construction Hyperscale 310 MW
atNorth FIN05 SaloatNorth Salo Planned Hyperscale 160 MW
Pure DC Seinäjoki (SJK01) Phase 1Pure DC Seinäjoki Under construction Hyperscale 110 MW
Winda Energy Janakkala (MORE-Rastikangas)Winda Energy Janakkala Planned Other 100 MW
Verne Mäntsälä (Kapuli)Verne Mäntsälä Under construction Colocation 70 MW
Arcem Joroinen (Huutokoski)Arcem Joroinen Planned Other 60 MW
TikTok LahtiTikTok Lahti Planned Hyperscale 50 MW

How Finland compares in Europe

Countries in the same region, by tracked capacity. Coverage grows as each country is researched.

CountryFacilitiesOperatorsOperational MWPipeline MW
United Kingdom205541,064 MW7,741 MW
Germany20063933 MW4,386 MW
France10620338 MW2,422 MW
Finland3918230 MW1,850 MW
Sweden4117172 MW1,510 MW
Ireland421653 MW1,278 MW
Norway228446 MW820 MW
Denmark331554.6 MW1,004 MW
Russia11121516 MW425 MW
Italy189245 MW693 MW
Netherlands11034217 MW449 MW
Iceland73286 MW—

Data center deals in Finland

Our Deal Tracker lists 15 deals in Finland since January 2026, with $32.15B in disclosed value.

  • Omnes Capital (CEP2 fund) → Heim Datacenter Financing
  • Sesterce → Sesterce Campus, former Kaipola paper mill, Jämsä Land / campus $11.19B · 200 MW
  • Applied Digital → Up to 1GW potential power capacity site in Finland (first non-US development) Land / campus · 1,000 MW
  • atNorth → FIN05, 28.6ha site, Salo (75MW phase 1; up to 230MW) Land / campus $2.24B · 75 MW
  • Google → Loviisa nuclear power plant life extension (supply for Google's Finnish data centers) Power deal
  • Google → Data center and clean energy investment in Finland (Hamina, Kajaani, Muhos, Vaala) Land / campus $15.15B

All Finland deals in the Deal Tracker

Facilities

39 facilities match. Each is checked against its source; source links come with the Excel data.

Facility Location Status Capacity Year Source
DayOne Nurmijärvi (Sudentulli, Klaukkala)DayOne
History
  1. Announced
  2. Planned
Nurmijärvi Planned 560 MW total — Operator / official
atNorth FIN04 MyllykoskiatNorth Kouvola Under construction 430 MW total — Operator / official
Nebius Lappeenranta (Pajarila)Nebius
History
  1. Announced
  2. Under construction
Lappeenranta Under construction 310 MW — Operator / official
atNorth FIN05 SaloatNorth
History · 1 deal
  1. Announced
  2. Planned
Salo Planned 160 MW IT — Operator / official
Pure DC Seinäjoki (SJK01) Phase 1Pure DC Seinäjoki Under construction 110 MW IT — Operator / official
Winda Energy Janakkala (MORE-Rastikangas)Winda Energy Janakkala Planned 100 MW IT — Operator / official
Nebius MäntsäläNebius Mäntsälä Operational 75 MW total — Operator / official
Verne Mäntsälä (Kapuli)Verne Mäntsälä Under construction 70 MW total — Operator / official
Verne Vantaa campus (The Air)Verne Vantaa Operational 70 MW total — Operator / official
Arcem Joroinen (Huutokoski)Arcem Joroinen Planned 60 MW total — Trade press
TikTok LahtiTikTok Cooling: Air or free cooling
History
  1. Planned
  2. Planned
Lahti Planned 50 MW total — Trade press
atNorth FIN02atNorth Cooling: Hybrid Espoo Operational 40 MW total — Operator / official
Telia Helsinki Data CenterTelia Cooling: Hybrid Helsinki Operational 24 MW IT — Operator / official
Glesys Pori (The Rock)Glesys
History
  1. Operational
  2. Operational
Pori Operational 11 MW total — Operator / official
Glesys Campus OuluGlesys
History
  1. Planned
  2. Under construction
  3. Planned
  4. Operational
Oulu Operational 8 MW IT 2026 Operator / official
atNorth FIN01atNorth Helsinki Operational 1.6 MW total — Operator / official
Glesys Tampere (The Deck)Glesys
History
  1. Operational
  2. Operational
Tampere Operational 0.5 MW total — Operator / official
Borealis Kajaani CampusBorealis Data Center Kajaani Operational — — Operator / official
CSC LUMI AI Factory data centerCSC
History
  1. Under construction
  2. Under construction
Kajaani Under construction — — Operator / official
CSC LUMI data center KajaaniCSC Kajaani Operational — 2022 Operator / official
Equinix HE3Equinix Helsinki Operational — — Operator / official
Equinix HE4Equinix Vantaa Operational — — Operator / official
Equinix HE5Equinix Helsinki Operational — — Operator / official
Equinix HE6Equinix Espoo Operational — — Operator / official
Equinix HE7Equinix
History
  1. Operational
  2. Operational
Espoo Operational — — Operator / official
Glesys Oulu Elektroniikkatie 15Glesys Oulu Operational — — Operator / official
Glesys Oulu Elektroniikkatie 5Glesys Oulu Operational — — Operator / official
Glesys Oulu Yrttipellontie 1Glesys Oulu Operational — — Operator / official
Google HaminaGoogle Cooling: Air or free cooling · Owned: self-build on the former Summa paper mill site
History
  1. Operational
  2. Operational
Hamina Operational — — Operator / official
Google KajaaniGoogle Owned: self-build by Tuike Finland Oy; the authority notes the project is publicly called Google's data centre
History
  1. Planned
  2. Planned
  3. Planned
Kajaani Planned — — Trade press
Google MuhosGoogle
History
  1. Planned
  2. Planned
  3. Planned
Muhos Planned — — Trade press
Google VaalaGoogle
History
  1. Planned
  2. Planned
Vaala Planned — — Trade press
Hetzner Datacenter Helsinki (Tuusula)Hetzner Tuusula Operational — — Operator / official
HyperCo Kouvola (Koria, TikTok)HyperCo
History
  1. Planned
  2. Under construction
Kouvola Under construction — — Operator / official
Microsoft EspooMicrosoft Espoo Under construction — — Operator / official
Microsoft GigaVaasa (Vaasa / Mustasaari)Microsoft Vaasa Planned — — Operator / official
Microsoft KirkkonummiMicrosoft Kirkkonummi Under construction — — Operator / official
Microsoft VihtiMicrosoft Vihti Under construction — — Operator / official
QTS ForssaQTS
History
  1. Planned
  2. Planned
Forssa Planned — — Trade press

Get the data

Every data center in Finland, in Excel

Every facility with operator, city, status, capacity, year and source, plus summaries and the status history. Built from the live tracker.

All countries

Global Data Center Database: annual licence

4,362 facilities

Every facility in the tracker worldwide, in Excel, with sources and status history. A fresh file every month for a year.

Request a quote

Scoped to the markets and fields you need. Quote within one business day.

Custom cut

One operator, one city, a capacity pipeline or a site-selection shortlist, prepared by our analysts.

Talk to an analyst

Free updates: data centers in Finland

Leave your work email and our team will send you new facilities, status changes and deals for this market, each checked against its source.

Request a quote

Finland

Tell us what you need. We reply by email with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your details stay private. We never sell or share them.
  • Used only to reply to your message
  • No spam: we only send what you asked for
  • Encrypted (SSL) form, handled by our own team

Privacy Policy

How we build the tracker

  • Sources: operator websites and announcements, stock-exchange filings, planning and government records, and named trade publications. Never another directory.
  • A second analyst re-opens each source before a facility is published.
  • Capacity, size, year, tier and PUE appear only when the source states them. Nothing is estimated.
  • Status: operational, under construction (building work started) or planned (announced or permitted, not yet under construction).
  • Map locations: a pin where the source gives the address, parcel or coordinates; otherwise a dot at the city centre (approximate).
  • Cooling type and tenancy (owned or leased in colocation) come from our site footprint research in planning, permit and operator records, shown where found.
  • Maps: Natural Earth (public domain). City locations: GeoNames, licensed under CC BY 4.0.

Questions

How many data centers are there in Finland?

DC Market Insights tracks 39 data centers in Finland as of November 2026: 20 operational, 9 under construction and 10 planned, run by 18 operators. The count grows as we verify more sites.

What is the data center capacity of Finland?

Tracked operational capacity in Finland is 230 MW, with 920 MW under construction and 930 MW planned. These totals use the capacity each source states (IT load where given) and cover 17 of 39 tracked facilities.

Which companies operate the most data center capacity in Finland?

By tracked operational capacity, the largest operators in Finland are Nebius (75 MW), Verne (70 MW) and atNorth (41.6 MW).

Where are the data centers in Finland located?

The largest clusters by tracked capacity are Helsinki (17 facilities), Kouvola (2 facilities) and Lappeenranta (1 facilities). The map above shows every site.

Which new data centers are being built in Finland?

We track 920 MW under construction and 930 MW planned. The largest projects are DayOne Nurmijärvi (Sudentulli, Klaukkala) (560 MW), atNorth FIN04 Myllykoski (430 MW) and Nebius Lappeenranta (Pajarila) (310 MW).

Where does this data come from?

Every facility comes from a page we opened: the operator’s own website or announcement, a stock-exchange filing, a planning or government record, or a named trade publication. A second analyst re-opens the source and checks the name, location, status and capacity before the row is published. We do not copy other data center directories.

What does the MW figure mean?

We show IT (critical) capacity when the source states it, otherwise the total or utility capacity the source gives, and say which in the facility’s note. When a source gives no capacity, the field stays empty. We never estimate it.

How exact are the map locations?

When the source gives an address or coordinates we use them. Otherwise the dot sits at the centre of the facility’s city (marked as approximate), using the GeoNames gazetteer.

How often is it updated?

The tracker is updated every week as new facilities are announced and existing ones change status. Each row shows the date it was last checked.

Can I get the data in Excel?

Yes. Each country with 50 or more facilities has a Capacity Sheet in Excel with every facility, its source link, the status history and summaries. Our analysts can also prepare an operator extract or a custom cut.

Global capacity

How much data center capacity is installed worldwide?

Installed and forecast capacity in MW by region and country, 2020 to 2035, with low, base and high cases. Updated every quarter.

Open the Global Capacity Tracker

Need the full list, or a capacity view of one market?

Our analysts prepare country and operator extracts in Excel, capacity pipelines and site-selection briefings.

Talk to an analyst

Request a quote

Data Center Map data

Tell us the markets, companies or sites and the fields you need. A senior analyst replies with scope, delivery date and a quote, usually within one business day.

Contact Form

Your data is safe with us

  • Your message goes straight to our research team
  • Your details stay private. We never sell or share them.

Privacy Policy